HomeMy WebLinkAbout4.k. Approve Final Payment for Shannon Hills 2nd Addition, City Project #216�J- CITY OF ROSEMOUNT EXECUTIVE SUMMARY FOR ACTION CITY COUNCIL MEETING DATE: August 20, 1991 AGENDA ITEM: Approve Final Pay Estimate, AGENDA SECTION: Shannon Hills 2nd Addition, Project #216 Consent PREPARED BY: Ron Wasmund AGENDA TEM # 4 K PTEM Public Works Director/Building Official ATTACHMENTS: Pay Estimate APP , Y: J / This item consists of authorization for the final payment for Shannon Hills 2nd Addition Street & Utilities Improvements, City Project #216 in the amount of $42,233.54 to Ceca Utilities, Inc. We have received the Minnesota Department of Revenue IC -134 from the Contractor and Sub -Contractors. We have also received the Consent of Surety and Lien Waivers. All work has been completed, inspected and found to be in compliance with the contract documents. A one year warranty period will begin upon contractors receipt of final payment. It is Staffs recommendation to make final payment at this time. RECOMMENDED ACTION: MOTION TO APPROVE THE 3RD AND FINAL PAYMENT FOR SHANNON HILLS 2ND ADDITION STREET AND UTILITIES IMPROVEMENTS, PROJECT # 216 IN THE AMOUNT OF $42,233.54 TO CECA UTILITIES, INC. COUNCIL ACTION: 3 Estimate Voucher No. 3 CONSTRUCTION PAYMENT VOUCHER ------ ------------------ Date JULY 31, 1991 For Period Ending JULY 10, 1991 ------------------------------------------ ------------------ Project No. CITY PROJECT NO. 216 CITY CONTRACT NO. 1990 - 5 --------------------------------------------------------------------------------------------- Class of Work UTILITIES AND STREET IMPROVEMENTS Location SHANNON HILLS SECOND ADDITION Burnsville, Minnesota 55337 -------------------------------------------------------- Ph (612) 890-6169 For CITY OF ROSEMOUNT, MINNESOTA ------------------------ Fax (612) 890-5701 A. -------------------------------- Original Contract Amount # 280,466.20 B. ----------------------- Total Additions S ------------------------ 1,820.00 C. Total Deductions # 0.00 D. ------------------------ Total Funds Encumbered # 282,2B6.20 E. Total Value of Work Certified to Date ------------------------ # 266,605.B2 F. Less Retained Percentage 7 ---------------- X # 0.00 6. ------------- Less Total Previous Payments ------------------------ # 224,372.28 H. Total Payments Including This Voucher ------------------------ # 266,605.82 I. Balance Carried Forward ------------------------ # 15,680.38 J. APPROVED FOR PAYMENT, ------------------------ T H 1 S VOUCHER $ 42,233.54 APPROVALS ------------------------ ORR-SCHELEN-MAYERON -------------------------------------------------------------------------= k ASSOCIATES, INC. Pursuant to our field observation, as performed in accordance with our contract, and based on our professional opinion, materials are satisfactory and the work properly performed in accordance with the plans and specifications and that the total work is 100 % completed as of JULY 10, 1991 . We hereby re ommend payment of this voucher. Signed -------- ----------------------------- Signed ------------------------------------------------------------------------------------------------------------------------ Construction Observer This is to certify that to the best of my knowledge, information, and belief, the quantities and values of work certified herein is a fair approximate estimate for the period covered by th' voucher. Contractor Ceca Utilities, Inc.