HomeMy WebLinkAbout10.a Consideration of Scope of Services From SEH / Pauley - Olsen to Complete Planning and Design of the Business ParkCITY OF ROSEMOUNT
EXECUTIVE SUMMARY FOR ACTION
PORT AUTHORITY COMMISSION MEETING DATE: NOVEMBER 2, 1992
AGENDA ITEM:
AGENDA SECTION:
SCOPE OF SERVICES FOR BUSINESS PARK PLAN
NEW BUSINESS
PREPARED BY:
AGENDA NO.
JOHN MILLER, ECONOMIC DEVELOPMENT COORDINATOR
ATTACHMENTS:
APPROVED BY:,"
"SCOPE OF SERVICES" FROM SEH
At the Port Authority's October 20 work session, Dick Hansen of Lexington
Standard reviewed his efforts to find a location for his expanded business.
After his presentation there was general discussion about the need to have
industrial and business lots available.
Earlier the commissioners had directed me to look at the feasibility of
creating a business park south of C.R. 42 and east of T.H. 3. Steve Jilk
and I have met with the development staff and with the city's consulting
engineer, SEH, regarding preparation of a plan for the business park.
Attached for your review is a scope of services submitted by SEH and
reviewed by Steve and me and the city staff people. If you agree to have
SEH complete the work as outlined, you will get:
• An overall concept plan showing road, utility, and business lot
locations.
• A proposed phasing of the project over its 400-500 acre area.
• Estimated costs for infrastructure.
With this plan and with land costs that Ed Dunn, Steve Jilk, and I have
been determining, the Port Authority should be in a position to determine
the feasibility of developing the business park.
The plan is necessary for me to have in approaching private developers in
soliciting their participation in the project.
RECOMMENDED ACTION:
Motion to approve a scope of services for completion of business park
planning and design as submitted on October 20, 1992 by SEH for a cost
not to exceed $10,000.
PORT AUTHORITY ACTION:
Adir
Adow
AMAWASEH
ENGINEERS I ARCHITECTS ■ PLANNERS
October 26, 1992
Mr. John Miller
Economic Development Coordinator
City of Rosemount
2875145th Street West
Rosemount, Minnesota 55068
3535 VADNAIS CENTER DRIVE, ST PAUL, MN 55110-5108 612490-2000 800325-2055
RE: Rosemount, Minnesota Business Park Concept Plan - Section 32
Dear Mr. Miller:
In response to our meetings of October 9 and October 23, 1992, we have prepared a Scope of
Work for the Business Park Concept Plan which has been proposed for the portion of Section 32
located east of S.T.H. 3. This scope is based on our understanding of your needs as previously
discussed. However, the Scope is subject to modification and revision by the City as necessary
to meet any additional needs that you may have.
The purpose of the Business Park Concept Plan will be to assist City staff in working with
businesses who may be interested in locating on this property. The following is a list of major
goals for the Business Park as they were discussed at our previous meetings:
1. Provide a business park within the City of Rosemount which is readily available for
development.
2. Provide additional customers to existing businesses in this area of the community.
3. Develop a high quality/high amenity site, especially along CSAH 42. Utilize the natural
topography to improve the aesthetics of the site.
4. Develop a site which contains a variety of lot sizes which would appeal to a wider variety
of businesses.
5. Consider the transition of land uses from "high quality" on the north to the existing land
uses on the south.
6. Provide a site with a "business campus" or an "industrial campus" feel rather than the
"old fashioned industrial park" look.
7. Develop a plan that is consistent with the Comprehensive Guide Plan and consistent with
development on the CMC property to the north.
SHORT ELLIOTT
HENDRICKSON INC. ST. CLOUD, MN CHIPPEWA FALLS, WI
MADISON, WI
Mr. John Miller
Page 2
October 26, 1992
The tasks which are necessary to accomplish these goals are listed below along with budget figures
for engineering.
Evaluate Site for Proposed Land Use
■ Review industrial/ commercial market studies as provided $ 240
by the City.
■ Consider an appropriate mix of light industrial/commercial $ 230
and office space land uses.
■ Develop a conceptual layout showing the location of each type $ 180
of use.
Evaluate Site for Utility Requirements Based on Projected Land Uses
Develop requirements for sanitary sewer and complete $ 470
preliminary design in accordance with the proposed
Comprehensive Sanitary Sewer Plan and the 1991 Comp-
rehensive Sewer Plan Update.
■ Develop requirements for watermain and complete $ 470
preliminary design in accordance with the proposed
Comprehensive Water System Plan.
■ Complete a hydraulic analysis of the site to determine $ 3,000
ponding requirements. This will include reanalysis of
the CMC property to the north due to the revised land use
that has been proposed. Include review of wetland regulations.
Evaluate Site for Roadway and Access Requirements
■ Coordinate with the traffic study currently underway $ 210
in the western portion of the City of Rosemount.
Incorporate applicable results of the study into the
Business Park Concept Plan.
■ Consider an access at CSAH 42 opposite CMC as well as $ 140
the feasibility of other logical access points on CSAH 42,
Biscayne Avenue, 145th Street, and S.T.H. 3.
Consider the need for frontage road construction and the $ 470
need for other roadways within the site. Review the
feasibility of an internal roadway which would connect
to S.T.H. 3 at Canada Avenue.
Mr. John Miller
Page 3
October 26, 1992
Evaluate Site Layout of Lots and Staging of Improvements
■ Consider utility and roadway requirements as well as $ 230
tax increment and MUSA restrictions in the development
of a staging plan.
■ Consider the importance of appropriate aesthetics in Phase I $ 140
of the development, and include a general review of the
aesthetic parameters provided by the City. An aesthetically
pleasing site will result in the attraction of future
development within the Business Park.
■ Consider the transition in land use from the north to the $ 230
south end of the site in the development of a staging plan.
Evaluate Site in Terms of Costs for the Proposed Improvements
■ Prepare budget figures for construction of all improvements $ 770
proposed.
■ Prepare budget figures for each stage of the improvements. $ 390
Include acquisition and relocation costs of existing property
into the budget figures. These costs will be provided by
the City. Include costs for the future upgrade of Biscayne
Avenue in the budget figures. These costs will also be
provided by the City.
Prepare a Business Park Concept Plan and Associated Costs for the City's Review
■ Prepare a map showing the concepts for land use, utilities,
roadways, lot layout and staging.
■ Prepare text with a brief explanation of the plan including
the budget figures for construction.
■ Meet with City officials to review the plan and modify
if necessary.
Subtotal:
Contingencies
Total Estimated Cost for
Preparation of the Plan:
$ 850
$ 380
$ 530
$ 8,930
$ 1,070
$10,000
Mr. john Miller
Page 4
October 26, 1992
We hope this will give you the information you are looking for in terms of scope, cost and schedule.
The estimated costs are based on the scope as listed. Therefore, any change in the scope which
occurs during the project will naturally result in a change in the associated costs.
The time required to complete the tasks identified above will be approximately one (1) month after
receipt of all necessary information from the City.
If this proposal is acceptable to you, please sign below and return a copy for our files. We look
forward to working with you on this important andinteresting project.