Back in July of 1991 the aerial truck was taken in for evaluation of its
hydraulic systems. At that time the City Council authorized the fire
department to spend up to $4,300 for estimated repairs. The aerial truck
has been in the shop for repairs and waiting for parts and has just been
returned to the fire department in late September.
As we went through the repair process, it was found that many items had to
be replaced instead of being rebuilt. When an item is replaced on this
vehicle it is also necessary to totally re -fabricate and build from scratch
that part as replacement parts are not available. For that reason many
areas of repair exceeded the ball park estimate which we were given back in
July. John Strese has, since July, been working closely with the repair
people and staying on top of each repair that`has been needed . It was
decided to bring a final total to the council for authorization rather than
piece -meal parts as the entire package had to be completed anyway in order
to make the truck operational.
A breakdown of those charges which are in excess of what the council
authorized has been attached. As was previously noted to the council, all
repairs for this vehicle will come out of Account #101-42210-01-221 and
also Account #229.
RECOMMENDED ACTION:
Motion to authorize the fire department to spend an additional $1,365.61
for aerial truck repairs and further authorize payment of the entire
bill in the amount of $5,665.61.
COUNCIL ACTION:
Expenditure/Aerial Truck Repairs
Consent
PREPARED BY:
AQENDAIV% j� 5E
I LM
Scott Aker, Fire Chief
ATTACHMENTS: Letter Showing Breakdown for
APP OV5D BY;--"
Additional Expenditures
Back in July of 1991 the aerial truck was taken in for evaluation of its
hydraulic systems. At that time the City Council authorized the fire
department to spend up to $4,300 for estimated repairs. The aerial truck
has been in the shop for repairs and waiting for parts and has just been
returned to the fire department in late September.
As we went through the repair process, it was found that many items had to
be replaced instead of being rebuilt. When an item is replaced on this
vehicle it is also necessary to totally re -fabricate and build from scratch
that part as replacement parts are not available. For that reason many
areas of repair exceeded the ball park estimate which we were given back in
July. John Strese has, since July, been working closely with the repair
people and staying on top of each repair that`has been needed . It was
decided to bring a final total to the council for authorization rather than
piece -meal parts as the entire package had to be completed anyway in order
to make the truck operational.
A breakdown of those charges which are in excess of what the council
authorized has been attached. As was previously noted to the council, all
repairs for this vehicle will come out of Account #101-42210-01-221 and
also Account #229.
RECOMMENDED ACTION:
Motion to authorize the fire department to spend an additional $1,365.61
for aerial truck repairs and further authorize payment of the entire
bill in the amount of $5,665.61.
COUNCIL ACTION:
MERGENCY PPARqTU
S MMNTENANCE,1NC.
204 Third Avenue S. E.
New Brighton, MN 55112
(612) 636-6628
Septmeber 26, 1991
Attn: John Strese:
Rosemount Fire Department
2875 145th St. W.
Rosemount, Mn 55068
John,
I spoke with Scott and went over the bill
requested I go through the bill on unit 35180, He
it is, and explain why it is the amount
The items I can tell .are
the #1. The Hydraulic check valve and
bushing that had
Parts $79.01 to be replaced due to the check valve not seating:
Labor 2 hours.
#2. The Hydr
clean filter was contaminated so we
flushed and cleaned It 2 removed the filter
hydraulics to times, each time reinstalling
filter and screen out system contaminants and running
had hard time getting
then installed new
Labor 3 hours. 9 filter housing to stop leaking.
#3. The hose from the Deverter to the filter
..between the hose and
Parts the Crim housing was leaking
$178.17 Labor 3 P, so -we had to replace that also.
.hours.
due#4. The .electric servo valves. were rebuff
dine to the fact new It and reinstalled twice
t ith ones were not available and valves have to be
sycto the system. The 2nd time it was done under warranty.
Parts $540.00 Frei ht
9 $21.73 Total $561.73 Labor 6 hours. Y
#5• Hydraulic oil added to system. Parts
Total p $60.96 Labor .5 hours.
arts listed above = $818.91 plus the labor to
jobs was 14.5 hours, $609.00. preform these
The labor char ed � /! ?. 99
diagnosin g does not include 11.5 hours that was spent on the
g of the servo valves and the hydraulic system to get
ladder retracted and to valves
This was made harder due stop drifting.
is
the boom assemblyto the fact the manufacturin
obsolete no longer in business and the s g company of
, so parts and information to system used is
Thank you, troubleshoot was not available.
EMERGENCY APkRXTUS MAINTENANCE, INC.
r'
i7ave Schreier
Ds:cros