HomeMy WebLinkAbout4.a. Community Center Arena Discussionr
CITY OF ROSEMOUN'P
EXECUTIVE SUMMARY FOR ACTION
CITY COUNCIL MEETING DATE: MAY 19, 1992
AGENDA ITEM: COMMUNITY CENTER ARENA DISCUSSION
Mr.
AGENDA SECTION:
DEPARTMENT HEAD REPORT
PREPARED BY: STEPHAN JILK, CITY ADMINISTRATOR
AGENDA'1=M A
ATTACM1ENTS : / %NANG/AL DATA
APPROVED BY-
Y-
Mr. Ron Pederson and his committee continue to work on the development of
financial and cost information on the proposed arena.
Mr. Pederson will provided additional information on the project and feels
it prudent to provide an update to the Council on the project at this time.
Financial information and the arena proposal will be made available before
the meeting by Mr. Pederson.
RECOBDUMED ACTION:
None.
COUNCIL ACTION:
2W 1
Rosemount ice Arena
Income and Cash Flow
$ In Thousands
300
250-..._..__....__ ----..__....._...._.
200
150
100
50
93 94 95 96 97 98 99 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
12 Months Ending August
Operating Income --1 Debt Service §� Cash Flow
Ice Arens Cash Flow
Period
August 1993 - August 1994
August 1994 - August 1995
August 1995 - August 1996
August 1996 - August 1997
August 1997 - August 1998
August 1998 - August 1999
August 1999 - August 2000
August 2000 - August 2001
August 2001 - August 2002
August 2002 - August 2003
August 2003 - August 2004
August 2004 - August 2005
August 2005 - August 2006
August 2006 - August 2007
August 2007 - August 2008
August 2008 - August 2009
August 2009 - August 2010
August 2010 - August 2011
August 2011 - August 2012
August 2012 - August 2013
August 2013 - August 2014
August 2014 - August 2015
August 2015 - August 2016
August 2016 - August 2017
Income
246,994
255,639
264,586
273,847
283,432
293,352
303,619
314,246
325,245
336,629
348,411
360,605
373,226
386,289
399,809
413,802
428,285
443,275
458,790
474,848
491,468
508,669
526,472
544,899
Expenses
116,000
120,060
124,262
128,611
133,112
137,771
142,593
147,584
152,749
158,095
163,628
169,355
175,282
181,417
187,767
194,339
201,141
208,181
215,467
223,008
230,813
238,891
247,252
255,906
Opersti
Inc"
130,9
135,5
140,3
145,2
150.,3
155,5
161,0
166,6
172,4
178,5
184,7
191,2
197,9
227,
235,
243,
251,
260,
269,
279,
288,
Debt
Service
121,906
126,906
126,590
131,276
130,646
135,016
139,070
142,810
146,236
154,346
156,826
163,990
170,526
176,430
181,706
191,350
195,050
203,120
210,246
216,426
226,660
235,636
243,350
249,806
Arcual
Cash Fla+
After
Debt
Service
9,088
8,673
13,734
13,960
19,674
20,565
21,956
23,852
26,260
24,188
27,957
27,260
27,418
28,442
30,336
28,113
32,094
31,974
33,077
35,414
33,995
34,142
35,870
39,187
Cumutative
Cash flaw
After
Debt
Service
9,088
17,761
31,495
45,455
65,129
85,694
107,650
131,502
157,762
181,950
209,907
237,167
264,585
293,027
323,363
351,476
383,570
415,544
448,621
484,035
518,030
552,172
588,042
627,229
Ice Arena Operating Income
(Escalation - 3.5$ Annually)
Period
August
1993 -
August
1994
August
1994 -
August
1995
August
1995 -
August
1996
August
1996 -
August
1997
August
1997
- August
1998
August
1998
- August
1999
August
1999
- August
2000
August
2000 -
August
2001
August
2001 -
August
2002
August
2002 -
August
2003
August
2003
- August
2004
August
2004
- August
2005
August
2005-
August
2006
August
2006 -
August
2007
August
2007 -
August
2008
August
2008 -
August
2009
August
2009 -
August
2010
August,2010
-
August
2011
August
2011 -
August
2012
August
2012 -
August
2013
August
2013
- August
2014
August
2014 -
August
2015
August
2015 -
August
2016
August
2016 -
August
2017
Income
246,994
255,639
264,586
273,847
283,432
293,352
303,619
314,246
325,245
336,629
348,411
360,605
373,226
386,289
399,809
413,802
428,285
443,275
458,790
474,848
491,468
508,669
526,472
544,899
or
Expenses
116,000
120,060
124,262
128,611-
133,112
137,771
142,593
147,584
152,749
158,095
163,628
169,355
175,282
181,417
187,767