------------ _� /% Signed By---- � - -- - � -- Date : --------------�- h- Title City of ----------------------------------- ------------------------------------------------------------ Rosemount Approved for payment Voucher ------------------------------------ --------------------------------------------- Checked By : Authorized Representative Date : --------------------------------------------- Page 1 of ------------------------------------ 4 - 4653 TE VOUCHER NO. 3 6 FINAL ---------------- JULY 31, 1991 -IES AND STREET IMPROVEMENTS JN HILLS SECOND ADDITION ROJECT NO. 216 CITY CONTRACT NO. 1990 - 5 yM JF ROSEMOUNT, MINNESOTA :ct Date September 27, 1990 :ompleted July 10, 1991 SPEC, NO. ITEM ----------------- LE 'A' - STREETS 564.602 F it I STREET SIGNS (COMP. ASSEMBLY) 564.602 F t I BARRICADES DIV. II CLEAR AND GRUB 2112.501 SUB6RADE PREPARATION 2211.501 A66REGATE BASE - CLASS 5 2331.504 BITUMINOUS MATERIAL FOR MIXTURE 2331.514 2331 BITUMINOUS BASE COURSE 2341.504 BITUMINOUS MATERIAL FOR MIXTURE 2341.508 2341 BITUMINOUS WEAR COURSE 2357.502 BITUMINOUS MATERIAL FOR TACK COAT 2531.501 CONCRETE CURB t GUTTER D 416 2573.502 EROSION CONTROL 2575.501 SEEDING 2575.505 SODDING, TYPE 'A', LAWN t BOULEVARD 2575.523 FIBER BLANKETS, TYPE HI6H VELOCITY TOTAL SCHEDULE 'A' - STREETS SLE 'B' - BITUMINOUS TRAIL CONTRACTOR : Ceca Utilities, Inc. 201 W. Travelers Trail Burnsville, Minnesota 55337 Ph (612) 890-6169 Fax (612) 890-5701 Work Started : October 3, 1990 Completion Date June 30, 1991 WORK COMPLETED CONTRACT THIS AMOUNT TOTAL TO DATE QUANTITY UNIT UNIT PRICE TOTAL PRICE MONTH THIS MONTH QUANTITY TOTAL PRICE 2 EA. 2 EA. 10 TREE 21.4 R.S. 3050 TON 31.8 TON 635 TON 39.4 TON 635 TON 350 GAL. 4300 L.F. 500 L.F. 0.8 ACRE 7500 S.Y. 1000 S.Y. DIV. II 6' WIDE BITUMINOUS TRAIL 1055 OT -t CHANGE ORDER NO. 1 ATTACHED TOTAL SCHEDULE 'B' - BITUMINOUS TRAIL TLE 'C' - STORM DRAIN 2503.541 12' R.C.P. C.B. LEADS CL IV 2503.541 15' R.C.P. C. B. LEADS CL IV 2503.541 18' R.C.P. CL III 2503.541 36' R.C.P. CL III 2503.541 36' R.C.P. CL IV 2503.513 36' RCP F.E.S. W/ TR. GUARD 2506.508 EXCESS 4' DIA. MH DEPTH > 8' 2506.508 STANDARD 4' DIA. STM. MH (0 - 8') 2506.508 EXCESS 5' DIA. MH DEPTH > 8' 2506.508 STANDARD 5' DIA. STM. MH (0 - 8') 2506.508 5' DIA. CATCH BASIN MAN HOLE (0 - 8') 2506,508 EXCESS 6' DIA. MH DEPTH > 8' 2506.508 6' DIA. CATCH BASIN MANHOLE (0 - 8') Page 1 of 4 - 4653 225.00 200.00 50,00 100.00 5.00 155.00 10.70 155.00 11.70 1.40 4.25 1.50 700.00 2.00 1.50 450.00 400.00 500.00 2,140.00 15,250.00 4,929.00 6,794.50 6,107.00 7,429.50 490.00 18,275.00 750.00 560.00 15,000.00 1,500.00 80,575.00 8.25 6,703.75 ------------ _5 6,703.