HomeMy WebLinkAbout6.b. 1992 Fee and Rate IncreasesCITY OF ROSEMOUNT
4' EXECUTIVE SUMMARY FOR ACTION
CITY COUNCIL MEETING DATE: DECEMBER 17, 1991
AGENDA ITEM: 1992 FEE AND RATE INCREASES AGENDA SECTION:
NEW BUSINESS
PREPARED BY: SUSAN L. VANDERHEYDEN AGENDA NITEM
ASSISTANT CITY ADMINISTRATOR
ATTACHMENTS: RESOLUTION APPROVED BY:
The attached resolution is a compilation of many of the various fees and
rates the City must re-establish every year. Staff has attempted to gather
as many fees and rates as possible into one document. It is our hope that
by the end of 1992, all fees and rates will be approved through the
adoption of one resolution.
The following fees are included within this resolution:
Planning and Zoning Fees
Park Dedication Fees
Fire Department Permits and Fees
Animal License Fees
Building Permits and Fees
Water and Sewer Rates, Fees and Deposits
The appropriate Department Heads and I will be present to answer any
question that you may have.
RECOMMENDED ACTION: MOTION TO APPROVE A RESOLUTION ESTABLISHING THE
SCHEDULE OF RATES AND FEES FOR 1992.
COUNCIL ACTION:
CITY OF ROSEMOUNT
DAKOTA COUNTY, MINNESOTA
RESOLUTION 1991 -
A RESOLUTION ESTABLISHING THE SCHEDULE
OF RATES AND FEES FOR 1992
I. PLANNING AND ZONING REVIEW FEES
A. Administrative Appeals $ 75.00
B. Interim Use Permit $ 250.00
$1,000.00 escrow for staff and consultant fees.
C. Mineral Extraction Permit
1. Application $ 150.00
2. Annual Fee $ 250.00
3. A surety bond for $2,000.00 per acre must also be posted with the City.
D. Subdivision Fees
1. Preliminary Plat $ 200.00 flat fee
3.00 per lot
$750.00 escrow for staff and consultant fees.
2. Final Plat $ 150.00
3. Lot Split/Administrative Plat $ 150.00
4. Lot Combination $ 100.00
E. Comprehensive Guide Plan Amendment Application Fee $ 250.00
F. Rezoning $ 250.00
G. Zoning Ordinance Text Amendment $ 250.00
1
H. Planned Unit Development $ 250.00
$500 escrow for staff and consultant fees.
I. Planned Unit Development Amendments $ 75.00
J. Variance Petition Application Fee $ 100.00
K. Site Plan Review
U. Escrow Deposits
If not specified above, an escrow deposit may be required to fund planning, legal,
engineering and administrative costs. The amount of the deposit is to be based upon
the site, complexity and diversity of the project. In highly complex or large projects,
the City may require higher escrow deposits. The escrow deposit does not represent
the total fees which may be billed against the project and the applicant is required to
reimburse the City for all legal, engineering, planning and administrative expenses
incurred in excess of the deposit.
V. City Staff Billing
Services performed by City personnel will be billed at two (2) times the actual payroll
hourly rate. Services provided by City consultants will be billed at the current
consultant rates.
2
1. Site one acre or more
$ 150.00
2. Site less than one acre
$ 75.00
L.
Appeals of Planning Commission Decisions to the City Council $ 75.00
M.
Environmental Assessment Worksheets
$ 100.00
$1,000.00 escrow for staff and consultant fees.
N.
Zoning Ordinance and Map
$ 25.00
O.
Zoning Map
$ 5.00
P.
Subdivision Ordinance
$ 10.00
Q.
Zoning Ordinance, Map and Subdivision Ordinance
$ 35.00
R.
Planning Commission Agendas (mailing)
$ 15.00
S.
Planning Commission Minutes (mailing)
$ 40.00
T.
