Loading...
HomeMy WebLinkAbout4.j. Payment #1, Armory Sanitary Sewer, City Project #236CITY OF ROSEMOIINT EXECUTIVE SUMMARY FOR ACTION CITY COUNCIL MEETING DATE: December 15, 1992 AGENDA ITEM: Payment #1, Armory Site Sanitary AGENDA SECTION: Sewer, City Project #236 Consent PREPARED BY: Bud Osmundson City Engineer/Assistant Public Works AGENDA rt 'V, Director .41 ATTACMdENTS: Payment Voucher #1 AP VED BY: � v This item requests the first payment to Richard Knutson, Inc. in the amount of $36,127.26 for City Project #236, Armory Site Sanitary Sewer. Work completed and represented in this amount as of November 18, 1992 is 12% of contracted work. The work has been inspected and is in compliance with contract documents. The remainder of the project will be completed in the spring of 1993. Easements still need to be acquired for thecompletionof the projects Attached is a copy of the pay voucher for your information. Staff recommends approval of this first payment request. RECO?0EF DED ACTION: MOTION TO APPROVE PAYMENT #1 TO RICHARD KNUTSON, INC.IN THE AMOUNT OF $83,557.54 FOR THE ARMORY SITE WATERMAIN, CITY PROJECT #236. COUNCIL ACTION: 5 a CITY OF ROSEMOUNT APPLICATION FOR PAYMENT NO.1 CITY PROJECT NO: 236 SEH FILE NO: 92040.01 PROJECT: Armory Site Sanitary Sewer Improvements Richard Knutson CONTRACT DATE: November 3,1992 CONTRACTOR: December 1, 1992 12585 Rhode Island Ave. So APPLICATION DATE: Savage, MN 55378 FOR PERIOD ENDING: November 18,1992 Total Amount Earned $ 38 Total Contract Amount $ 323,875.00 .028.70 Material Suitably Stored on Site, Not Incorporated into Work Contract Change Order No Percent CompletE Contract Change Order No. Percent CompletE Contract Change Order Nc. Percent Complete $ $ $ GROSS AMOUNT DUE .............................................. LESS 5% RETAINAGE .............................. .................. AMOUNT DUE TO DATE .......................................... $ $ $ 38,028.70 1,901.44 36,127.26 LESS PREVIOUS APPLICATIONS ............................ AMOUNT DUE THIS APPLICATION ...................... $ $ 36,127.26 APPROVED: Bud Osmundson, City Engineer/ Assistant Director of Public Works Si ORT ELLIO �t li=i %.; ..tCln cll- ltiu. APPLICATION FOR PAYMENT - - - - - - - - - - - - - - - - - - - - - - - - - 1. ..i .(UNIT PRICE CONTRACT) NO. 1 ST. PAUL )WNER: ROSEMOUNT, MINNESOTA OWNER'S PROJECT NO. 236 ------------------ ------------------------------------ ENGINEER'S PROJECT NO. 92040.01 --------------- ,OCATION: ARMORY SITE ------ :ONTRACTOR RICHARD KNUTSON, INC. CONTRACT DATE I3 `9aL, - -------------------- 12585 RHODE ISLAND' -AVE SO CONTRACT AMOUNT $323,875.00 SAVAGE MN 55378------------------------------- ' :ONTR. FOR ARMORY SITE - SANITARY SEWER IMPROVEMENTS .PPLIC . DATEf19- 'ERIOD END. 11/18/92 ------------------------- APPLICATION FOR PAYMENT ----------------------- CONTRACT QUANTITY UNIT DESCRIPTION UNIT QUANTITY TO DATE PRICE TOTAL •---------------------------------------------------------------- --------------------------------- L.S.. ------------------ -- ►150.501 MOBILIZATION 1 0 5 3400.00 1,7 00.00 )153.501 