EXECUTIVE SMQMRY FOR ACTION
CITY COUNCIL YMEETING DATE NOVEMBER 5, 1991
AGENDA ITEM:
AGENDA SECTION:
ERICKSON
PARK UPGRADES
NEW BUSINESS
PREPAREDDAVID J.
BECHTOLD
AGENDANEM
-- DIR.-P—& R
ATTACMEENTS:
APP PE BY:
PROJECT
WORK SHEET / OSM CONSULTANTS
2M& - /.�/;
The Town Green Committee has developed'a concept plan fQO7the
development of the area of Erickson Park located next to City
Halla Other areas of the plan are located along the Park & Ride,
the -St. Joseph's Church,Cemetery, the Sunrise Builders Co., State
Highway #3, the site of the future armory, and the rest of the
Erickson Park site.
As identified in this study much of the development of the Town
Green concepts will be done on a "phasing" method. Involved in
this phasing is the relocation of the present hockey rinks next to
city hall as well as the construction of a park shelter next to
the new rink location. The shelter and rinks were.to have been
constructed in the 1.990 program year. These CIP funds were -
approved by Council to be carried forward for project completion.
Because of the "Space Needs Study" conducted that year the funding
for the rinks and shelter were encumbered and transferred for -use
in the 1991 budget year. In 1991 the projects were put on hold
until the Town Green Master Plan could be completed. •
This topic has been discussed at the Town Green meetings and it
was agreed in concept that on a short term basis the hockey rinks
would be relocated in an'area behind and adjacent to the west of
the old Mn.Dot garage building. The rinks and lights would be
scheduled to be taken from the site after from 10 - 15 years and
to be located in another park or as dictated by the citizens at
that time. The shelter that is to be built would be constructed in
an area near the rinks south of the location of the present hockey
rinks.
OSM Engineering has submitted a quote of $ 6,880 to survey the
boarder of Erickson Park, to survey and evaluate the site for the
construction of the park shelter and hockey rinks, and to complete
�:fi fwf Mans 1=11U specs Tor Lne noeKey rinK and shelter are
RECOYMNDED ACTION:
Motion to approve OSM Engineering to complete
the work as identified for Erickson Park for the amount of
6,880. The funds.are to come from accounts # 101-45100-01- (30 3)
(2,250) & C2191 (3,000) / EDA ( 350) / Park Dedication (1,280)
COUNCIL ACTION:
2021 East Hennepin Avenue
Minneapolis, MN $3413
612-331-8660
RE. 71 0 FAX 331-3806
Engineers
June 27, 1991 ,SUN 27 19-51
Architects
ia ne s�
Surveyors
CM OF ROSi10M
Mr. David J. Bechtold
Mr. Boyd Bailey
Parks and Recreation Department
City of Rosemount
2875 145th Street West
Rosemount, MN 55068
Re: Proposal for Engineering Services
for Hockey Rinks North of City Hall
within Erickson Park
City of Rosemount, Minnesota
Dear Dave and Boyd:
Thank you for this opportunity to present this proposal to you to provide engineering
services to the City of Rosemount Parks Department.
The proposed services are for the preliminary investigation, preparation of the grading plan,
and construction staking for the hockey rink area north of City Hall. It would also include
a sanitary sewer extension plan for a future warming building. The total cost of these
services is estimated to be $6,880. The cost includes providing survey control to the area
to enable this proposed improvement and future improvements to be located on file County
Coordinate System. This would allow utilization of data from the County Ultimap System.
The City is expected to provide record plans, plats and concept plans for the area.
The costs and tasks outlined above would be completed at the direction of city staff and
invoiced to the City on an hourly basis. There are many variables involved in this estimate
and it should not be interpreted as a minimum or a maximum cost. We will make every
effort to keep you informed of our costs as the project progresses.
We have on staff a Registered Architect and a Registered Landscape Architect which could
provide you with additional technical expertise for the future improvements within Erickson
Park. We would be happy to provide you with estimates for this work as requested.
Mr. David J. Bechtold
Mr. Boyd Bailey
June 27, 1991
Page 2
Thank you for this opportunity to submit this proposal and estimate of cost. If we may
answer any questions, or clarify any part of this proposal, please do not hesitate to call me
at 378-6377. We look forward to your favorable response and notice to proceed with this
project.