Planning Commission Agendas & Minutes (mailing)
$ 50.00
U. Escrow Deposits
If not specified above, an escrow deposit may be required to fund planning, legal,
engineering and administrative costs. The amount of the deposit is to be based upon
the site, complexity and diversity of the project. In highly complex or large projects,
the City may require higher escrow deposits. The escrow deposit does not represent
the total fees which may be billed against the project and the applicant is required to
reimburse the City for all legal, engineering, planning and administrative expenses
incurred in excess of the deposit.
V. City Staff Billing
Services performed by City personnel will be billed at two (2) times the actual payroll
hourly rate. Services provided by City consultants will be billed at the current
consultant rates.
2
If. PARK DEDICATION FEES
Park dedication fees are outlined in City Ordinance No. XVI1.86 which states:
In all new residential subdivisions, the City shall require that a sufficient portion of such land
be set aside and dedicated to the public for parks, playgrounds or other public use exclusive
of property dedicated for streets and other public ways. It shall be presumed that a sufficient
amount of land has been dedicated for parks and playgrounds for the present and future
residents of the subdivision, if the subdivider dedicates at least 1/25 of an acre per dwelling
unit that can be constructed in the subdivision. The City upon consideration of the particular
type of development proposed in the subdivision may require larger or lesser amounts of
land be dedicated if the City determines that the present and future residents of the
subdivision would require greater or lesser amounts of land for such purposes. The City shall
determine whether a cash in lieu of land dedication is more appropriate. The amount of cash
dedication shall be determined by multiplying the number of acres otherwise required to be
dedicated by the average value of comparable undeveloped land set by resolution by the City
Council.
In all new commercial and industrial subdivisions, it shall be presumed that a sufficient amount
of land has been dedicated to serve the needs of the resident and working population if the
subdivider dedicates at least five percent (5%) of the land in the subdivision for parks,
recreation and usable open space. The City upon consideration of the particular type of
development proposed in the subdivision may require larger or lesser amounts of land to be
dedicated if it determines that the present and future residents of the subdivision would
require greater or lesser amounts of land for such purposes. The Cityshall determine
whether a cash in lieu of land dedication is appropriate. The amount of cash dedication shall
be determined by multiplying the number of acres otherwise required to be dedicated by the
average value of comparable undeveloped land set by resolution of the City Council.
Land Values for the dedication of land and/or cash contribution:
New residential subdivision $12,000.00 per acre
Commercial subdivision $22,000.00 per acre
Industrial subdivision $22,000.00 per acre
III. FIRE DEPARTMENT PERMITS AND FEES
A. Recreation Fire Permit $ 5.00
B. Burning Permit $ 50.00
C. Pyrotechnic Display of Fireworks $ 50.00
3
D. Fire Department Response to False Alarms
1. First three (3) responses per year no charge
fourth and subsequent responses $100.00
E.
Fire Report
$
5.00
per copy
F.
Fire Photo
$
5.00
per copy
G.
Fire Video Tape
$100.00
H.
Officers Report
$
5.00
for first page
.50
each additional page
1.
Temporary use of Lp Gas
$
10.00
For tanks over 100 pounds
J.
Operation of Haunted House
$
25.00
K.
Day Care Inspection
1. Residential
$
15.00
2. Commercial
$
30.00
L.
Storage and Use of Hazardous Materials
$
20.00
Over quantities listed in current Fire Code Edition - Section
4.
IV. ANIMAL LICENSES
A. Registration Fees
1. Annual fee for spayed and neutered animals $ 5.00
2. Annual fee for unspayed and unneutered animals $ 10.00
B. Duplicate Tags $ 2.50
C. Fines
1. First Offense $ 15.00
2. Second Offense $ 25.00
3. Third and all successive offenses $ 50.00
4
D. Kennel Registrations
1. Residential
2. Commercial
E. Cattery Registration
$ 25.00
$ 100.00
$ 25.00
V. BUILDING PERMITS AND FEES
A. Building Permits
As recommended by Table 3-A of the 1988 Uniform Building Code.