TEMPORARY FENCING )157.201 TRAFFIC CONTROL )207.401 REMOVE CONC C & G )207.402 REMOVE CM CULVERT L. F. 4000 405 L. S. 1 L. F. L. F. )207.409 REMOVE SANITARY MANHOLE EACH 100 42 2 1.25 506.25 2500.00 1.50 4.50 195.00 1207.410 REMOVE CONCRETE LIGHTING UNIT BASE EACH 2 1000.00 )207.423 SALVAGE SEWER METER EACH 1 370.00 'AGE 1 OF 5 SHORT-ELLIOTT-HENDRICKSON, INC.' .t, 1000.00 100 207.424 - SALVAGE LIGHTING UNIT EACH 211.502 CLEARING TREE 211.507 GRUBBING TREE 213.001 BALE CHECK BALE 213.003 SILT FENCE, PREASSEMBLED L.F. 213.005 ROCK CONST. ENTRANCE EACH 222.101 CRUSHED ROCK PIPE 14.65 146.50 120 FOUNDATION TON 222.103 GRANULAR PIPE FOUNDATION TON 222.107 REPLACEMENT BACKFILL TON 222.701 TEST ROLLING R.S. 222.801 SUBGRADE PREPARATION R.S. 223.803 AGG. BASE PLACED, CL 5 C.Y. 230.001 BORE 16" STEEL CASING L.F. 230.011 JACK 8" PVC CARRIER L.F. 250.701 AGG. SURFACING., CL 2 TON 250.903 AGG. SHOULDERING PLACED, CLASS 2 C.Y. 251.108 TYPE 41 WEARING COURSE MIXTURE TON 251.110 TYPE 31 BINDER COURSE MIXTURE TON 254.702 BIT. MAT. FOR TACK COAT GAL. 259.001 AGG. BASE RESTORATION IN-SY 259.011 BIT. SURFACE RESTORATION IN-SY 259.021 C & G RESTORATION L.F. 272.311 12" CM PIPE CULVERT L.F. 272.315 12" CM PIPE APRON EACH 273.011 4" PVC SEWER SERVICE L.F. 273.112 8"PVC SEWER,10'-15' DEEP L.F. 2 1000.00 100 45.00 100 45.00 50 5.00 600 220 1.50 330.00 1 595.00 100 7.65 100 4.50 8500 4.10 12 10.00 12 125,.00 180 10 14.65 146.50 120 102.00 120 10.85 900 7.10 150 15.55 135 28.05 135 27.00 70 1.50 700 0.65 350 3.85 100 12.00 45 15.25 2 83.50 75 6.50 638 448 16.90 7,571.20_ AGE 2 OF 5 SHORT-ELLIOTT-HENDRICKSON, INC. 273.113 8 -PVC SEWER,15'-20' DEEP L.F. 273.114 811PVC SEWER,20'-25' DEEP L.F. 273.119 -8"DIP SEWER,0'-10' DEEP L.F. 273.121 8 -DIP SEWER,15'-20' DEEP L.F. 273.122 8"DIP SEWER,20'-25' DEEP L.F. 1273.123 8 -DIP SEWER,25'-30' DEEP L.F. 1273.124 8 -DIP SEWER,30'-35' DEEP L.F. ►273.125 8"DIP SEWER,35'-40' DEEP L.F. 273.126 8"DIP SEWER,40'-45' DEEP L.F. 1273.211 12"DIP SWR,15'-20' DEEP L.F. 1273.331 27"RCP SWR,15'-20' DEEP L.F. 1273.332 27"RCP SWR,20'-25' DEEP L.F. 1273.333 27"RCP SWR,25'-30' DEEP L.F. 1273.334 27"RCP SWR,30'-35' DEEP L.F. )273.335 27"RCP SWR,351:740' DEEP L.F. )273.336 27"RCP SWR,40'-45' DEEP L.F. )273.501 STD MANHOLE, 10' DEEP EACH )273.511 EXCESS MANHOLE DEPTH L.F. 1273.521 MANHOLE DROP SECTION L.F. )273.531 MANHOLE CONNECTION EACH )273.611 8" X 4" PVC WYE EACH 1274.201 ABANDON EX. LIFT STATION L.S. 1274.211 WET PIT SEWAGE LIFT STATION L.S. 274.221 TEMPORARY PUMPING L.S. 274.311 6" DIP FORCEMAIN L.F. 274.321 CONNECT TO EX. FORCEMAIN EACH 274.401 VALVE VAULT L.S. 589 16.90 60_ 16.90 30 40.45 34 40.45 151 40.45 130 40.45 43 40.45 24 40.45 18 40.45 43 32 35.10 1,123.20 31 %69.10 520 69.10 186 69.10 168 69.10 162 _ 69.10 22 69.10 11 2 985.00 1,970.00 145 14 .65.00 910.00 25 6.5 172.50 1,121.25 2 235.00 3 35.00 1 4900.00 1 0.50 22350.00 11,175.00 1 5000.00 530 403 12.60 5,077.80 1 235.00 1 0.75 7130.00 5,347.50 AGE 3 OF 5 SHORT-ELLIOTT-HENDRICKSON, INC. 293.001 SEEDING ACRE 3 185.00 293.002 SEED, MIXTURE 600 LB. 225 4.40 293.005 SODDING, TYPE LAWN S.Y. 