Loading...
HomeMy WebLinkAbout7.b. Erickson Park UpgradesCITYOF ROSEMOUNTT EXECUTIVE SMQMRY FOR ACTION CITY COUNCIL YMEETING DATE NOVEMBER 5, 1991 AGENDA ITEM: AGENDA SECTION: ERICKSON PARK UPGRADES NEW BUSINESS PREPAREDDAVID J. BECHTOLD AGENDANEM -- DIR.-P—& R ATTACMEENTS: APP PE BY: PROJECT WORK SHEET / OSM CONSULTANTS 2M& - /.�/; The Town Green Committee has developed'a concept plan fQO7the development of the area of Erickson Park located next to City Halla Other areas of the plan are located along the Park & Ride, the -St. Joseph's Church,Cemetery, the Sunrise Builders Co., State Highway #3, the site of the future armory, and the rest of the Erickson Park site. As identified in this study much of the development of the Town Green concepts will be done on a "phasing" method. Involved in this phasing is the relocation of the present hockey rinks next to city hall as well as the construction of a park shelter next to the new rink location. The shelter and rinks were.to have been constructed in the 1.990 program year. These CIP funds were - approved by Council to be carried forward for project completion. Because of the "Space Needs Study" conducted that year the funding for the rinks and shelter were encumbered and transferred for -use in the 1991 budget year. In 1991 the projects were put on hold until the Town Green Master Plan could be completed. • This topic has been discussed at the Town Green meetings and it was agreed in concept that on a short term basis the hockey rinks would be relocated in an'area behind and adjacent to the west of the old Mn.Dot garage building. The rinks and lights would be scheduled to be taken from the site after from 10 - 15 years and to be located in another park or as dictated by the citizens at that time. The shelter that is to be built would be constructed in an area near the rinks south of the location of the present hockey rinks. OSM Engineering has submitted a quote of $ 6,880 to survey the boarder of Erickson Park, to survey and evaluate the site for the construction of the park shelter and hockey rinks, and to complete �:fi fwf Mans 1=11U specs Tor Lne noeKey rinK and shelter are RECOYMNDED ACTION: Motion to approve OSM Engineering to complete the work as identified for Erickson Park for the amount of 6,880. The funds.are to come from accounts # 101-45100-01- (30 3) (2,250) & C2191 (3,000) / EDA ( 350) / Park Dedication (1,280) COUNCIL ACTION: 2021 East Hennepin Avenue Minneapolis, MN $3413 612-331-8660 RE. 71 0 FAX 331-3806 Engineers June 27, 1991 ,SUN 27 19-51 Architects ia ne s� Surveyors CM OF ROSi10M Mr. David J. Bechtold Mr. Boyd Bailey Parks and Recreation Department City of Rosemount 2875 145th Street West Rosemount, MN 55068 Re: Proposal for Engineering Services for Hockey Rinks North of City Hall within Erickson Park City of Rosemount, Minnesota Dear Dave and Boyd: Thank you for this opportunity to present this proposal to you to provide engineering services to the City of Rosemount Parks Department. The proposed services are for