B. Plan Check Fees
Sixty-five percent (65%) of the building permit fee.
C. State Surcharge
As recommended by the Minnesota State Code - Section .16B.70.
D. Metro SAC Fee
$700.00 per SAC unit as assigned by the Building Official in accordance with
Metropolitan Waste Control Commission.
E. Plumbing, Heating, Ventilating, Air Conditioning & Refrigeration Fees
1. Residential (4 or less units)
new construction $ 40.00 fee
.50 surcharge
$ 40.50 TOTAL
alteration/repair
5
$ 20.00 fee
.50 surcharge
$ 20.50 TOTAL
F.
2. Multiple Housing (5 or more units)
new construction
alteration/repair
$ 20.00 per unit fee
.50 per unit surcharge
$ 20.50 TOTAL PER UNIT
$ 20.00 per unit fee
.50 per unit surcharge
$ 20.50 TOTAL PER UNIT
3. Commercial/Industrial/Institutional
-one percent (1%) of valuation plus $.0005 surcharge
-$40.00 minimum fee plus $.0005 surcharge
Sewer and Water Installation Permit Fees
1. Municipal Service - residential (4 or less units)
new construction $ 30.00
.50
$ 30.50
alteration/repair $ 15.00
.50
$ 15.50
2. Municipal Service multiple housing (5 or more units)
-one percent (1%) of valuation plus $.0005 surcharge
-$40.00 minimum fee plus $.0005 surcharge
fee
surcharge
TOTAL PER UNIT
3. Municipal Service - commercial/industrial/institutional
-one percent (1%) of valuation plus $.0005 surcharge
-$40.00 minimum fee plus $.0005 surcharge
C.
fee
surcharge
TOTAL PER UNIT
4. Private Sewer - all classifications
New Construction
$ 50.00
fee
or Reconstruction
.50
surcharge
$ 50.50
TOTAL
-plus $39.00 County Recording Fee
G. Fences
$ 30.00
fee
50
surcharge
$ 30.50
TOTAL
H. Residing
1. Residential
$ 30.00
fee
.50
surcharge
$ 30.50
TOTAL
2. Commercial/Institutional/Industrial
As recommended by Table 3A of the 1988 Uniform Building Code.
-plus $.0005 surcharge
I. Reroofing
1. Residential
$ 30.00
fee
.50
surcharge
$ 30.50
TOTAL
2. Commercial/Institutional/Industrial
As recommended by Table 3A of the 1988 Uniform Building Code.
-plus $.0005 surcharge
J. Single Family Dwelling Basement Finish
1. Partial Finish
$ 30.00
fee
.50
surcharge
$ 30.50
TOTAL
7
2. Full Finish
$ 50.00 fee
.Q surcharge
$ 50.50 TOTAL
K. Wells
Effective February 1, 1989, all well permits will be issued and inspected by Dakota
County.
L. Signs - Permanent Installation
As recommended by Table 3A of the 1988 Uniform Building Code.
-plus $.0005 surcharge
*Minimum fee is $30.00 plus $.0005 surcharge
M. Mobile Homes
Building Permit $ 30.00
fee
.50
surcharge
Sewer Permit 15.00 °
fee
.50
surcharge
HVAC Permit 20.00
fee
.50
surcharge
$ 66.50
TOTAL
N. Swimming Pools
As recommended by Table 3A of the 1988 Uniform Building Code.
-plus $.0005 surcharge
O. Moving Permit $ 30.00 fee
.50 surcharge
$ 30.50 TOTAL
P. Demolition Permit $ 30.00 fee
.50 surcharge
$ 30.50 TOTAL
8
Q. Fire Sprinkler Protection System
As recommended by Table 3A of the 1988 Uniform Building Code.
-plus $.0005 surcharge
*Minimum fee of $40.00 plus $.0005 surcharge
R. Fireplaces
As recommended by Table 3A of the 1988 Uniform Building Code.