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 32.6 5,053.00 543 6,353.10 340 476.00 0.00 0.00 0.00 3380 6,760.00 0.00 $ 18,642.10 1,055 6,703.75 ------------ 8,703.75 0.00 2 400.00 6 300.00 21.4 2,140.00 21729 13,645.00 32i3 5,006.50 645 6,901.50 32.6 5,053.00 543 6,353.10 415 581.00 4,202 17,858.50 360 540.00 0.00 3,380 6,760.00 0.00 $ 65,53B.60 1,055 8,703.75 ------------ f 8,703.75 180 L.F. 14.60 2,628.00 0.00 186 2,715.60 75 L.F. 15.55 1,166.25 0.00 7E 1,181.80 405 L.F. 16.95 6,864.75 0.00 405 6,864.75 937 L.F. 35.35 33,122.95 0.00 929 32,840.15 395 L.F. 41.40 161353.00 0.00 395 16,353.00 1 EA. 1116.00 1,116.00 0.00 1 1,116.00 2.0 L.F. 46.00 96.00 0.00 0.4 19.20 3 EA. 740.00 2,220.00 0.00 3 2,220.00 15.1 L.F. 82.00 1,238.20 0.00 9 738.00 4 EA. 1156.00 4,624.00 0.00 4 41624.00 2 EA. 1236.00 2,472.00 0.00 2 2,472.00 2.1 L.., 114.00 239.40 0.00 2.4 273.60 2 EA. 1774.00 3,546.00 0.00 2 3,546.00 -iMATE VOUCHER NO. 3 & FINAL ---------------- -E JULY 31, 1991 iLITIES AND STREET IMPROVEMENTS ANNON HILLS SECOND ADDITION TY PROJECT NO. 216 CITY CONTRACT NO. 1990 - 5 THE TY OF ROSEMOUNT, MINNESOTA TOTAL SCHEDULE 'C' - STORM DRAIN 4EDULE 'D' - WATER MAIN 35 2611.500 B' DIP CL 52 WATERMAIN '6 2611.500 6' DIP CL 52 WATERMAIN 37 2611.500 8' GATE VALVE & BOX 38 2611.500 6' GATE VALVE & BOX '9 2611.500 HYDRANTS 40 2611.500 HYDRANT EXTENSIONS 11 2611.500 FITTINGS =2 2611.500 1' CORPORATION COCKS 2611.500 1' CURB STOP & BOX =4 2611.500 1' COPPER SERVICE PIPE 45 2611.500 CONNECT TO EXISTING WATER MAIN TOTAL SCHEDULE 'D' - WATER MAIN MIEDULE 'E' - SANITARY SEWER 46 2621.500 8' PVC PIPE SAN SWR SDR 35 2621.500 8' PVC PIPE SAN SWR SDR 26 :.i 2621.500 S' x 4' PVC SEWER WYES 47 2621.500 4' PUC SERVICE PIPE (INCL RISERS) 50 2621.500 STD SAN. SWR MANHOLE 4' DIA. (0 - 8') i 2621.500 EXCESS MANHOLE DEPTH OVER 8' 52 2621.500 CLEAN - OUT 53 2611.500 GRANULAR FOUNDATION 8 B1,569.05 $ 0.00 $ 80,846.10 980 L.F. 14.05 13,769.00 0.00 988 WORE: COMPLETED 1270 L.F. =M SPEC. 14,922.50 0.00 1,194 CONTRACT THIS AMOUNT TOTAL TO DATE 1. NO. -------------------------------------------------------------------------------------------------------------------------------- ITEM QUANTITY UNIT UNIT PRICE TOTAL PRICE MONTH THIS MONTH QUANTITY TOTAL PRICE 30 2506.509 CATCH BASIN TYPE A 7 EA. 485.00 3,395.00 0.00 7 3,395.00 '1 2506.509 CATCH BASIN TYPE B 3 EA. 520.00 1,560.00 0.00 3 1,560.00 '2 2511.507 CL IV GROUTED RIP RAP 20 C.Y. 35.00 700.00 0.00 20 700.00 33 2511.513 GRANULAR FILTER 15 TON 15.00 225.00 0.00 15 225.00 34 2611.500 GRANULAR FOUNDATION 50 TON 0.01 0.50 0.00 10,301.50 0.00 TOTAL SCHEDULE 'C' - STORM DRAIN 4EDULE 'D' - WATER MAIN 35 2611.500 B' DIP CL 52 WATERMAIN '6 2611.500 6' DIP CL 52 WATERMAIN 37 2611.500 8' GATE VALVE & BOX 38 2611.500 6' GATE VALVE & BOX '9 2611.500 HYDRANTS 40 2611.500 HYDRANT EXTENSIONS 11 2611.500 FITTINGS =2 2611.500 1' CORPORATION COCKS 2611.500 1' CURB STOP & BOX =4 2611.500 1' COPPER SERVICE PIPE 45 2611.500 CONNECT TO EXISTING WATER MAIN TOTAL SCHEDULE 'D' - WATER MAIN MIEDULE 'E' - SANITARY SEWER 46 2621.500 8' PVC PIPE SAN SWR SDR 35 2621.500 8' PVC PIPE SAN SWR SDR 26 :.i 2621.500 S' x 4' PVC SEWER WYES 47 2621.500 4' PUC SERVICE PIPE (INCL RISERS) 50 2621.500 STD SAN. SWR MANHOLE 4' DIA. (0 - 8') i 2621.500 EXCESS MANHOLE DEPTH OVER 8' 52 2621.500 CLEAN - OUT 53 2611.500 GRANULAR FOUNDATION 8 B1,569.05 $ 0.00 $ 80,846.10 980 L.F. 14.05 13,769.00 0.00 988 13,881.40 1270 L.F. 11.75 14,922.50 0.00 1,194 14,029.50 2 EA. 421.00 842.00 0.00 2 842.00 2 EA. 309.00 618.00 