the preliminary investigation, preparation of the grading plan, and construction staking for the hockey rink area north of City Hall. It would also include a sanitary sewer extension plan for a future warming building. The total cost of these services is estimated to be $6,880. The cost includes providing survey control to the area to enable this proposed improvement and future improvements to be located on file County Coordinate System. This would allow utilization of data from the County Ultimap System. The City is expected to provide record plans, plats and concept plans for the area. The costs and tasks outlined above would be completed at the direction of city staff and invoiced to the City on an hourly basis. There are many variables involved in this estimate and it should not be interpreted as a minimum or a maximum cost. We will make every effort to keep you informed of our costs as the project progresses. We have on staff a Registered Architect and a Registered Landscape Architect which could provide you with additional technical expertise for the future improvements within Erickson Park. We would be happy to provide you with estimates for this work as requested. Mr. David J. Bechtold Mr. Boyd Bailey June 27, 1991 Page 2 Thank you for this opportunity to submit this proposal and estimate of cost. If we may answer any questions, or clarify any part of this proposal, please do not hesitate to call me at 378-6377. We look forward to your favorable response and notice to proceed with this project. Respectfully, ORR-SCHELEN-MAYERON & ASSOCIATES, INC. r Bud Osmundson, P.E. D. Edward Ames, L.S. Project Manager/Associate Vice President /cmw 06/91 -db c: Ed DeLaForest, Civil Department Manager ,.71141f.V, Park Walks F I ~ is � ;r z� .11 - r ; • . TMu i��'u mose AL i' Bu ng Existing Flower Garden I ' Garden Concert S�athi Path — :r:.: ::` ,•;.;, ^ti\ C r Ornalilental Sculpture -� ,. • , _ - , eek Park rlook _ Ove City Hall Parking Lot 'i Existing City Hall Open Picnic Area Co 1W P. Gathering Space - - - - - tees. a <X�� K 2 +b� Z vt°3�m nab I m � � 145TH STREET - !' {/'i'/ �'jn t�t•' / t. it ,", i i1 �1 �4 S i ii AtiU/77 !%�'� .ifi•'x� f� 1� di � � � �� ��� 1 `xtt � p X11 t '' �� 1 �j - I / It �il•.z tsa ttui�I�I , If Qt fit ado3i' -11 `I f _- 7_ 11p JIA:m 6i: r !G ii532i - ,ar ' r f,/ o f ��,• rr" r � t yi r 1 ! / r ` `i ! Ir ' -A ° l t.- f If' f aV/ � \ i t / 1 � �\t'z•9 1 y� tf' - t ' , fJJ I ( /' 1 titr J r }5 �! r I fi t { � J �;.,` $\ t 9Z' :. J •� J / !� t`�t�ll(iti�! , ry[ j 111 i + ! 1 r \.{�'i' / Jt t ( ...lt'1 'c ' r ft j't�� ' `f� lltl/l f J.''t..v` (aSc r~•' / /1l~ )• \ ! t =,-�! <{ii taRttv.1 1, r /. fir Ii i NK;i IV:iilJi7i !' p'voc ,r t o o� 7i •il 1 1 1 t� A y �i fit 1c�¢Z �( f. l trf 47. � 4��l�. •i rte♦ `�\ � i\�� j/rl �f' ��RG3 � � ... i. Zl_r f!. �ir, t j �S iJa � 2 //// ` PPP k t !• 'y / - ` w as t t /J l- gar ro x G•f `Ir�y� .•rt. m e$4 u ,. if •" t J!X •t � � i Ii 1 r.Fll iV {til i:r % �'�°' � �+�� 5 � -! o w� L 'Of u. Aio% / 'm mz�& i # /t s ....,rri.t.