Respectfully,
ORR-SCHELEN-MAYERON
& ASSOCIATES, INC.
r
Bud Osmundson, P.E. D. Edward Ames, L.S.
Project Manager/Associate Vice President
/cmw
06/91 -db
c: Ed DeLaForest, Civil Department Manager
,.71141f.V,
Park Walks F I ~ is � ;r z� .11
- r ; • . TMu i��'u mose
AL
i'
Bu ng
Existing
Flower
Garden I '
Garden Concert S�athi
Path — :r:.: ::` ,•;.;, ^ti\
C r
Ornalilental Sculpture -� ,. • , _ - ,
eek Park
rlook
_ Ove
City Hall Parking Lot
'i Existing
City Hall
Open Picnic Area Co 1W
P.
Gathering Space - - - - -
tees.
a
<X��
K 2
+b� Z
vt°3�m nab
I m � � 145TH STREET
-
!' {/'i'/ �'jn t�t•' / t. it ,", i i1 �1 �4 S i ii
AtiU/77
!%�'� .ifi•'x� f� 1� di � � � �� ��� 1 `xtt � p X11 t '' �� 1 �j - I
/ It �il•.z tsa ttui�I�I , If
Qt fit
ado3i'
-11
`I f
_- 7_
11p JIA:m 6i: r !G ii532i - ,ar
' r f,/ o f ��,• rr" r � t yi r
1 ! / r ` `i !
Ir
' -A
°
l t.- f If' f aV/ � \ i t / 1 � �\t'z•9 1 y� tf' - t '
, fJJ I ( /' 1 titr J r }5 �! r I fi t { � J �;.,` $\ t 9Z' :. J •�
J / !� t`�t�ll(iti�! , ry[ j 111 i + ! 1 r \.{�'i'
/ Jt t ( ...lt'1 'c ' r ft j't��
' `f� lltl/l f J.''t..v` (aSc r~•' / /1l~ )• \ ! t =,-�!
<{ii taRttv.1
1, r /. fir
Ii i NK;i IV:iilJi7i !' p'voc
,r t o o� 7i •il 1 1 1 t� A y
�i fit 1c�¢Z �( f. l trf
47.
� 4��l�. •i rte♦ `�\ � i\�� j/rl �f' ��RG3 � � ... i. Zl_r f!. �ir, t j �S iJa
� 2
//// ` PPP k t !• 'y / - ` w as
t t /J l- gar ro x G•f `Ir�y�
.•rt. m e$4 u ,. if •" t J!X
•t � � i Ii 1 r.Fll iV {til i:r % �'�°' � �+�� 5 � -! o w� L
'Of u. Aio% / 'm mz�& i # /t s ....,rri.t.�
t! <OY
�g�ml ter, i a= t� tyy[t I
�i I/� %r y w!':'./(Znpr ! f{ i to
,{�{.• 7}+.r.r. FV 'l lr��.. /„P, y '• O9 i <y •Tn ?..•i ..J / A
do
tl l 17 +lilt i v 1cC: iti r ,log "; 1 I zs t r1 r
pW j n �ti r + 4 m ' ri
t � � . 1 `i 1 �'✓;;" NIP! � ��t1���' )��t i
t:7 P ` 27t�Ai lit
S t 1 '`
Il / m; =(lit if � `•. t `n �"y ,�E'r. —
--"It' Q
� r �il/j. ��\ '. - `�� � / r -• \ _., � - i" t / tilr r 1 t� `•4 i 1 FI'. S
{' t l:t t d Q I -t; •,�`✓ °� t `S i �isildf'� l j� 1� i y� K�� '�°d
! ht rj/rrT tA. 8'� t �.. \ \ •� l _, �' t,.. - `.t t(), a t��i .Tl ai/Sj
t 11 j
! h3 Y
1 ! i II .I rN1
I I v SAF j�
t i / 1 c r• 1 ,1 .� .. r + , ! 1 g r illf • "/ jpt t i R4 {
�i }r 11..1 I ; b t\ ► "' + tC -: `' 'r." t ►� � iy{, . t ' 1 } 9 i, //r'
1 `� :�I{t.' ' � 11 � ,�'Jr �C �Tr . . � ! 1 i .i o>z�, } �f [��, � 1i •� �[
WW r
hq ,
",�.� `�j t�1f �'U �.,�� �� ,� c:�"/.� r��'��.1 •tti f, !h i� 1' ;r k� t ,: r _,t fff�1f.�i5'
t' r'•"1 �. � � , _ tl � tl a€� , �t,��,�� �. �'-;�, �, ; � � � o
+ �.