9600 1.50- 293.011 MULCH MATERIAL, TYPE 1 TON 6 200.00 293.019 DISC ANCHORING ACRE 3 165.00 293.023 WOOD FIBER BLANKET, TYPE HV S.Y. 293.032 COMM. FERTILIZER, ANALYSIS 12-12-12 LB. 295.501 FURNISH AND PLANT EVERGREEN TREE, COLORADO SPRUCE, 6' B&B TREE 295.502 FURNISH AND PLANT SHADE TREE, MARSHALL SEEDLESS ASH, 2 -TREE 295.503 FURNISH AND PLANT SHADE TREE, NORTHWOOD MAPLE, 2" CAL. TREE 295.505 FURNISH AND PLANT DECIDUOUS SHRUB, ALPINE CURRENT SHRUB 295.506 FURNISH AND PLANT DECIDUOUS SHRUB, POTENTILLA SHRUB 295.507 FURNISH AND PLANT DECIDUOUS SHRUB, DWARF KOREAN LILAC SHRUB 295.508 FURNISH AND PLANT DECIDUOUS SHRUB, PURPLE LEAF SAND CHERRY SHRUB 295.551 ROCK GARDEN S.Y. 652.201 CONSTRUCT LIGHTING UNIT BASE EACH 652.211 INSTALL SALVAGED LIGHTING UNIT EACH 200 500 2.10 0.50 6 1 150.00 150.00 32 180.00 33 5 180.00 900.00 10 25.00 12 25.00 10 25.00 10 25.00 230 10.00 2 1000.00 2 1000.00 AGE 4 OF 5 SHORT-ELLIOTT-HENDRICKSON, INC. • APPLICATION FOR PAYMENT - Continued Total Contract Amount $ 323,875.00 Total Amount Earned Material Suitably Stored on Site, Not Incorporated into Work Contract Change Order No. —. Percent Complete It Contract Change Order No. Contract Change Order No. Percent Comp e e Percent Complete __ $ 38,028.70 $ GROSS AMOUNT DUE .........................$ 3-8---'-o --- 2 8 770 LESS 5 % RETAINAGE .................. $ 1 901.44 AMOUNT DUE TO DATE .....................$ .36127.26 LESS PREVIOUS APPLICATION ........... $ '0" AMOUNT DUE THIS APPLICATION ..... $ 36,127.26 CONTRACTOR'S AFFIDAVIT The undersigned Contractor hereby swears under penalty of perjury that (1) all previous progress pay- ments received from the Owner on account of work performed under the contract referred to above have been applied by the undersigned to discharge in full all obligations of the undersigned d carred in connection with work covered by prior Applications for Payment and ais and equipment incorporated in said Project or otherwise listedin or encumbrancvered es. Payment Application for Payment are free and clear of all liens, claims, security interests a Dated % -2 , 19 92. Richard Knutson tractor By: �� (Na and Title) COUNTY OF �� ) SS STATE OF Minnesota 1'} day. of 1992 personally appeared Befor me nth'— known to me, who being duly sworn, did depose and say 100 1 of the Contractor above mentioned;. that he that he is the � � � (Office) ` executed the above Application for Payment and Affidavit on behalf of said Contractor; and that all of the statements contained complete. ,» FREDERICK m E is�. 1 s: Novy My Commission Expires: WWW, (Notary Public) 1012 71�7 rt of this The undersigned has checked the Contractor's Application for Payment m a a is to him under this Contract Application is the Contractor's Affidavit stating that all previous payments have been applied by him to discharge in full all of his obligations in connection with the work covered by all prior Applications for Payment. In accordance with the Contract, the undersigned approves payment to the Contractor of the Amount Due. S RTE O -H DRICKSON, .INC. Date 1 Z '" 9- By Page ____ 5_____ of