194,339
201,141
208,181
215,467
223,008
230,813
238,891
247,252
255,906
Operating
Income
130,994
135,579
140,324
145,236
150,320
155,581
161,026
166,662
172,496
178,534
184,783
191,250
197,944
204,872
212,042
219,463
227,144
235,094
243,323
251,840
260,655
269,778
279,220
288,993
Original Principal Amount
Amount Available for construction
(Excludes 2% closing costs and 1st
payments. Includes investment i
Interest Rate
Term of Bonds in Years
Number of Payments per Year
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Principal
interest
st @ 5.5%)
Payment
$1,935,000
-------------
$1,826,542
-------------
6.30%
-------------
25.00
-------------
2.00
-------------
08/01/92
02/01/93
$0
$60,953
$60,953
08/01/93
$0
$60,953
$60,953
02/01/94
$0
$60,953
$60,953
08/01/94
$0
$60,953
$60,953
02/01/95
$0
$601953
$60,953
08/01/95
$5,000
$601953
$65,953
02/01/96
$0
$60,795
$60,795
08/01/96
$5,000
$60,795
$65,795
02/01/97
$0
$60,638
$60,638
08/01/97
$10,000
$600638
$70,638
02/01/98
$0
$60o323
$60,323
08/01/98
$10,000
$600323
$70,323
02/01/99
$0
$601008
$60,008
08/01/99
$15,000
$60,008
$75,008
02/01/00
$0
$59
535
$59,535
08/01/00
$20,000
$59535
$79,535
02/01/01
$0
$58
905
$58,905
08/01/01
$25,000
$58
905
$83,905
02/01/02
$0
$58
118
$58,118
08/01/02
$301,000
$580118
$88,118
02/01/03
$0
$57,173
$57,173
08/01/03
$40,000
$57,173
$97,173
02/01/04
$0
$55913
$55,913
08/01/04
$45,000
$55
913
$100,913
02/01/05
$0
$54
495
$54,495
08/01/05
$55,000
$54
495
$109,495
02/01/06
$0
$52
763
$52,763
08/01/06
$65,000
$52
763
$117,763
02/01/07
$0
$50
715
$50,715
08/01/07
$75,000
$50
715
$125,715
02/01/08
$0
$48
353
$48,353
08/01/08
$85,000
$48
353
$133,353
02/01/09
$0
$45
675
$45,675
08/01/09
$100,000
$45
675
$145,675
02/01/10
$0
$42
525
$42,525
08/01/10
$110,000
$42
525
$152,525
02/01/11
$0
$39
060
$39,060
08/01/11
$125,000
$39
060
$164,060
02/01/12
$0
$35
123
$35,123
08/01/12
$140,000
$35
123
$175,123
02/01/13
$0
$30
713
$30,713
08/01/13
$155,000
$30
713
$185,713
02/01/14
$0
$25
830
$25,830
08/01/14
$175,000
$25
830
$200,830
02/01/15
$0
$20
318
$20,318
08/01/15
$195,000
$20
318
$215,318
02/01/16
$0
$14
175
$14,175
08/01/16
$215,000
• $14
175
$229,175
02/01/17
$0
$7
403
$7,403
08/01/17
$235,000
$7
403
$242,403
Balance
$1,935,000
$1,935,000
$1,935,000
$1,935,000
$1,935,000
$1,935,000
$1,930,000
$1,930,000
$1,925,000
$1,925,000
$1,915,000
$1,915,000
$1,905,000
$1,905,000
$1,890,000
$1,890,000
$1,870,000
$1,870,000
$1,845,000
$1,845,000
$1,815,000
$1,815,000
$1,775,000
$1,775,000
$1,730,000
$1,730,000
$1,675,000
$1,675,000
$1,610,000
$1,610,000
$1,535,000
$1,535,000
$1,450,000
$1,450,000
$1,350,000
$1,350,000
$1,240,000
$1,240,000
$1,115,000
$1,115,000
$975,000
$975,000
$820,000
$820,000
$645,000
$645,000
$450,000
$450,000
$235,000
$235,000
$0
Rosemount Ice Arena
Operating Budget
Income
Youth Hockey"Associations/Showcase R
1,120 hrs @ prime rate - $105/hr
356 hrs @ non prime rate - $84/hr
Figure
Skating Club
140
hrs @ non prime rate
- $84/hr
High school Practice
410
hrs @ discount rate -
$63/hr
Park &
Recreation
56
hrs @ prime rate - $105/hr
225
hrs @ non prime rate
- $84/hr
School
Phy Ed
240
hrs @ discount rate -
$63/hr,
Total
projected ice income
Concessions/sales - net
Skate sharpening - net
Admissions and instruction fees
(are assumed to be part of rental ar
such do not coo directly to arena)
Off season activities
(are not committed at this time and
Summer ice (one month) - net
(amount is based on $25,000 income
start-up, maintenance and operatinc
Total Income
Expenses
Administrative
Maintenance (personnel - 35 weeks)
Utilities (35 weeks)
Insurance
Supplies/Services
Concession & vending expenses are
net income projections
Total Expenses
Net Operating Income
as
$147,504
11,760
25,830
24,780
15,120
224,994
14,000
3,000
0
0
included)
5,000
ass $20,000
expense)
Luded in
246,994
12,000
43,000
43,000
8,000
10,000
116,000
$130,994
i.