'1,! I le 'i 1\: !-.t ,., i• b6 �` / '+(jy'/Y- / yI� p�+mD'j ,}Q
' I f C �'T�/•',.! ((m �� f t�i 14+-1.t a'"il�� ..! ii' _. O.t"'i. 1Si
•� r1
' j , 1 t� \ ,•'' •.w1r, ((( / t ' i Ohm i
r� � Irh�_ .,.r t i ' ! Z , 1 /`• JiF. / '.-� "'.�1n-�.. �..... r...:.+
,} UAW 1 i
!rf L n k ,.tt)
._,,�C � .i.-- � ' C- ` C ' •t � r . ` e 3i / t a,°�_
t
-13
' t !#J j ► t t {1 74
t, I�trlr r i /+�{tint f
j! v ilt3 f l �t -, r pw
pf � / �C 1t1f II�!{ �1- '_!_,,• f 1�r. mQy�p�'Z�`'
* 1 u fit;/ ! 1 ir(� rq! fl jltai b `- / xmDS7 1
.may. r 1 i . . r
4c__"D•��'"-1 1 1 lt J �; f l / 3,Z^
all f� 'i I i — .. I /� I/71f({ (jr// i/ -' \" J° Fri +fit
�1 �_ rEiryfil,!! / , t ! C { { { i ( =. / t � � fJr ' 1 ^ 1 \ \ 1 11 -9 rto�
I' ZO,�O+"y'~
i>;ilittNilrri�rtf i' J f tr/( t � - I t _: r• Z�'�". \,� ,ktti�m�.,� �
' ,�ti
`( } 14 �1ttN II{ks'ii t i r° III//
y�'`�'t�t�F1 t {
'f i i" Ji I' \\\ i 14 t i i, r (r v-'�'• i i� i i i
illt
_t 1'L.fLFL_FLF— �i Flt 4=-1 - ',�'►� �i 111 \�14t� I�° Z� 1'�tik��it� It
1 • _ ` `l�, p �;) r i � { t �� `\ ' - M - �. --' /i � I 1 I k 1 t 1 i
i 1 '/ f Willi t
If = - / I /. f i ;fit ,r 'tom �_-_>
l
L _: fi Jrf1;tl ��� .�l E
f. .•ti' '1 F° i- js f!!{/ ! !!!�/f! !// y t 1� r
tZfr-� 1I- 1I 1.{' t \t�iAf!// /r. Jv {•ii'! - fir` z W
; !!�! !!!� !! ,` ,t 1!
X1,1�fl,! Q.. rt
.tt\l1
�J � � � � t ~I
11 .
\�1,t\ti
Figure lr Erickson Community City of Rosemount Brauer & Associates, Ltd.
t Site -Analysis Square 2875 145th Street North 7901 Flying Cloud Dfift
Rosemount, MN SSW Eden Prairic, MN 55344
o
-
•.r 9 Z
ROSEMOUNT MIDDLE SCHOOL rs
ROSEMOUNT HIGH SCHOOL IOU
ARMORY on
VISITOR INFORMATION. AREA
_SHORT TERM PARKING
ROSE GARDEN
EVENTS KIOSK . Y
nnoNUMENT - DOWNT_OWN ROSEMOUNT I.D. SIGNAGE
mill
ST. JOSEPH CHURCH 1 .OZ
.
h� H
.s'+"" y' O
r� A E
PARK AN s - •�,�
VEDESTRIAN AND e , PEDESTRIAN I V
_ i wnpnpAAc
mcla ma
Jam: �'Y.•..ifi��
CR
FILL
.— F Ia.iWaF-a\nC -- I" ---7
CITY HALL
FLOWERING SHRUB NIC ARE 'N E
P Y FEAT
ORCHARD PLANTING c, RESIDENTIAL
ERICKSON ATHLETIC PARK
ORCHARD PLANTING rL.
