HomeMy WebLinkAbout8.c. Comprehensive Sewer Plan - Engineering Service ProposalCITY OF ROSEMOUNT
EXECUTIVE SUMMARY FOR ACTION
CITY COUNCIL MEETING DATE: March 19, 199.E
AGENDA ITEM: Comprehensive Sewer
AGENDA SECTION:
Plan -Engineering Services Proposal
New Business
PREPARED BY: Dean Johnson
AGENDA Nj '". .
Community Development Director
ATTACHMENTS: Proposal
AP BY•
Attached is a proposal from SEH to complete the sanitary sewer plan,
as part of the update of the Comprehensive Guide Plan. These services
would affect the traditional urban service area of the City only. A
subsequent contract for services in eastern Rosemount will need to be
pursued, if so desired by the City Council.
RECOMMENDED ACTION: Motion to accept the proposal from SEH, Inc.
to complete a comprehensive sewer plan element in the Comprehensive
Guide Plan, in an amount not to exceed $2500.
COUNCIL ACTION:
Approved.
AW
i�
WASEN
ENGINEERS *ARCHITECTS & PLANNERS 3535 VADNAIS CENTER DRIVE, ST. PAUL, MINNESOTA 55110 612 490.2000
February 7, 1991 RE: ROSEMOUNT, MINNESOTA
COMPREHENSIVE SEWER PLAN UPDATE
Mr. Dean R. Johnson,
Director of Community Development
City of Rosemount
2875 145th Street West
Rosemount, MN 55068
Dear Dean:
In response to your request, we have prepared a cost estimate for
updating the City's Comprehensive Sewer Plan (C.S.P.). The
C.S.P. Update will consist of a letter report addressing the
following three items:
Item 1: Include the east half of Section 32 in the Urban
Service Area.
The C.S.P. currently shows the Urban Service Area
boundary along the north -south quarter line of Section
32. Since the C.S.P. was last updated, non-residential
development has occurred along 160th Street, east of
this boundary. The C.S.P. Update will address how this
area shoo d he cAr<+!>.? by can; + ��;•yr.
Item 2: Review the validity of the current C.S.P. for
Subdistricts 14 through 21.
This area has experienced significant development since
the last C.S.P. Update, particularly in the Orin
Thompson development. In addition to district boundary
changes, major forcemain and gravity main construction
has occurred along Shannon Parkway. There is a need to
either reaffirm the validity of the current C.S.P. for
this area, or revise the C.S.P. based on the changes
which have occurred.
SHORT ELLIOT-, ST. PAUL, CHIPPEWA FALLS,
H,ENDRICKSON INC MINNESOTA WISCONSIN
Mr. Dean R. Johnson
February 7, 1991
Page #2
Item 3: Review how the proposed armory should be served by
sanitary sewer.
-
The proposed armory is to be located on 13 acres of
land off S.T.H. 3, north of Rosemount High School. The
current C.S.P. indicates that development of the armory
site should be served by the future "Brockway Inter-
ceptor". However, it may be possible to temporarily
serve the armory via the Brockway lift station to the
c.st, or ti:e- schoul'S pumping station to the south.
The C.S.P: Update will review the alternatives and
recommend the best option for both immediate and
ultimate service to the proposed armory.
A partial list of the information we will need from the City
includes:
1. A topographic map of the east half of Section 32.
2. Updated sanitary sewer utility location maps for the
entire City.
3. Record plans of those facilities not shown on the
sanitary sewer utility location maps.
4. Record plans for the Brockway lift station.
5. A copy of the drawings and text from the current C.S.P.
6. Detailed information on the location, size, occupancy,
and facilities to be included in the proposed armory.
Assuming that all of.. the abnxre informatinn 4- avai ih a 1. c. the
estimated costs (best case scenario) to complete the C.S.P.
Update are as follows:
Item 1
Item 2
Item 3
Total
$ 840
640
1,050
$2,530
We recognize that the City's budget for this project is very
limited. Accordingly, we propose to provide the above referenced
services on an lump sum basis, at a cost of $2,500. The Update
could be completed within two weeks after receipt of the
necessary information from the City.
• � s
Mr. Dean R. Johnson
February 7, 1991
Page #3
We would be happy to discuss this proposal with youfurtherat
your convenience. Please call if you have any questions.
If this is acceptable to you, please sign and return one copy of
this proposal.
Respectfully Submitted,
SHORT-ELLIOTT-HENDRICKSON, INC.
Da'Vid F. Siinons,-P.E.
Project Manager
iLanie R. Boxru , P.E.
Department Manager
DFS/cih
cc: Steve Jilk, City Administrator
AUTHORIZED BY:
Name
(Title)
Date