2.
3.
4.
5.
6.
7.
8.
s.
Rosemount
Other Possible Sources
(Not Included in
Minnesota Amateur Hockey Assoc
summer).
Summer Hockey.
Hockey Schools (summer).
Junior B Hockey - For hockey play
pro.
Trade Shows - Summer.
Revenue from banquet facility - $2
One time or annual contributions f
Rosemount Area Hockey Assoc
U.S.P.C.i. - Fund (beginning Fall
Arena
Capital or income
-Coaches clinics (Pre -season or
between high school and college or
0 - $30,000 annually.
the business community.
(RAHA) contributions.
We will continue to work on finning up the 4bove items to provide as much
cushion as possible in supporting cash flo and servicing debt.
Schedule of Ice Hours
Pre-Season
(9/15 - 10/31)
Non.
Tue.
wed.
Thur.
Fri.
--._
y.......
-
'" " " '
.......
_.._ ..
-------
_-Sat.
----
Assoc./Showcase
Assoc./showcase
_ 6:OOAM - 7:OOAM (Mon-prime)
7:15AM - 8:15AM (Mon-prime)
Figure Skating
Figure Skating
figure Skating
Figure Skating
Figure Skating
Assoc./Showcase
Assoc./Showcase
8:30AM - 9:30AM (Prime)
Phy. Ed.
Phy. Ed.
Phy. Ed.
Phy. Ed.
Phy. Ed.
Assoc./Showcase
Assoc./Showcase
9:45AN - 10:45AN (Prime)
Phy. Ed.
Phy. Ed.
Phy. Ed.
Phy. Ed.
Phy. Ed.
Assoc./Showcase
Assoc./Showcase
11:00AN - 12:00PM (Prime)
Recreation (Open)
Recreation (Open)
Recreation (Open)
Recreation (Open)
Recreation (Open)
Assoc./Showcase
Assoc./Showcase
Assoc./Showcase
Assoc./Showcase
12:15PH - 1:15PM (Prime)
Assoc./Showcase
Open Sketirig
1:30PH - 2:30PH (Prime)
2:45PH - 3:45PH (Prime)
High School
High School
High School
High School
High School
Assoc./Shower
Open Skating
4:00PM - 5:00PN (Prime)
High School
High School
High School
High School
High School
Assoc./Showcase
Assoc./Showcase
5:15PM - 6:15PH (Prime)
Assoc./Showcase
Assoc./Showcase
Assoc./Showcase
Assoc./Showcase
Assoc./Showcase
Assoc./Showcase
Assoc./Showcase
6:30PH - 7:30PH (Prime)
Assoc./Showcase
Assoc./Showcase
Assoc./Showcase
Assoc./Showcase
Assoc./Showcase
Assoc./Showcase
Assoc./Showcase
7:45PN - 8:45P% (Prime)
Assoc./Showcase
Assoc./Showcase
Assoc./Showcase
Assoc./Showcase
Assoc./Showcase
Assoc./ShowcsN
Assoc./Showcase
9:00PN - 10:00PM (Non-prime)
Assoc./Showcase
Assoc./Showcase
Assoc./Showcase
Assoc./Showcase
Assoc.! a
Assoc.
roc.
Assoc./Showcase
10:15PM - 11:15PM (Mon-prime)
Spry
--...__Total
ockey Associations
33 hrs./wk X 7 wks a $105/hr.