NORTH
0 225' 450'
SCALE (APPROXIMATE) r
i
ROSEMOUNT MIDDLE SCHOOL ROSEMOUNT HIGH SCHOOL
VISLTORINFOR MATl_ON AREA
SHORT TERM PARKING
ROSE GARDEN
EVENTS KIOSK ARMORY
MONUMENT
ST. JOSEPH CHURCH '" - PEDESTRIAN UNDERPASS
PARK AND RIDE LOT
DOWNTOWN ROSEMOUNT I.D. SIGNAGE
_ CEMETERY
aV" 4
U
�a
Ei 1
cc
V=
OVT
CITY HALL
7
ERICKSON ATHLETIC PARK
\EVERGREEN.BUF_FER-.PLANTING
i
V
NORTH
0 225' 450' ,
SCALE (APPROXIMATE)
API
-NO
6, mill
�t-
7A�
17,
0
7-7-4
•
7-7-4
ZU • !' t�
N1tli' ilf�fii �ha� `r�i
-!111' /f/}�1` 1i1� � • ..$'�_
l
'
.;,lr �� �.�,. ,Ctt1, •r r1�`�.y ',7 ry � ies. � F. ::Nw ei�..,�rl,�r �wi^�, _
s _.tfff
�' 'C71�°- ��i',fl�t •�n.• -� y�i�� _ Ail- "r � �\._ •
moi_ fi1�: St �, •
J
.� '��: � r � ., `, �_ ,tib •
z
� 1. � ,�. - ♦ 1 11 F � ice:
�- - _�!_ / ' f� %%�� r �`t,I, yet. �-� . � •, i�'(�. +�` � , t
N o S
✓ e\e� mit �`,� 'r ' s' 1� 1 � � �� 't'
�'" � .::�'� _ • t.. `moi\ yF�`
,, +i.`�;: "•, X r�r(}ti � b 'fit\
t f,
✓'< "fir! � J1L , .;
t�" � ®® � Z• .ryye.. /'.�I``'. �� �,�'.;.
uk �..�� ? �u ,.. r ;r-. /,era+ :`'� .,r ;:� y t• •.5 �, �,` .i. �,., 4
145th sereu
W 1 i1 D (q
S . w
'
.1 r 'I
N p 1 1 X11 1 -�
77
1
WE
�.
f �} 143rd Street
pr
Sso
N J{
m y ?tn a ,\
,2, 8 , \
ro
�p r
142nd street
i
oo
14
G i
1,
y
r
i
4q W
,!
Q i.
t 2 I
Nv f<'_ a
q f
1 9
>
/ % t
r'
Figure 5 (Pan 1 of 2): Erickson Community City of Rosemount Brauer & Associates, Ltd.
Master Plan 2875 145th street North 7901 flying aoud Drive
Square Rosemount, MN 55068 Eden Prairie, MN 55314
AN
Fill
HOW
41
� n /[rl �. . y
ago
■
PF
kj
♦
� ,r� v�. ``q. ` � ..� _ J �.__. _" i "®fl -�.'CJ`•3i�- _� �#.r its � ��$, A
+ ..�. ■�eid�e��i���J,�e"" i/ '7omO1������`�>dd��2�;.di�/r' I
{(y _
;N7 C." A�� r.`��l�i� � ,��' € ,�f/ t� ":y�,l� � ,'s,+� ��®�i A ��Al1t' r iii ° ��f►
(:�a*€ Ny
.�C��l�c •jai== .. -� ef'� � ` �I _•_\\ _ a `y�\`Y ��- 1/
��., \�� �a\`�/i•' /, _�r�/' �RI., 41 t�lv — ifs}`�s �/1r7= /�� � Q'{ _\
• ,F, iia;. �/..��:�'
♦If/js
\i.�iJ_� 3�j �..- r�� � �Jfrkr f� 1•� y_
_til�I�/ j� \P%/�R•��,'s/'+ ��`l. 'iir,) �t SRM` ,J�. ♦� I i,(
n
Erickson Community Square Master Plan
Erickson Community Square Park Area Cost Estimate (continued)
Cost
Estimate and General Phasing Program
Estimated Costs Phase I ` Phase II
Erickson Community Square Park Area Cost Estimate
Phase 11
Phase III
iiffi
Estimated Costa
Phase I Phase R Phase III
(5 -10 W.)
