Loading...
HomeMy WebLinkAbout5.e. Expenditure for Aerial Truck RepairsCITY OF ROSEMOUNT EXECUTIVE SUMMARY FOR ACTION CITY COUNCIL MEETING DATE: November 5, 1991 AGENDA ITEM: AGENDA SECTIONS Back in July of 1991 the aerial truck was taken in for evaluation of its hydraulic systems. At that time the City Council authorized the fire department to spend up to $4,300 for estimated repairs. The aerial truck has been in the shop for repairs and waiting for parts and has just been returned to the fire department in late September. As we went through the repair process, it was found that many items had to be replaced instead of being rebuilt. When an item is replaced on this vehicle it is also necessary to totally re -fabricate and build from scratch that part as replacement parts are not available. For that reason many areas of repair exceeded the ball park estimate which we were given back in July. John Strese has, since July, been working closely with the repair people and staying on top of each repair that`has been needed . It was decided to bring a final total to the council for authorization rather than piece -meal parts as the entire package had to be completed anyway in order to make the truck operational. A breakdown of those charges which are in excess of what the council authorized has been attached. As was previously noted to the council, all repairs for this vehicle will come out of Account #101-42210-01-221 and also Account #229. RECOMMENDED ACTION: Motion to authorize the fire department to spend an additional $1,365.61 for aerial truck repairs and further authorize payment of the entire bill in the amount of $5,665.61. COUNCIL ACTION: Expenditure/Aerial Truck Repairs Consent PREPARED BY: AQENDAIV% j� 5E I LM Scott Aker, Fire Chief ATTACHMENTS: Letter Showing Breakdown for APP OV5D BY;--" Additional Expenditures Back in July of 1991 the aerial truck was taken in for evaluation of its hydraulic systems. At that time the City Council authorized the fire department to spend up to $4,300 for estimated repairs. The aerial truck has been in the shop for repairs and waiting for parts and has just been returned to the fire department in late September. As we went through the repair process, it was found that many items had to be replaced instead of being rebuilt. When an item is replaced on this vehicle it is also necessary to totally re -fabricate and build from scratch that part as replacement parts are not available. For that reason many areas of repair exceeded the ball park estimate which we were given back in July. John Strese has, since July, been working closely with the repair people and staying on top of each repair that`has been needed . It was decided to bring a final total to the council for authorization rather than piece -meal parts as the entire package had to be completed anyway in order to make the truck operational. A breakdown of those charges which are in excess of what the council authorized has been attached. As was previously noted to the council, all repairs for this vehicle will come out of Account #101-42210-01-221 and also Account #229. RECOMMENDED ACTION: Motion to authorize the fire department to spend an additional $1,365.61 for aerial truck repairs and further authorize payment of the entire bill in the amount of $5,665.61. COUNCIL ACTION: MERGENCY PPARqTU S MMNTENANCE,1NC. 204 Third Avenue S. E. New Brighton, MN 55112 (612) 636-6628 Septmeber 26, 1991 Attn: John Strese: Rosemount Fire Department 2875 145th St. W. Rosemount, Mn 55068 John, I spoke with Scott and went over the bill requested I go through the bill on unit 35180, He it is, and explain why it is the amount The items I can tell .are the #1. The Hydraulic check valve and bushing that had Parts $79.01 to be replaced due to the check valve not seating: Labor 2 hours. #2. The Hydr clean filter was contaminated so we flushed and cleaned It 2 removed the filter hydraulics to times, each time reinstalling filter and screen out system contaminants and running had hard time getting then installed new Labor 3 hours. 9 filter housing to stop leaking. #3. The hose from the Deverter to the filter ..between the hose and Parts the Crim housing was leaking $178.17 Labor 3 P, so -we had to replace that also. .hours. due#4. The .electric servo valves. were rebuff dine to the fact new It and reinstalled twice t ith ones were not available and valves have to be sycto the system. The 2nd time it was done under warranty. Parts $540.00 Frei ht 9 $21.73 Total $561.73 Labor 6 hours. Y #5• Hydraulic oil added to system. Parts Total p $60.96 Labor .5 hours. arts listed above = $818.91 plus the labor to jobs was 14.5 hours, $609.00. preform these The labor char ed � /! ?. 99 diagnosin g does not include 11.5 hours that was spent on the g of the servo valves and the hydraulic system to get ladder retracted and to valves This was made harder due stop drifting. is the boom assemblyto the fact the manufacturin obsolete no longer in business and the s g company of , so parts and information to system used is Thank you, troubleshoot was not available. EMERGENCY APkRXTUS MAINTENANCE, INC. r' i7ave Schreier Ds:cros