$24,255
12 hrs./wk X 7 wks a S84/hr.
7,055
' igure Skating Club
2,940
5 hrs./wk X 7 wks a $84/hr.
igh School Practice
4,410
10 hrs./wk X 7 wks a $63/hr.
ark and Recreation (Open skating)
1 470
2 hrs./wk X 7 wks a $105/hr.
2,940
5 hrs./wk X 7 wks a $84/hr.
i
chool Phy. Ed.
10 hrs./wk X 7 wks a $63/hr.
4,410
.......
Total
$47,481
aaaazaz
i Schedule of Ice Hours
Hain Season
(11/1 - 2/28)
3
Non.
Tue.
wed.
Thur.
Fri.
Sat.
Sun.
-------
.......
6:00AN - 7:00M(Non-prime)
----•--
High School
.......
Nigh School
.......
High School
-------
High School
.......
Nigh School
Hockey Assoc.
Hockey Assoc.
7:15AN - 8:15AN (Non -prime)
Figure Skating
Figure Skating
Figure Skating
Figure Skating
Figure Skating
Hockey Assoc.
Hockey Assoc.
8:30AN - 9:30AN (Prime)
Phy. Ed.
Phy. Ed.
Phy. Ed.
Phy. Ed.
Phy. £d.
Hockey Assoc.
Hockey Assoc.
9:45AN - 10:45AN (Prime)
Phy. Ed.
Phy. Ed.
Phy. Ed.
Phy. Ed.
Phy. Ed.
Hockey Assoc.
Hockey Assoc.
11:00AM - 12:00PM (Prime)
Recreation (Open)
Recreation (Open)
Recreation (Open)
Recreation (Open)
Recreation (Open)
Hockey Assoc.
Hockey Assoc.
12:15M - 1:15PH (Prime)
Hockey Assoc.
Hockey Assoc.
1:30PH - 2:30PH (Prime)
Nigh School
High School
High School
High School
Nigh School
Hockey Assoc.
Open Skating
2:45PH - 3:45PN (Prime)
High School
High School
Nigh School
Nigh School
Nigh School
Hockey Assoc.
open Skating
4:00PN - 5:00PN (Prime)
High School
High School
High School
High School
High School
Hockey Assoc.
Hockey Assoc.
50 5PN - 6:15PH (Prime)
Hockey Assoc.
Hockey Assoc.
Hockey Assoc.
Hockey Assoc.
Hockey Assoc.
Hockey Assoc.
Hockey Assoc.
! 6:30PH-7:30PN (Prime)
Hockey Assoc.
Hockey Assoc.
Hockey Assoc.
Hockey Assoc.
Hockey Assoc.
Hockey Assoc.
Hockey Assoc.
7:45PH - 6:45Pl1 (Prime)
Hockey Assoc.
Hockey Assoc.
Hockey Assoc.
Hockey Assoc.
Hockey Assoc.
Mackay Assoc.
Nockey Assoc.
9:00P14 - 10:OOPM (Non -prime)
Hockey Assoc.
Hockey Assoc.
Hockey Assoc.
Hockey Assoc.
Hockey Assoc.
Hockey Assoc.
Hockey Assoc.
10:15PH - 11:15PN (Non -prime)
i
Senior/eroombalt
Senior/Broombell
Senior/eroombett
Senior/eroombetl
Senior/eroaaball
Hockey Assoc. '
Summary
................................
Total
-------------------
ockey Assoctations
33 hre./wk X 17 wks 8 $105/hr.
$58,905
12 hrs./wk X lT wks 2 $84/hr.
17,136
igure Skating Club
5 hrs./wk X 17 wks 21 $84/hr.
7,140
igh School Practice
20 hrs./wk X 17 wks A $63/fir.
21,420
dirk and Recreation (Open skating, Sr./Broombetl)
2 hrs./wk X 17 wks 9 $105/hr.
3,570
10 hrs./wk X 17 wks 2 $84/hr.
14,280
i
:hoot Phy. Ed.
10 hrs./wk X 17 wks 21 S63/hr.
10,710
Total
$133,161
x
Schedute of let Hours
Post-Season
(3/1 - 3/31)
s
Hon.
Tue.
wed. Thur. Fri.
Set.
Sun.
E.......
.......
------- ----.......
.......
-------
L 6:00AM - 7:00AM (Mon-prime)
Hockey Assoc.
Hockey Assoc.