-plus $.0005 surcharge
*Minimum fee of $30.00 plus $.0005 surcharge
S. Satellite Dishes and Antennas
As recommended by Table 3A of the 1988 Uniform Building Code.
-plus $.0005 surcharge
*Minimum fee of $30.00 plus $.0005 surcharge
T. Grading Permits
As recommended per Table 70A for the plan review and Table 70B for the permit fee
of the 1988 Uniform Building Code.
-plus $.50 surcharge
U. Electrical Permits
1. Minimum fee for each separate inspection of an installation, replacement,
alteration or repair limited to one inspection only: $ 15.00
2. Services, changes or service, temporary services, additions, alterations or
repairs on either primary or secondary services shall be computed separately:
0 to 100 ampere capacity $ 15.00
101 to and including 200 ampere capacity $ 18.00
For each additional 100 ampere capacity or fraction thereof $ 8.00
3. Circuit, installation of, additions, alterations or repairs of each circuit or sub -
feeder shall be computed separately, including circuits fed from sub -feeders
and including the equipment served, except as provided for in Items 4 through
9.
D
0 to and including 30 ampere capacity $ 4.00
(maximum number of 1-30 ampere circuits to be paid on
is 30 to any one cabinet)
31 to and including 100 ampere capacity $ 6.00
For each additional 100 ampere capacity or fraction thereof $ 4.00
4. The maximum fee on an apartment building shall not exceed $ 35.00 per
dwelling unit for the first twenty (20) units and $ 30.00 per dwelling unit for the
balance of the units.
5. The maximum number of 0 to 30 ampere circuits to be paid on any athletic field
lighting standard is ten (10).
6. In addition to the above fees:
A charge of $ 2.00 will be made for each street lighting standard.
A charge of $ 3.00 will be made for each traffic signal standard. Circuits
originating within the standard will not be used when computing fees.
7. In addition to the above fees:
All transformers and generators for light, heat and power will be computed
separately at $ 5.00 per unit plus $ .25 per KVA up to and including 100 KVA.
101 KVA and over will be computed at $ .20 per KVA.
All transformers for signs and outline lighting shall be computed at $ 4.00 for
the first 500 VA or fraction thereof per unit plus $ .40 for each additional 100 VA
or fraction thereof.
8. In addition to the above fees (unless included in the fee filed by the initial
installer):
Remote control, signal circuits and circuits of less than 50 volts shall be
computed at $ 6.00 per each ten (10) openings or devices of each system plus
$ .50 for each additional opening.
9. For review of plans and specifications of proposed installations there shall be
a minimum fee of $100.00 up to and including $30,000.00 of electrical estimate,
plus 1/10 of one percent (1%) on any amount in excess of $30,000.00 to be
paid by persons or firms requesting the review.
10. When re -inspection is necessary to determine whether unsafe conditions have
been corrected and such conditions are not subject to an appeal pending before
any court, a re -inspection fee of $ 15.00 may be assessed in writing by the
inspector.
10
V
11. For inspections not covered herein, or for requested special inspections or
services, the fee of $ 22.00 per man hour, including travel time, plus $ .22 per
mile traveled, plus the reasonable cost of equipment or material consumed.
This section is also applicable to inspection of empty conduits and such jobs
as determined by the City.
12. For inspection of transient projects including, but not limited to, carnivals and
circuses the inspection fees shall be computed as follows:
Power supply units according to item 2 of the fee schedule. A like fee will be
required on power supply units at each engagement during the season, except
that a fee of $ 22.00 will be charged for additional time spent by the inspector
if the power supply is not ready for inspection at the time and date specified on
the Request for Inspection as required by law.
Rides, devices or concessions shall be inspected at their first appearance of the
season and the inspection fee shall be $ 15.00 per unit.
13. Fees for services, feeders and circuits operating at over 250 volts shall be
double those listed in items 2 and 3 above.