0.00 2 618.00 5 EA. 1002.00 5,010.00 0.00 5 5,010.00 10 L.F. 205.00 2,050.00 0.00 2 410.00 2000 LB. 0.75 1,500.00 0.00 1,925 1,443.75 40 EA. 25.20 1,008.00 0.00 40 1,OOB.00 40 EA. 60.80 2,432.00 0.00 40 2,432.00 1800 L.F. 5.50 9,900.00 0.00 1,873 10,301.50 1 EACH 200.00 200.00 ------------ 0.00 1 ------------ 200.00 ------------ 9 52,251.50 4 0100 $ 50,176.15 TOTAL SCHEDULE °E' - SANITARY SEWER Page 3 of 4 - 4653 1663 L.F. 10.75 18,092.25 0.00 11,676 18,017.00 410 L.F. 15.80 6,476.00 0.00 409 6,462.20 40 EA. 24.50 980.00 0.00 40 980.00 1800 L.F. 4.85 8,730.00 0.00 1,888 9,156.80 11 EA. 940.90 10,349.90 0.00 11 10,349.90 40.0 L.F. 48.00 1,920.00 0.00 46.9 2,251.20 1 EACH 185.00 185.00 0.00 1 185.00 50 TON 0.01 0.50 0.00 0.00 4 46,735.65 $ 0.00 $ 47,402.10 VOUCHER NO. 3 t FINAL ---------------- JULY 31, 1991 _IES AND STREET IMPROVEMENTS ]N HILLS SECOND ADDITION 'ROJECT NO. 216 CITY CONTRACT NO. 1990 - 5 ;E IF ROSEMOUNT, MINNESOTA SPEC. NO. ITEM WORK COMPLETED CONTRACT THIS AMOUNT TOTAL TO DATE QUANTITY UNIT UNIT PRICE TOTAL PRICE MONTH THIS MONTH QUANTITY TOTAL PRICE SUB -TOTAL - SUM OF SCHEDULES °A` THRU °E° i 269,634.95 i 27,345.85 DIV. II MOBILIZATION (2X MAX OF SUB -TOTAL) 1 L.S. 3000.00 3,000.00 0.00 DIV. II CLEAN-UP (2% MINIMUM OF SUB -TOTAL) 1 L.S. 5000.00 5,000.00 0.95 4,750.00 GRAND TOTAL BASE BID 277,834.95 32,095.85 TERNATE NO. i -------------- DDITIONAL COST FOR CLASS 5 AGGREGATE BASE 100 % CRUSHED ROCK IN LIEU OF STANDARD CLASS 5 AGGREGATE BASE. 3050 TONS 1.50 4,575.00 ------------ TOTAL ALTERNATE NO. 1 $ 4,575.00 BRAND TOTAL BASE BID PLUS ALTERNATE NO. 1 2B2,409.95 Supplemental Agreement No. i Supplemental Agreement No. 2 TOTAL TO DATE age 4 of 4 - 4653 5 282,409.95 0.00 ------------ 6 0.00 1 32,095.85 576.62 4 32,674.47 S 252,666.70 1 3,000.00 1 5,000.00 S 260,666.70 2,729 4,093.50 ------------ $ 4,093.50 $ 264,760.20 1,267.00 578.62 $ 266,605.62- age 66,605.82 �Pleoental Agreement No. 1 JULY 31, 1991 LITIES AND STREET IMPROVEMENTS ANNON HILLS SECOND ADDITION TY PROJECT NO. 216 CITY CONTRACT NO. 1990 - 5 THE TY OF ROSEMOUNT, MINNESOTA CONTRACTOR : Ceca Utilities, Inc. 201 W. Travelers Trail Burnsville, Minnesota 55337 Ph (612) 890-6169 Fax (612) 890-5701 WORK COMPLETED :-M SPEC. CONTRACT THIS AMOUNT TOTAL TO DATE NO. ITEM QUANTITY UNIT UNIT PRICE TOTAL PRICE MONTH THIS MONTH QUANTITY TOTAL PRICE -------------------------------------------------------------------------------------------------------------------------------- Payment for labor and materials to the contractor, Ceca Utilities, Inc., necessary for added 'Winter Construction' costs of the concrete for curb & gutter construction on Nov. 19 & 20, 1990. Method of payment, 'Time and Materials', equal to $4.82 per cubic yard of concrete 4.82 263 1,267.00 1 of 1 - 4653 xental Agreement No. 2 ------------ JULY 31, 1991 ------------------------- TES AND STREET IMPROVEMENTS N HILLS SECOND ADDITION ROJECT NO. 216 CITY CONTRACT NO. 1990 - 5 ,F ROSEMOUNT, MINNESOTA CONTRACTOR : Ceca Utilities, Inc. 201 W. Travelers Trail Burnsville, Minnesota 55337 Ph (612) 890-6169 Fax (612) 890-5701 WORK COMPLETED SPEC. CONTRACT THIS AMOUNT TOTAL TO DATE NO. ITEM QUANTITY UNIT UNIT PRICE TOTAL PRICE MONTH