Description
(1991 dollars)
(0 -S vrs.) ( s •10 Ws.) (10-15
$ 30,000
1
Genual site preparation on
S 35,000
S 35,0011
south and of site (south of
34 Park entrance feature $ 25,000
S25,000
structure - includes genual
amphitheater, - includes general
$ 30,000'
(seed/sod, etc.) between multi-
removals, base grading (not
purpose building and Hwy. 3.
i
amphitheater), minor utility work, etc.
sewers, etc.
5670,000
2
Mu ki-purpose building on south
S 14000
51201000
$ 45,000
end of site.
Combined totak 52,102,000 5624000 672,000
3
Open shelter adjacent to multi-
$ 35,000
$ 35AM
18
purpose bldg. on south end of
S30,000
$ 30,000
jiggl Descriplion (1991 dollars) (0 -5 Ws.) (5 -10 W.)
site
site.
1 Construction of a pedestrian S100,000-
4
Deck area adjacent to mold -purpose
$ 70,000
$ 70,000
$ 30,000
building and open shelter (brick or
between amphitheater and
concrete pavers with concrete paving)
on the assumption that it would be constructed in conjunction with the upgrading of the
5
Concrete paving for pedestrian
$ 40,000
$ 40,000
walks (includes small bridges across
Small group picnic, shelter
$ 30,000
$ 30,000
ornamental pond) on south end of site
on north end of site.
(IG -15 vis.)
(patterned finish)
from 500000 ,
I Streetacaping program om down- S
21
6
Ornamental pond on south end of
$ 65,000
$ 65,000
including trails and sidewalks
site (includes two water fountains)
pedestrian and street fighting,
7
Ornamental sculpture on south end
S 5,000
$ 5,000
$15,000
of site (near multi-purpose bldg.)
arouad existing pond.
8
Asphalt trail from City Hall parking
$20,000
S 20,000
Ornamental site amenities between
lot to park & ride and amphitheater
$15,000
stage area ,
9
Amphitheater genual grading and
S35,000
$ 35,000
shaping for concert seating
trash receptacles, eta)
(includes elect. service).
24
10
Pedestrian level lighting on sash
$ 35,000
S35,000
and (along walks and near bldg, deck,
and amphitheater).
structure (along walks, near bldg
11
Ornamental site amenities on south
$ 20,000
S 20AM
and of site (benches, picnic tables,
25
General planting and landscaping
trash receptacles, drinking
$ 25,000
fountains, etc.)
12
Stepping stone walk through
S 12,000
S 12,000
existing flower garden
26
Genual site preparation
13
Geoeral planting and landscaping
$ 30,000
$ 30,000
between multi-purpose building
(seed/sod, etc) on south end of site.
14
Amphitheater stage, formal seating
$150,000
$15o o00
for 350, and concrete paved
removals, basic grading, basic
walkway to deck area
utilities, etc.
15
Improvements to existing City Hag
S20,000
$ 20,000
Multi-purpose building near new
parking lot.
-
Erickson Community Square Park Area Cost Estimate (continued)
Erickson Community Square Park Area Cost Estimate (continued)
Estimated Costs Phase I ` Phase II
Estimated Costs Phase 1
Phase 11
Phase III
iiffi
Descrilgion
(1991 dollars) (n -5 vrs.)
- -
(5 -10 W.)
(10.15 vrs 1
16
General site preparation between '--
$ 30,000
$ 30,000
$ 50,000
amphitheater and community play
34 Park entrance feature $ 25,000
S25,000
structure - includes genual
25 General planting and landscaping $ 30,000
$ 30,000'
(seed/sod, etc.) between multi-
removals, basic grading, storm
purpose building and Hwy. 3.
i
sewers, etc.