Special and Miscellaneous Inspections
As recommended by Table 3A of the 1888 Uniform Building Code.
W. Administration Handling Fee
Twenty-five (25%) percent of the permit fee. This fee will be charged for address and
lot changes and for permit and file editing. These changes must be done within thirty
(30) days of permit issuance or all prior permit fees will be forfeited (non-refundable).
X. Documentation Fees
1. Building Department Reports $100.00 per year
$ 10.00 per month
2. Building Department Miscellaneous Documents $ 2.00
3. Blue Line Copies $ 5.00 per copy
Y. Public Works Fee: Street Excavation and Curb Cuts
1. Curb Cuts $ 25.00 TOTAL
2. Street Excavation
11
$500.00 Minimum Bond Deposit with
the City
Restoration costs will be determined by the City Public Works Director and costs
will be charged accordingly.
Z. License Requirements
1. Plumbing
Master plumbers license number, certificate of liability and workers
compensation insurance and State Department of Health Bond. (no fee
required)
2. City Contractor $ 25.00
Certificate of liability insurance with the City of Rosemount listed as a Certificate
Holder and proof of workers compensation insurance.
3. State Contractors License Confirmation Fee $ 5.00
4. Septic System Installers License
Dakota County ISTS license, a certificate of liability insurance with the City of
Rosemount listed as a Certificate Holder and proof of workers compensation
insurance (no fee required).
5. Solid Waste Hauling License $ 50.00
Completed City application, fee schedule based upon volume and a certificate
of insurance and proof of workers compensation and public liability insurance.
VI. WATER AND SEWER RATES, CHARGES AND DEPOSITS
A. Use Charges
1. Water Consumption Charges
The amount due and payable by each water user within the City for water taken
from the water system shall be as provided below, payable quarterly and
deposited in the Utility Operating Fund:
RATE SCHEDULE
Meter Size: all sizes
Quarterly Rate: $1.10/1,000 (t) Gallons
12
MINIMUM QUARTERLY CHARGES
Meter Size: all sizes
Minimum Charge: $18.00 plus meter maintenance
(based on 0-18,000 gallons)
a) In case the meter is found to have stopped, or to be operating in a faulty
manner, the amount of water used will be estimated in accordance with the
amount used previously in the year.
b) Any pre -payment or overpayment of charges may be retained by the City and
applied on subsequent quarterly statements.
c) Each quarterly billing for water service not paid when due shall incur a penalty
charge of 10% of the amount past due.
d) For turning on water, where service has been turned off, a service charge
of $15.00 will be made.
e) Water billing shall start at the time of installation of the water meter.
2. Water Meter Replacement Charge
A quarterly meter maintenance/replacement charge shall be made for each
meter as set forth below and deposited into the Utility Operating Fund:
Meter Size Quarterly Meter Maintenance Charge
5/8
$ 3.00 /Quarter
1
$ 5.00 /Quarter
/2
$ 9.00 /Quarter
2-1
$14.50 /Quarter
3
$21,00 /Quarter
4
$36.00 /Quarter
6
$80.00 /Quarter
8
$N/A
10
$N/A
3. Sewer Usage Charge
A charge is hereby imposed upon every person whose premises are served,
either directly or indirectly, by the sanitary sewer system within the City, for the
use of the facilities of said sewer system.
13
41
4.
The charge for residential use will be based on the actual amount of water used
for the first, second, and fourth quarters. The third quarter sewer charge will
be based on the first quarter water use. Commercial, institutional and industrial
charges shall be based upon the actual amount of water used during each
quarter. The charges shall be as stated below and deposited into the Utilities
Operating Fund.
All Users Quarterly Charge: $1.85 /1,000 (Iq gallons
Minimum Charge: $27.75 (based on 0-15,000 gallons)
Charges for sanitary sewer users without municipal water or metered non -
municipal water shall be $37.00 per quarter per unit.