Hockey Assoc. Hockey Assoc. Hockey Assoc.
Hockey Assoc.
Hockey Assoc.
7:15AM - 8:15M (Mon-prime)
Figure Skating
Figure Skating
Figure Skating Figure Skating Figure Skating
Hockey Assoc.
Hockey Assoc.
8:30AM - 9:30AM (Prism)
Hockey Assoc.
Hockey Assoc.
9:45AM - 10:45AM (Prism)
Hockey Assoc.
Hockey Assoc.
11:00AM - 12:OOPM (Prise)
Recreation (Open)
Recreation (Open)
Recreation (Open) Recreation (Open) Recreation (Open)
Hockey Assoc.
Hockey Assoc.
12:15PM - 1:15PH (Prism)
Hockey Assoc.
Hockey Assoc.
1:30PH - 2:30PH (Prism)
Hockey Assoc.
Open Skating
2:45PH - 3A5PM (Prise)
Hockey Assoc.
Open Skating
4:00PM - 5:00PM (Prise)
Hockey Assoc.
Hockey Assoc.
5:15PM - 6:15PM (Prise)
Hockey Assoc.
Hockey Assoc.
Hockey Assoc. Hockey Assoc. Hockey Assoc.
Hockey Assoc.
Hockey Assoc.
6:30PH - 7:30PH (Prise)
Hockey Assoc.
Hockey Assoc.
Hockey Assoc. Hockey Assoc. Hockey Assoc.
Hockey Assoc.
Mackay Assoc.
7:45PM - 8:45PH (Prime)
Hockey Assoc.
N
.
9:OOP" - 10:00PM (Mon-prise)
Hockey Assoc.
Hockey Assoc.
Hockey Assoc. Hockey Assoc. Hockey Assoc.
Hockey Assoc.
Hockey Assoc.
10:15PM - 11:15PH (Mon-prise)
Hockey Assoc.
Sun mry
Total
-
- ockey Associations
i 33 hrs./wk X 4 wks 8 $105/hr.
$13,860
_ 17 hrs./wk X 4 wks a $84/hr.
5,712
igure Skating Club
_ 5 hrs./wk X 4 wks 8 $84/hr.
1,680
ark and Recreation (Open skating)
- 2 hrs./wk X 4 wks a $105/hr.
840
> 5 hrs./wk X 4 wks a S84/hr.
1,680
Totat
S23,772
i
7
Schedule of Ice Hours
Spring Showcase
(4/1 - 5/22)
L
D
Non. Tue. Wed.
Thur. Fri. Sat.
Sun.
E.......
L 6:OOAM - 7:0001 (Non -prime)
------ -------
------- ------- .......
.......
7:15AN - 8:15AN (Non -prime)
8:30AN - 9:30AM (Prime)
Showcase Hockey
Showcase Hockey
9:45AM - 10:45AM (Prime)
Showcase Hockey
Showcase Hockey
11:00AN - 12:OOPM (Prime)
Showcase Hockey
Showcase Hockey
12:15PM - 1:15PH (Prime)
Showcase Hockey
Showcase Hockey
1:30PH - 2:30PM (Prime)
Showcase Hockey
Showcase Hockey
2:45PH - 3:45PM (Prime)
Showcase Hockey
Showcase Hockey
4:00PH - 5:00PN (Prime)
Showcase Hockey
Showcase Hockey
5:15PH - 6:15PH (Prime)
Showcase Hockey
Showcase Hockey
i
' 6:30PH = 7:30PH (Prime)
Showcase Hockey Showcase Hockey Showcase Hockey
Showcase Hockey Showcase Hockey Showcase Hockey
Showcase Hockey
_ 7:45PM 8:45P14(Prime)
Showcase Hockey Showcase Hockey Showcase Hockey
Showcase Hockey Showcaaa Hockey
9:00PN - 10:00PH (Nan -prime)
10:15PM - 11:15PM (Mon -prime)
Summary
Total
_
Showcase Hockey
-------------------
28 hrs./wk X 7 As 8 5105/hr.