� t! <OY �g�ml ter, i a= t� tyy[t I �i I/� %r y w!':'./(Znpr ! f{ i to ,{�{.• 7}+.r.r. FV 'l lr��.. /„P, y '• O9 i <y •Tn ?..•i ..J / A do tl l 17 +lilt i v 1cC: iti r ,log "; 1 I zs t r1 r pW j n �ti r + 4 m ' ri t � � . 1 `i 1 �'✓;;" NIP! � ��t1���' )��t i t:7 P ` 27t�Ai lit S t 1 '` Il / m; =(lit if � `•. t `n �"y ,�E'r. — --"It' Q � r �il/j. ��\ '. - `�� � / r -• \ _., � - i" t / tilr r 1 t� `•4 i 1 FI'. S {' t l:t t d Q I -t; •,�`✓ °� t `S i �isildf'� l j� 1� i y� K�� '�°d ! ht rj/rrT tA. 8'� t �.. \ \ •� l _, �' t,.. - `.t t(), a t��i .Tl ai/Sj t 11 j ! h3 Y 1 ! i II .I rN1 I I v SAF j� t i / 1 c r• 1 ,1 .� .. r + , ! 1 g r illf • "/ jpt t i R4 { �i }r 11..1 I ; b t\ ► "' + tC -: `' 'r." t ►� � iy{, . t ' 1 } 9 i, //r' 1 `� :�I{t.' ' � 11 � ,�'Jr �C �Tr . . � ! 1 i .i o>z�, } �f [��, � 1i •� �[ WW r hq , ",�.� `�j t�1f �'U �.,�� �� ,� c:�"/.� r��'��.1 •tti f, !h i� 1' ;r k� t ,: r _,t fff�1f.�i5' t' r'•"1 �. � � , _ tl � tl a€� , �t,��,�� �. �'-;�, �, ; � � � o + �. '1,! I le 'i 1\: !-.t ,., i• b6 �` / '+(jy'/Y- / yI� p�+mD'j ,}Q ' I f C �'T�/•',.! ((m �� f t�i 14+-1.t a'"il�� ..! ii' _. O.t"'i. 1Si •� r1 ' j , 1 t� \ ,•'' •.w1r, ((( / t ' i Ohm i r� � Irh�_ .,.r t i ' ! Z , 1 /`• JiF. / '.-� "'.�1n-�.. �..... r...:.+ ,} UAW 1 i !rf L n k ,.tt) ._,,�C � .i.-- � ' C- ` C ' •t � r . ` e 3i / t a,°�_ t -13 ' t !#J j ► t t {1 74 t, I�trlr r i /+�{tint f j! v ilt3 f l �t -, r pw pf � / �C 1t1f II�!{ �1- '_!_,,• f 1�r. mQy�p�'Z�`' * 1 u fit;/ ! 1 ir(� rq! fl jltai b `- / xmDS7 1 .may. r 1 i . . r 4c__"D•��'"-1 1 1 lt J �; f l / 3,Z^ all f� 'i I i — .. I /� I/71f({ (jr// i/ -' \" J° Fri +fit �1 �_ rEiryfil,!! / , t ! C { { { i ( =. / t � � fJr ' 1 ^ 1 \ \ 1 11 -9 rto� I' ZO,�O+"y'~ i>;ilittNilrri�rtf i' J f tr/( t � - I t _: r• Z�'�". \,� ,ktti�m�.,� � ' ,�ti `( } 14 �1ttN II{ks'ii t i r° III// y�'`�'t�t�F1 t { 'f i i" Ji I' \\\ i 14 t i i, r (r v-'�'• i i� i i i illt _t 1'L.fLFL_FLF— �i Flt 4=-1 - ',�'►� �i 111 \�14t� I�° Z� 1'�tik��it� It 1 • _ ` `l�, p �;) r i � { t �� `\ ' - M - �. --' /i � I 1 I k 1 t 1 i i 1 '/ f Willi t If = - / I /. f i ;fit ,r 'tom �_-_> l L _: fi Jrf1;tl ��� .�l E f. .•ti' '1 F° i- js f!!{/ ! !!!�/f! !// y t 1� r tZfr-� 1I- 1I 1.{' t \t�iAf!// /r. Jv {•ii'! - fir` z W ; !!�! !!!� !! ,` ,t 1! X1,1�fl,! Q.. rt .tt\l1 �J � � � � t ~I 11 . \�1,t\ti Figure lr Erickson Community City of Rosemount Brauer & Associates, Ltd. t Site -Analysis Square 2875 145th Street North 7901 Flying Cloud Dfift Rosemount, MN SSW Eden Prairic, MN 55344 o - •.r 9 Z ROSEMOUNT MIDDLE SCHOOL rs ROSEMOUNT HIGH SCHOOL IOU ARMORY on VISITOR INFORMATION. AREA _SHORT TERM PARKING ROSE GARDEN EVENTS KIOSK . Y nnoNUMENT - DOWNT_OWN ROSEMOUNT I.D. SIGNAGE mill ST. JOSEPH CHURCH 1 .OZ . h� H .s'+"" y' O r� A E PARK AN s - •�,� VEDESTRIAN AND e , PEDESTRIAN I V _ i wnpnpAAc mcla ma Jam: �'Y.•..ifi�� CR FILL .