5670,000
Plus contingency and professional services: $ 350,000 $104,000 5112,000
17
Asphalt trail between amphitheater,
$ 45,000
$ 45,000
Combined totak 52,102,000 5624000 672,000
and community play structure
Hwy. 3 Pedestrian Underpass Cost Estimate
18
Ornamental pond on north end of
S30,000
$ 30,000
jiggl Descriplion (1991 dollars) (0 -5 Ws.) (5 -10 W.)
site.
1 Construction of a pedestrian S100,000-
S100,000 -
19
Picnic shelters/park overlooks (4)
$ 30,000
$ 30,000
between amphitheater and
on the assumption that it would be constructed in conjunction with the upgrading of the
community play structure.
roadway.
20
Small group picnic, shelter
$ 30,000
$ 30,000
Phase III `
on north end of site.
(IG -15 vis.)
from 500000 ,
I Streetacaping program om down- S
21
Community play structure on
5150,000
S150,000
including trails and sidewalks
north end of site
pedestrian and street fighting,
22
Restoration of natural vegetation
$15,000
$15,000
along cemetery, and plant materials
arouad existing pond.
and landscaping
23
Ornamental site amenities between
$ 15,000
$15,000
amphitheater and community play
strucntre (benches, picnic tables,
trash receptacles, eta)
24
Pedestrian level lighting between
$ 20,000
$ 20,000
amphitheater and community play
structure (along walks, near bldg
and play structure).
25
General planting and landscaping
$ 25,000
$ 25,000
(seed/sod, etc) between amphitheater
and community play structure.
26
Genual site preparation
$100,000
$100,000
between multi-purpose building
and Hwy. 3 - includes general
removals, basic grading, basic
utilities, etc.
27
Multi-purpose building near new
5145,000
$145,000
parking lot
28
Parking lot and entrance drive
$170,000
$170,000
29
Asphalt trails between multi-
$ 30,000
5 30,000
_
purpose building and Hwy. 3
30
Path lighting between multi-
$40,000
$ 40,000
purpose building and Hwy.3 and
parking lot lighting
Erickson Community Square Park Area Cost Estimate (continued)
Estimated Costs Phase I ` Phase II
Phase III
1= Description (1991 dollars) (0 -5 vra-) (5 -lo vrs.l
(10..15 Ks.)
31 Hockey rinks with fights (2) $ 70,000 -- -
S701000 `
32 Volleyball and horseshoe pits S 10,000
$ 10,000
33 large [roup picnic shelter near $ 50,000
$ 50,000
Hwy. 3
34 Park entrance feature $ 25,000
S25,000
25 General planting and landscaping $ 30,000
$ 30,000'
(seed/sod, etc.) between multi-
purpose building and Hwy. 3.
i
Total 51,752,000• S522,000 5560AM
5670,000
Plus contingency and professional services: $ 350,000 $104,000 5112,000
$134,000
(20%)
Combined totak 52,102,000 5624000 672,000
58041000
Hwy. 3 Pedestrian Underpass Cost Estimate
Estimated Costs Phase I Phase H
Phase III
jiggl Descriplion (1991 dollars) (0 -5 Ws.) (5 -10 W.)
1 Construction of a pedestrian S100,000-
S100,000 -
underpass under Hwy. 3. 150,000
5150,000
"(17 wide x 1(Y high min.)
Note: The estimated cost associated with the construction of the pedestrian underpass is based
on the assumption that it would be constructed in conjunction with the upgrading of the
roadway.
S. Robert Trail/Hwy. 3 Streetscaping Cost Estimate
Estimated Costs Phase I Phase N
Phase III `
I= Descri ion (1991 dollars) (0 -5 vis.) (5 -10 vis.)
(IG -15 vis.)
from 500000 ,
I Streetacaping program om down- S
5500 ,000-
town to north of armory site - 5650.000
5650,000
including trails and sidewalks
pedestrian and street fighting,
site amenities, ornamental fence
along cemetery, and plant materials
and landscaping
Note: Streetscaping estimate does not include costs directly associated with roadway work, including
roadway paving, curb and gutter, general utilities, and general grading.