$20,580
=o.aa:a
Rosemount Ice Arena
Computation of Reduced Cost Arena
Original Budget Total
Cost Adjustments:
Package Rink Costs
Rink Floor
Subsoil
Insulation
Refrigeration
Heat Reclaimer
Subtotal Package Costs
Other Adjustments
Site Work
Elevator
Skate Tile
Dashers
Bleachers
Zamboni
Edger
Goals
Radiant Heat
Sound System
Scoreboard
Subtotal Other Adjustments
Total Cost Adjustments
Total Reduced Cost Budget
Notes:
original
Budget
----------
93,500
25,000
17,000
200,000
20,000
355,500
----------
217,100
80,000
26,000
100,000
30,000
0
0
0
30,000
20,000
6,000
509,100
Revised
Cost
--=-------
Savings
(Additional
cost)
----------
249,500 106,000
--- --- ------
152,100
0
15,755
65,570
10,000
34,040
750
1,095
0
10,000
0
289,310
65,000
80,000
10,245
34,430
20,000
(34,040)
(750)
(1,095)
30,000
10,000
6,000
219,790
Reduced
Cost
Budget
$2,150,000
325,790
$1,824,210
We were able to find a package deal on the rink flooring and
refrigeration.
Site work cost is reduced because the work will be done simultaneous
with construction of the Armory and not at a later date.
The elevator has been removed from the budget.
Radiant heat has been delayed.
Skate tile, dashers and bleachers cost adjustments reflect savings for
assembly by us.
The sound system adjustment reflects prchase of a less expensive
unit.
The scoreboard will be donated by Peps in exchange for concessions.
MEMORANDUM
DATE: April 20, 1992
TO: Ron Pederson, Rosemount Are
FROM: Del Erickson
SUBJECT: Preliminary Construction
Coccnittee
t Estimate
The following estimates are based di a schematic plan (dated April 93 1992)
which we prepared to propose a cone pt to add an arena to the armory and
CO=Unity center design. This was -reviewed at a April 10, 1992 meeting
with you, Steve Jilk, and Art -Dicker, Architects for the armory.
We understand from that meeting tha an alternate to create an unfinished
basement space'is planned to-acc to arena needs similar to our plan
as shown. Further a connection and exterior entry should be planned at
the lower level.. A stair and elevator would be desirable at this location:.
The lobby'space, public toilets, anentry are planned for use of the
theatre and banquet hail.. This cou d be available for.arena events if they
do not conflict per scheduled event The ten or twelve times during year
when high school games are held would not have a significant impact on
lobby and presumably events could b co-ordinated.
We have based the following cost.est
costs and breakdown to identify vari
of an arena lobby, toilets, and entn
conflict; and additional shell space
out use of basement area.
Arena Cost Estimate per plan 4/9/92
1. General Conditions
2. Sitework
Assumes all grading excavat
of arena site plus 126 car.
imates on the foregoing, with alternative
ousoptions.. These include the addition*
i
y, f necessary to.omit any potential
of 4,000 feet to accommodate needs with
and.development
3.. Concrete
Includes concrete rink floor and seating.
4. Masonry
Includes brick exterior and concrete block
interior to metal facia linqp.
S . Steel
Includes steel truss, roof
system above masonry line.
and facia
$1051600..00
111,500.00
•210,900.00
138,400.00
339,300.00
+_* b 1 0 ' 3Dtd 71101 **
A1aI ANDUM
pri ,"1992
Page 2
6. Carpentry
7.. Weatherization
8. Doors /Windows
Includes alum entry, HK doors, etc.
9. Finishes
Quality level of finishes.
10. Specialties
Includes seating and locker roun..
13. Rink Cons truc tion
.Indirect system in floor with' so
reclaim, dehumidification and she
14. Elevator
15. Mechanical
1, heat
s .
Plumbing, HVAC, fire sprinkler heat.
16. Electrical
Subcontractor 0 & P
Total Construction Cost Estimate
Contingency 5%
A/E Fees and Costs
Total Project Budget
Cost Elements included above
High.School Locker Room
600 S.F. complete with locket
shower.
Figure Skating Club Roan
480 S.F. complete with locker
Elevator and Lower Level Connec
800 S.F. with stair and eleva
Site Work beyond building
Paving and parking for 126 ca;
ALTERNATES / ADDITIONAL COSTS
Basement costs (armory alt.)
Add 4,000 S.F. shell in lieu of
Add 3,000 S.F. lobby, toilets &
, toilet,
$ 201000.00
10,700.00
54,600.00
66,600.00
392•,000.00
40,000.00
178,800.00
147,000.00
35,900.00
$:!'$915,100.00
$
95,700.00-
139,200.00
5,700.00139,200.00
$22150,000.00
$ 573,000.00
control roan. 33,000;00
ing Link 803000.00
�r. .
65,000.00 .
$80;000.00 -.$ 150,000.00
asement $ 100,000.00
ntry $ 180,000.00