WATER SURCHARGE
A surcharge will be made for debt service of the core water facilities, effective
July 1, 1989, at the following quarterly rates:
Meter Size
Single Family
Multi -Family
1 " (a)
2" (a)
3" (a)
4" (a)
6" (a)
(a) Commercial,
Rate Per Quarter
$,4.50
$ 3.50
$ 6.75
$15.75
$23.50
$35.00
$77.50
Industrial, or Institutional
The surcharge revenue shall be deposited in the Water Surcharge Fund.
CAPITAL CHARGES
Capital charges for connection to the water, sanitary sewer, and storm sewer systems
are adjusted annually on January 1, based upon the Engineering News Record
Construction Index.
1. City Water Connection Charges
A connection charge shall be imposed for each new connection to the municipal
water system. The charge shall be utilized to pay for the cost of core facilities
(water supply, storage and distribution main oversizing and etc.). The charge
shall be as stated below, and deposited into the Water Hook -Up Fund:
14
F,
a.
1
C.
Cj
Single family detached homes, mobile homes, and single family attached
homes with individual laundry facilities:
$980.00 per unit
Apartments, condominiums and single family attached homes with central
laundry facilities:
$790.00 per unit
Industrial, Commercial and Institutional:
Water Service Size
Connection Charge
$1,640.00
$3,280-00
$4,920.00
The connection charge for water services over two inches (2") shall be
determined by the City Council.
e. A connection charge shall be made for each individual water service line,
based upon the minimum line size required according to the fixture unit
calculations in the State's plumbing code.
City Sewer Connection Charge
A sanitary sewer connection charge shall be imposed for each unit connecting
to the sanitary sewer system, or for any unit for which a building permit is issued
and which is located within the City's 1990 sanitary sewer service district, as
determined by the City's last comprehensive plan as approved by the
Metropolitan Council. The charge shall be utilized to pay for the cost of core
facilities (trunk sewers, lift stations, forcemains and unusual circumstances).
Any unit involving a single family structure which is located on property greater
than 13,500 square feet, shall be charged one basic connection charge unit for
each 13,500 square feet of property area or fraction thereof, but in no event
shall a charge result in more than 2.5 basic units for each acre of property.
Ponding easements, scenic easements or other extraordinary easements will
not be included in the square footage of the property area. These connection
charges shall be deposited into the Sewer Hook -Up Fund.
a. Single family detached homes, mobile homes and single family attached
homes with individual laundry facilities:
$980.00 per unit
15
b. Apartments, condominiums and single family attached homes with central
laundry facilities:
$790.00 per unit
C. Industrial, Commercial and Institutional:
The connection charge shall be based upon the number of equivalent
single family detached dwelling connections taken from the latest edition
of the Metropolitan Waste Control Commission Reserve Capacity Manual.
The equivalents for uses not listed shall be determined by the City
Council
3. Metropolitan Waste Control Commission Service Availability Charge
The City shall collect, in addition to City connection charges, the Metropolitan
Waste Control Commission (MWCC) Service Availability Charge (SAC), as set
forth by the MWCC.
4. City Storm Sewer Connection Charge
A storm sewer connection charge shall be imposed for funding of landlocked
pond acquisition and storage volume development, in addition to construction
of discharge storm sewer piping that enters other jurisdictions. The charge shall
be imposed for each unit where a building permit is issued for new construction
provided the unit meets either of the following criteria:
a) The subdivision, in which the unit to be built is located in, was platted
since January 1, 1985, or
b) The subdivision, in which the unit to be built is located in, was less than
90 percent developed by March 1, 1988.