THIS MONTH QUANTITY TOTAL PRICE ---------------------------------------------------------------------------------------------------------------------------- 'ayment for labor, equipment and materials to the contractor, leca Utilities, Inc. , necessary for installation of trash :ward for 42' F.E.S. on south side of 145th St. per City equested. Method of payment, 'Time and Materials', invoice dated 7/23/91 plus 10 % prime contractor's 526.02 526.02 markup as per MnDOT 1 1704 D 52.60 52.60 ------------ ------------ i 578.62 i 578.62 of I - 4653 0 Ti. rlw) L T PROJ ECT NAMEiS.P. NO. .F*',,�)1"11\1"1,....I),I,(.ilylol,ll) PATH ".-Y SpFyIAL 11 NORTI.-I 113)TAR ('11011C C I'M Y t-3 5 3 F, 01. IJ x "t 15 60`10 26001 PURCHASE ORDER SALES ORDER NO. CUSTOMER NO. TERMS SUB TOfALS,'i. "i , SALES TAX-: M-3 313) ------------------ - :10,*.,), 1 a 526. 02 4. 6' 2 N, AMOUNT DUE' PLEASE PAY FROM THIS INVOICE. NO OTHER DOCUMENTS WILL BE SENT. A FINANCE AMOUNT DUE IF PAID BY CHARGE WILL BE ASSESSED ON ALL PAST DUE ACCOUNTS AT THE MAXIMUM RATE 8 93. ALLOWABLE BY STATE LAW. REMITTANCE COPY v Y.,l o 1:' V PP f ol; X s f 5,tiKtl af{4 i �,p T , v ".-Y SpFyIAL 11 NORTI.-I 113)TAR ('11011C C I'M Y t-3 5 3 F, 01. IJ x "t 15 60`10 26001 PURCHASE ORDER SALES ORDER NO. CUSTOMER NO. TERMS SUB TOfALS,'i. "i , SALES TAX-: M-3 313) ------------------ - :10,*.,), 1 a 526. 02 4. 6' 2 N, AMOUNT DUE' PLEASE PAY FROM THIS INVOICE. NO OTHER DOCUMENTS WILL BE SENT. A FINANCE AMOUNT DUE IF PAID BY CHARGE WILL BE ASSESSED ON ALL PAST DUE ACCOUNTS AT THE MAXIMUM RATE 8 93. ALLOWABLE BY STATE LAW. REMITTANCE COPY Orr Schelen ojms)& Mayeron & Associates, tnc. 2021 East Hennepin Avenue Minneapolis. MK 55413 612-331-8660 FAX 331-3806 Engineers Suneyors Planners Change Order CHANGE ORDER NO. 1 PROJECT: Shannon Hills 2nd Addition Utilities and Street Improvements F NER: City of Rosemount DATE OF ISSUANCE: August 6,1991 NTRACT NO. 1990-5 WNER'S PROJECT NO. 216 CONTRACTOR: Ceca Utilities ENGINEER: Orr-Schelen-Mayeron 201 West Travelers Trail &Associates, Inc. Burnsville, MN 55337 OSM COMM. NO. 4653.00 You are directed to make the following changes in the Contract Documents: Description: Furnish and install approximately 11,724 square feet of concrete sidewalk, 4' thick, 5' wide in lieu of 8' wide bituminous trail as bid. 8' bituminous trail bid price equals 56.50/lineal foot. 5' concrete sidewalk quoted priced equals S8.25/11neal foot. Purpose of Change Order: Change in materials due to request by Developer. Attachments: (List documents supporting change) Letters to and from Contractor requesting and quoting price changes. CHANGE IN CONTRACT PRICE: Original Contract Price $280,466.20 Previous Change Orders No. _ to No. _ SN/A Contract Price Prior to this Change Order 5280,466.20 Net increase () of this Change Order $ 1,820.00 Contract Price with Approved Change Orders $282,286.20 RECOMMENDED: Bud Osmundson, P.E. /cmw 07/15-4653.co APPROVED: Rv- CHANGE IN CONTRACT TIME Original Contract Time N /A Net Change From Previous Change Orders Contract Time Prior to this Change Order Net Increase (Decrease) of Change Order -0- Contract Time with Approved Change Orders City of Rosemount APPROVED: Rv, Ceca Utilities