Loading...
HomeMy WebLinkAbout5.m. Water Core Transfer to Project 221EXECUTIVE SUMMARY FOR ACTION CITY COUNCIL MEETING DATE: November 5, 1991 AGENDA ITEM: AGENDA SECTION: Water Core Transfer to Project 221 Consent PREPARED BY: AGENDA11MM 'YY1I Jeff May, Finance Director ATTACHMENTS: Copy of Transfer, Page from APP VE B . Springsted Recommendation 1991B Bond Issue Attached is a transfer from Fund 605, the Water Core Fund, to Fund 422, the Construction Fund for Project 221 - Country Hills 4th Addition Project. This transfer will go directly to the Construction Fund rather than to the Debt Service Fund for this issue. By doing this, we will be reducing the amount that we need to finance on this project by $7,200. The Utility Commission approved this transfer November 4, 1991. RECOMMENDED ACTION: Approve the transfer from Fund 605 to Fund 418, approved previously by the Utility Commission November 4, 1991, to supplement the 1991B Bond Issue proceeds for Project 221. COUNCIL ACTION: ` TRANSFER FORM Transfer from: Amount to betransfered: Paid-up Debt Sery Fund 102 - 49300 - 01 - 710 $ - EDA Funds 201 - 4000 - 01 - 710 $ MSA Funds 203 - 49003 - 01 - 710 $ Water Core Facility Funds 605 - 49501 - 01 - 710 $ J Sewer Core Facility Funds 606 - 49502 - 01 - 710 $ Storm Sewer Surcharge Funds 607 — 49503 - 01 - 710 $ Water Funds 601 = 49400 - 01 - 710 $ Sewer Funds 602 - 49450 - 01 - 710 $ Other Funds _ - - 01 710 $ - 01 - 720 $ Transfer to: _ - 39201 - 00 - 000 39202 - 00 - 000 39203 - 00 - 000 (► --Nc-I at, ti. -s V TN A, ,v � -39204 - 00 000 - 39205 - 00 - 000 _ - 39206 - 00 - 000 _ - 39207 - 00 - 000 _ - 39208 - 00 - 000 _ - 39209 - 00 - 000 Amount to be transfered in: $ (Transfer from Gen'l Fund) $ (Contribution from Enterprise Funds) $ (Transfer from ) $ I J% gD.0 Q (Transfer from Water Hook -Up Core Fund) $ (Transfer from Sewer Hook -Up Core Fund) $ (Transfer from Storm Sewer Connect Fees) $ (Transfer from EDA Fund) $ (Transfer from MSA Fund) $ (Transfer from Paid-up Debt Sery Fund) 2 oe I Authorized by: Department: i Date authorized: Reason for transfer:i-t•R.-jSFe W p, r Sr(vOke c�F �'�� � ,fid r ►Rxt?L�{ CywS .�c� t� �.. N1, l� lii.�'1� ! .h 1 up PR4,4V-( S! No—iey'&*4 foA/ General Journal Entry: L - 10100 104_ 104 y - 3920 - 00 - 000 y11 - 29300 Los - 29400 U25_ -4S2f 01 - 71 0 7 A03. J crus - 10100 - 104_ - 104 General journal entry entered by: Date entered: - - Journal Entry Type: _(Normally will be Type 4) Journal Entry 1: -7 4-UJ.JJ C . t - 16655 West Bluemound Road Construction Engineering Suite 290 Engineering Design Brookfield, WI 53005-5935 Administration (414) 782.8222 Contingency Fax: (414) 782-2904 Total Project Costs 2739 Second Avenue S.E. Less: Water Core Funds Cedar Rapids, IA 52403.1434 Plus: Capitalized Interest (to 2-1-93) (319) 363-2221 ;'; _..... Fax: (319) 363-6999 10,985 Allowance for Discount Bidding 3,445 October 15, 1991 Mayor Vernon J. Napper Members, City Council Mr. Stephan Jilk, Administrator Mr. Jeff May, Finance Director City of Rosemount 2875 -145th Street West Rosemount, MN 55068 SPRINGSTED PUBLIC FINANCE ADVISORS 85 East Seventh Place Suite 100 Saint Paul, MN 55101-2143 (612)223-3000 Fax: (612) 223-3002 6800 College Boulevard Suite 600 Overland Park, KS 66211-1533 (913) 345.8062 Fax: (913) 345.1770 222 South Ninth Street Suite 2825 Minneapolis, MN 55402-3368 (612)333-9177 Fax: (612) 333-2363 Re: Recommendations for the Issuance of: $265,000 General Obligation Improvement Bonds, Series 1991 B and $210,000 General Obligation Equipment Certificates of Indebtedness, Series 1991 C We respectfully request your consideration of our recommendations for the issuance of these bonds and certificates according to the terms and conditions set forth in the attached proposed Terms of Proposal. Each issue will be discussed separately, with items common to both to follow. $265,000 General Obligation Improvement Bonds, Series 1991 B The proceeds of this issue will be used to finance public road and utility improvements to County Hills 4th Addition. The composition of the issue is as follows: Construction Costs $192,212 Construction Engineering 19,387 Engineering Design 12,200 Administration 7,688 Contingency 13.000 Total Project Costs $244,487 Less: Water Core Funds (7,200) X Plus: Capitalized Interest (to 2-1-93) 17,687 Costs of Issuance 10,985 Allowance for Discount Bidding 3,445 Less: Investment Earnings 4.404 Total Bond Issue 1265.000 Capitalized interest in the amount of $17,687 has been included in the issue to cover interest due from the dated date of the bonds to February 1, 1993.