Loading...
HomeMy WebLinkAbout4.i. Approve Expenditure for Painting Emergency Fire VehicleCITY 'OF ROSEMOUNT EXECUTIVE SUMMARY FOR ACTION CITY COUNCIL MEETING DATE: May 7, 1991' AGENDA ITEM: AGENDA SECTION: Expenditure for Painting Emergency Fire Veh. Consent_ PREPARED BY: Scott Aker, Fire Chief AGENDA ATTACHMENTS: Bids APPRO BY* ✓ This item is a request to spend $475.20 to paint the usual and customary lime yellow stripe on the side of two new fire department vehicles. The bids on these two vehicles have been accepted by the council and delivery should be within 150 days. Bids from Quality Truck Painting and Phil's Body, which are very close in price, are attached. Phil's Body Shop has the low bid of $237.60 per vehicle. So the total cost to paint the two vehicles would be $475.20. This expenditure was anticipatedwhen the 2 vehicles were put into the 5 - year CIP. For that reason monies would come approximately equally out of Account #20249002-01-551 and Account #202-49002-01-552. RECOMMENDED ACTION: Motion by the city council to allow the fire department to spend $475.20 to paint 2 new pickup trucks with the emergency response colors,, with the monies coming equally out of Account #202-49002-01-551 and #202-49002-01-552. COUNCIL ACTION: QUALITY TRUCK PAINTING 10500 East Courthouse Blvd. Inver Grove Heights, MN 55075 612-457-7129 EXPERT BODY AND PAINT WORK WITH PPG FINISHES ,ME --,r 1 .��N'ti0 Cts ADDR S PHONE HOME BUUSIN SS �r tel) •�•�7 DATE Z � ��' �. YEAR MAKE MODEL BODY STYLE TRIM CODE LICENSE MILEAGE )LOR(S) SDE SOLID METALLIC CLEARCOAT MECH. LABOR SVC WTR SOURCE ACCT # M/F INS. TYPE CAR YEAR ZIP CODE DEDUCTIBLE PAINT LABOR FIXTURES FRAME LABOR USED PARTS CLAIM NO. N NO. GLASS epair Replace Description Mach, Body Paint Frame Parts Sublet SALES TAX TOTAL — _DATE \ 0 4AA 1, 'OTA L This report is based upon our detailed inspection of your vehicle �d does not include repairs other than itemized above. Occa- Dnafly additional damage will be discovered once the work is :ened up. and additional repairs will be required Repairs will be made for you as owner. If you do not intend to pay th your own funds. please make certain the insurance company in deliver their check to you in time to pick up your vehicle. repairs must be paid in full before the vehicle will be released If a lienhoider is named on the insurance check, their endorse ant must be obtained. Ne are proud of our technicians and their superior quality work- znship. Thank you for letting us serve you. image Report Prepared By PARTS SUBJECT TO INVOICE TOWING MECH. LABOR ADVANCE BODY LABOR RUSTPROOF PAINT LABOR FIXTURES FRAME LABOR USED PARTS PARTS GLASS PAINT MATERIAL RECHROME SUBLET AUTHORIZATION FOR REPAIRS DU ARE HEREBY AUTHORIZED TO MAKE THE ABOVE 'ECIFIED REPAIRS. GNED SUBLET TOTAL SALES TAX TOTAL — _DATE Estimate Report _, BUS PHONE G RES _ —_ _DATE _..__ 9NONE - _�--__-----CITY STATE --__ZIP__---.—. FADDRESS ._MAKE_._ -MODEL I.D. NO. —._.__—PROD DATE _ -TRIM. MILEAGE_ —LICENSE NO._ ,_ INS CO FILE NO --_____CLAIM NO --_—__-___PO N0 _ LIC NO PHONE . _ _ _ ._ _. Deduchble/8e11emrent _ 1 DESCRIPTIONDAMAGE PARTS LABOR I PAINT ALL OTHER 2 3 /�/ •r0E'--c- l7 4 6 7 8 9 10 11 12 13 14 15 16 17 18 19 — -- — 20 i - 21 23 24 25 — --- — -- — 26 27 29 30 TOTALS I hereby authorize the above work and acknowledge receipt of copysigned X PARTS Prices subtect to invoice $_ _ PHIL'S BODY SHOP INC. LABOR hrs.@ S Shop Supplies $ S PAINT hrs.®S S 2025 W. 135th St. Paint Supplies $ Rosemount, MN 55068 Tbwing/Storage $ 423-2433 SuSUB TOTAL nexus Wet /(612) $ TAX $ TOTAL ESTIMATE S _t 3 %. C�.�l