The following is a list of subdivisions, as of December 31, 1989, that meet either
of the above criteria:
(a) Rosemount Plaza 2nd Addn Shannon Park 1st Addn
Westridge 1 st - 3rd Addn O'Leary's Hills 2nd - 4th
Evenson 1st Addn Country Hills 1st - 3rd
Wensmann 1st -4th Addn Carrollton 2nd & 3rd Addn
Limerick Way Shannon Oaks
Chelsea Woods Estates
(b) Valley Oak Replat Addn
South Rose Park 2nd Addn
16
South Rose Park Addn Replat
Broback Industrial Park
The charge shall be as stated below, and deposited into the Storm Sewer
Connection Fund:
a. For single family detached homes, single family attached, and mobile
homes, a unit will be considered as each dwelling unit. The density of
these units shall be considered to average 2.5 units per acre. The
connection charge shall be:
$ 980.00 per unit
$2,940 per acre
The minimum single family connection charge shall be for one lot or
dwelling unit, whichever is greater.
b. For multi -family developments such as apartments, condominiums, and
townhouses the connection charge shall be one and two-thirds (1.67)
times the rate stated above in paragraph D.1. for each acre of multi-
family developments. The connection charge shall be:
$4,910.00 per acre
The minimum multi -family connection charge shall be for one (1) acre
C. For institutional and public developments the connection charge shall be
one and two-thirds (1.67) times the single family area rate stated above
in paragraph D.1. for each acre of institutional and public development.
The connection charge shall be:
$4,910.00 per acre
The minimum institutional and public connection charge shall be for one
(1) acre.
d. For commercial developments the connection charge shall be two and
one-sixth (2.17) times the rate stated above in paragraph D.I. for each
acre of commercial development. The connection charge shall be:
$6,380.00 per acre
The minimum commercial connection charge shall be for one (1) acre.
e. For industrial developments the connection charge shall be two and
one-third (2.33) times the rate stated above in paragraph D.1 for each
acre of industrial development. The connection charge shall be:
$6,850.00 per acre
The minimum industrial connection charge shall be for one (1) acre.
17
C. MISCELLANEOUS CHARGES, DEPOSITS AND PERMITS
1.
2.
3
Water Meter Accuracy Check
A Consumer may, by written request, have his meter accuracy checked by
depositing the amount stated below with the Utility Department. In case a test
should show an error of over five percent (5%) of the water consumed, the
deposit will be refunded to the consumer, a correctly registered meter will be
installed, and the bill will be adjusted accordingly if the error was in favor of the
City. Such adjustment shall not extend back more than one billing period from
the date of the written request. The charges for meter testing are as follows,
and shall be deposited into the Utility Operating Fund:
For testing 5/8" - 2" meters $ 30.00
For testing 3" meters $ 36.00
For testing 4" meters $ 70.00
For testing 6" meters $100.00
Sewer and Water Permit
A permit must be obtained to connect to the City water and sewer system or
to construct a private sewer or water system in accordance with Section 1.12
of the City Sewer and Water Ordinance. A fee shall be charged as established
by the City Council, which covers the cost incurred by the City to process and
inspect the system installation, and shall be deposited into the General City
Deposits.
Property Assessments
If a lot or tract of land receives abutting lateral sanitary sewer or water benefit,
a building permit or connection permit shall not be issued until one of the
following conditions has been complied with:
a. A lateral sanitary sewer and water assessment has been paid, levied,
or will be levied in due course, or
b. The applicant shall pay an additional connection fee for lateral sanitary
sewer and watermain service per lineal foot of assessable abutting
property based on the rates in effect at the time of building or connection
permit application. The 1991 rates per lineal foot are as follows:
Sanitary Sewer $30.00/I.f.
Watermain $25.00/I.f.
These rates shall be adjusted annually on January 1, based on the
"Engineering News Record" index.
These charges shall be deposited into the Sewer Hook-up Fund and
Water Hook-up Fund.
18
BE IT FURTHER RESOLVED, that the "City of Rosemount Schedule of Rates and Fees" is
hereby adopted this 17th day of December, 1991, effective with the first billing period of 1992.
ADOPTED this 17th day of December, 1991.
Vernon Napper Mayor
ATTEST:
Susan M. Walsh, Clerk
Motion by: Seconded by:
Voted in favor:
Voted against:
19