— F Ia.iWaF-a\nC -- I" ---7 CITY HALL FLOWERING SHRUB NIC ARE 'N E P Y FEAT ORCHARD PLANTING c, RESIDENTIAL ERICKSON ATHLETIC PARK ORCHARD PLANTING rL. NORTH 0 225' 450' SCALE (APPROXIMATE) r i ROSEMOUNT MIDDLE SCHOOL ROSEMOUNT HIGH SCHOOL VISLTORINFOR MATl_ON AREA SHORT TERM PARKING ROSE GARDEN EVENTS KIOSK ARMORY MONUMENT ST. JOSEPH CHURCH '" - PEDESTRIAN UNDERPASS PARK AND RIDE LOT DOWNTOWN ROSEMOUNT I.D. SIGNAGE _ CEMETERY aV" 4 U �a Ei 1 cc V= OVT CITY HALL 7 ERICKSON ATHLETIC PARK \EVERGREEN.BUF_FER-.PLANTING i V NORTH 0 225' 450' , SCALE (APPROXIMATE) API -NO 6, mill �t- 7A� 17, 0 7-7-4 • 7-7-4 ZU • !' t� N1tli' ilf�fii �ha� `r�i -!111' /f/}�1` 1i1� � • ..$'�_ l ' .;,lr �� �.�,. ,Ctt1, •r r1�`�.y ',7 ry � ies. � F. ::Nw ei�..,�rl,�r �wi^�, _ s _.tfff �' 'C71�°- ��i',fl�t •�n.• -� y�i�� _ Ail- "r � �\._ • moi_ fi1�: St �, • J .� '��: � r � ., `, �_ ,tib • z � 1. � ,�. - ♦ 1 11 F � ice: �- - _�!_ / ' f� %%�� r �`t,I, yet. �-� . � •, i�'(�. +�` � , t N o S ✓ e\e� mit �`,� 'r ' s' 1� 1 � � �� 't' �'" � .::�'� _ • t.. `moi\ yF�` ,, +i.`�;: "•, X r�r(}ti � b 'fit\ t f, ✓'< "fir! � J1L , .; t�" � ®® � Z• .ryye.. /'.�I``'. �� �,�'.;. uk �..�� ? �u ,.. r ;r-. /,era+ :`'� .,r ;:� y t• •.5 �, �,` .i. �,., 4 145th sereu W 1 i1 D (q S . w ' .1 r 'I N p 1 1 X11 1 -� 77 1 WE �. f �} 143rd Street pr Sso N J{ m y ?tn a ,\ ,2, 8 , \ ro �p r 142nd street i oo 14 G i 1, y r i 4q W ,! Q i. t 2 I Nv f<'_ a q f 1 9 > / % t r' Figure 5 (Pan 1 of 2): Erickson Community City of Rosemount Brauer & Associates, Ltd. Master Plan 2875 145th street North 7901 flying aoud Drive Square Rosemount, MN 55068 Eden Prairie, MN 55314 AN Fill HOW 41 � n /[rl �. . y ago ■ PF kj ♦ � ,r� v�. ``q. ` � ..� _ J �.__. _" i "®fl -�.'CJ`•3i�- _� �#.r its � ��$, A + ..�. ■�eid�e��i���J,�e"" i/ '7omO1������`�>dd��2�;.di�/r' I {(y _ ;N7 C." A�� r.`��l�i� � ,��' € ,�f/ t� ":y�,l� � ,'s,+� ��®�i A ��Al1t' r iii ° ��f► (:�a*€ Ny .�C��l�c •jai== .. -� ef'� � ` �I _•_\\ _ a `y�\`Y ��- 1/ ��., \�� �a\`�/i•' /, _�r�/' �RI., 41 t�lv — ifs}`�s �/1r7= /�� � Q'{ _\ • ,F, iia;. �/..��:�' ♦If/js \i.�iJ_� 3�j �..- r�� � �Jfrkr f� 1•� y_ _til�I�/ j� \P%/�R•��,'s/'+ ��`l. 'iir,) �t SRM` ,J�. ♦� I i,( n Erickson Community Square Master Plan Erickson Community Square Park Area Cost Estimate (continued) Cost Estimate and General Phasing Program Estimated Costs Phase I ` Phase II Erickson Community Square Park Area Cost Estimate Phase 11 Phase III iiffi Estimated Costa Phase I Phase R Phase III (5 -10 W.) Description (1991 dollars) (0 -S vrs.) ( s •10 Ws.) (10-15 $ 30,000 1 Genual site preparation on S 35,000 S 35,0011 south and of site (south of 34 Park entrance feature $ 25,000 S25,000 structure - includes genual amphitheater, - includes general $ 30,000' (seed/sod, etc.) between multi- removals, base grading (not purpose building and Hwy. 3. i amphitheater), minor utility work, etc. sewers, etc. 5670,000 2 Mu ki-purpose building on south S 14000 51201000 $ 45,000 end of site. Combined totak 52,102,000 5624000 672,000 3 Open shelter adjacent to multi- $ 35,000 $ 35AM 18 purpose bldg. on south end of S30,000 $ 30,000 jiggl Descriplion (1991 dollars) (0 -5 Ws.) (5 -10 W.) site site. 1 Construction of a pedestrian S100,000- 4 Deck area adjacent to mold -purpose $ 70,000 $ 70,000 $ 30,000 building and open shelter (brick or between amphitheater and concrete pavers with concrete paving) on the assumption that it would be constructed in conjunction with the upgrading of the 5 Concrete paving for pedestrian $ 40,000 $ 40,000 walks (includes small bridges across Small group picnic, shelter $ 30,000 $ 30,000 ornamental pond) on south end of site on north end of site. (IG -15 vis.) (patterned finish) from 500000 , I Streetacaping program om down- S 21 6 Ornamental pond on south end of $ 65,000 $ 65,000 including trails and sidewalks site (includes two water fountains) pedestrian and street fighting, 7 Ornamental sculpture on south end S 5,000 $ 5,000 $15,000 of site (near multi-purpose bldg.) arouad existing pond. 8 Asphalt trail from City Hall parking $20,000 S 20,000 Ornamental site amenities between lot to park & ride and amphitheater $15,000 stage area , 9 Amphitheater genual grading and S35,000 $ 35,000 shaping for concert seating trash receptacles, eta) (includes elect. service). 24 10 Pedestrian level lighting on sash $ 35,000 S35,000 and (along walks and near bldg, deck, and amphitheater). structure (along walks, near bldg 11 Ornamental site amenities on south $ 20,000 S 20AM and of site (benches, picnic tables, 25 General planting and landscaping trash receptacles, drinking $ 25,000 fountains, etc.) 12 Stepping stone walk through S 12,000 S 12,000 existing flower garden 26 Genual site preparation 13 Geoeral planting and landscaping $ 30,000 $ 30,000 between multi-purpose building (seed/sod, etc) on south end of site. 14 Amphitheater stage, formal seating $150,000 $15o o00 for 350, and concrete paved removals, basic grading, basic walkway to deck area utilities, etc. 15 Improvements to existing City Hag S20,000 $ 20,000 Multi-purpose building near new parking lot. - Erickson Community Square Park Area Cost Estimate (continued) Erickson Community Square Park Area Cost Estimate (continued) Estimated Costs Phase I ` Phase II Estimated Costs Phase 1 Phase 11 Phase III iiffi Descrilgion (1991 dollars) (n -5 vrs.) - - (5 -10 W.) (10.15 vrs 1 16 General site preparation between '-- $ 30,000 $ 30,000 $ 50,000 amphitheater and community play 34 Park entrance feature $ 25,000 S25,000 structure - includes genual 25 General planting and landscaping $ 30,000 $ 30,000' (seed/sod, etc.) between multi- removals, basic grading, storm purpose building and Hwy. 3. i sewers, etc. 5670,000 Plus contingency and professional services: $ 350,000 $104,000 5112,000 17 Asphalt trail between amphitheater, $ 45,000 $ 45,000 Combined totak 52,102,000 5624000 672,000 and community play structure Hwy. 3 Pedestrian Underpass Cost Estimate 18 Ornamental pond on north end of S30,000 $ 30,000 jiggl Descriplion (1991 dollars) (0 -5 Ws.) (5 -10 W.) site. 1 Construction of a pedestrian S100,000- S100,000 - 19 Picnic shelters/park overlooks (4) $ 30,000 $ 30,000 between amphitheater and on the assumption that it would be constructed in conjunction with the upgrading of the community play structure. roadway. 20 Small group picnic, shelter $ 30,000 $ 30,000 Phase III ` on north end of site. (IG -15 vis.) from 500000 , I Streetacaping program om down- S 21 Community play structure on 5150,000 S150,000 including trails and sidewalks north end of site pedestrian and street fighting, 22 Restoration of natural vegetation $15,000 $15,000 along cemetery, and plant materials arouad existing pond. and landscaping 23 Ornamental site amenities between $ 15,000 $15,000 amphitheater and community play strucntre (benches, picnic tables, trash receptacles, eta) 24 Pedestrian level lighting between $ 20,000 $ 20,000 amphitheater and community play structure (along walks, near bldg and play structure). 25 General planting and landscaping $ 25,000 $ 25,000 (seed/sod, etc) between amphitheater and community play structure. 26 Genual site preparation $100,000 $100,000 between multi-purpose building and Hwy. 3 - includes general removals, basic grading, basic utilities, etc. 27 Multi-purpose building near new 5145,000 $145,000 parking lot 28 Parking lot and entrance drive $170,000 $170,000 29 Asphalt trails between multi- $ 30,000 5 30,000 _ purpose building and Hwy. 3 30 Path lighting between multi- $40,000 $ 40,000 purpose building and Hwy.3 and parking lot lighting Erickson Community Square Park Area Cost Estimate (continued) Estimated Costs Phase I ` Phase II Phase III 1= Description (1991 dollars) (0 -5 vra-) (5 -lo vrs.l (10..15 Ks.) 31 Hockey rinks with fights (2) $ 70,000 -- - S701000 ` 32 Volleyball and horseshoe pits S 10,000 $ 10,000 33 large [roup picnic shelter near $ 50,000 $ 50,000 Hwy. 3 34 Park entrance feature $ 25,000 S25,000 25 General planting and landscaping $ 30,000 $ 30,000' (seed/sod, etc.) between multi- purpose building and Hwy. 3. i Total 51,752,000• S522,000 5560AM 5670,000 Plus contingency and professional services: $ 350,000 $104,000 5112,000 $134,000 (20%) Combined totak 52,102,000 5624000 672,000 58041000 Hwy. 3 Pedestrian Underpass Cost Estimate Estimated Costs Phase I Phase H Phase III jiggl Descriplion (1991 dollars) (0 -5 Ws.) (5 -10 W.) 1 Construction of a pedestrian S100,000- S100,000 - underpass under Hwy. 3. 150,000 5150,000 "(17 wide x 1(Y high min.) Note: The estimated cost associated with the construction of the pedestrian underpass is based on the assumption that it would be constructed in conjunction with the upgrading of the roadway. S. Robert Trail/Hwy. 3 Streetscaping Cost Estimate Estimated Costs Phase I Phase N Phase III ` I= Descri ion (1991 dollars) (0 -5 vis.) (5 -10 vis.) (IG -15 vis.) from 500000 , I Streetacaping program om down- S 5500 ,000- town to north of armory site - 5650.000 5650,000 including trails and sidewalks pedestrian and street fighting, site amenities, ornamental fence along cemetery, and plant materials and landscaping Note: Streetscaping estimate does not include costs directly associated with roadway work, including roadway paving, curb and gutter, general utilities, and general grading.