Loading...
HomeMy WebLinkAbout5.b. Receive Bids / Award Contract for Jaycee Park Phase II Grading.: _ It CITYOF ROSEMOUNT EXECUTIVE SUMMARY FOR ACTION CITY COUNCIL MEETING DATE SEPTEMBER 3, 1991 AGENDA ITEM: RECEIVE BIDS/AWARD CONTRACT.FOR AGENDA SECTION: - JAYCEE PARR PHASE II - GRADING OLD BUSINESS PREPARED BY: DAVID BECHTOLD AGENDITM 5 8" PARKS & RECREATION DIRECTOR I T1' ATTACHMENTS: PARK GRADING PLAN, APP VED BID TABULATION SHEET On Monday, August 19, 1991 bids for Park Project 91-9, City Project #233, Jaycee Park Phase II/Grading were received and read publicly. Five bids were received on the project. The individual firms are identified on the, attached bid tabulation sheet. The apparent low bidder is.Ryan Construction of Lakeville with a total cost of $37,500.00. The total construction cost is above the engineer's estimate of $30,000. This is due to the amount of field preparation work that is needed, grading and rock removal. The bid price is within 20 percent of the estimate which is based upon 1990 construction prices. The next two low bids were received from E. H. Earthmovers, Inc. at $38,040.00 and Central Landscaping at $39,390.00. The difference between the two lowest bids is $540.00. All bids were accompanied by a 5 percent bid bond as required in bid documents. There is no glaring informalities with any of the bid documents. Based upon the initial examination, it is staff's recommendation to make the award to the apparent low bidder. This recommendation will be amended at the meeting should any irregularities be discovered. Council approval request includes the $35,000 from account #202-24413 for grading. These funds were previously assigned towards the installation of soccer lighting in Jaycee Park in 1990. These were carried over for Jaycee Park expenditures. Because of the change in concept of that park the soccer lighting will not be installed at this time. The remaining balance of the $37,500.00 ($2,500) will come from Park Dedication Funds, that account is 205-49005-01-530. Amount Explanation of Work Account Used $35,000.00 Grading of Park 202-24413 2,500.00 Grading of Park 205-49005-01-530 RECOMMENDED ACTION: Motion to accept bids and award the contract for Jaycee Park Phase II/Grading, Park Project 91-9, City Project #223 to Ryan Construction in the amount of $37,500.00. COUNCIL ACTION: } 1 tt� ) .. �..w.. � •!Of ]lwl lw •l,•Cn )SO. .�...... u.w .. .w..... . ;�.. ...... �. r r� ._. mss.— _ .. ... _� ftt •P, i�)tb•. ail) aul '..,.iaYasD �� 1 r =' � v . Y.i • I S t .� . / �\ /7 I ` `l, I --W ry ol 16 N � • Y E '� I,li � r tn r 10 uno "- ' - I i + ' a loN�o sn� ueot wlu 9,�• a+��'� h a `�.• tt� ) Nom/ 1' r� ,�C I Orr Schen OAMS)& dates, int. August 22, 1991 Mr. Dave Bechtold Parks and Recreations Director City of Rosemount 2875 145th Street West Rosemount, MN 55068 ,. Re: Jaycee Park Phase U Grading City Project No. 223 Park Project No. 19-9 City of Rosemount, Minnesota OSM Project No. 4804.00 Dear Mr. Bechtold: 2021 East Hennepin Avenue Minneapolis, MN 55413 612-331-8660 FAX 331.3806 Engineers Architects Planners Surveyors At 11:30 a.m. on August 19, 1991 bids were received and opened on the referenced project. A total of five bids were received and the Bid Tabulation and Extension of Bid Prices is attacbed. The Engineer's Estimate was approximately $30,000 based on final plans and specifications dated August 6, 1991. The low bid from Ryan Contracting, Inc., was $37,500. Possible reasons for the higher bid price include rocky soil in the area and a tight specification for rock picking and removal, plus a tight specification for turf establishment or seeding. We recommend award of Project No. 223 to the low bidder, Ryan Contracting, Inc., in the amount of $37,500. We are enclosing the original bids for your files. Respectfully, ORR-SCHELEN-MAYERON & ASSOCIATES, INC. 4--C� 6�4� Bud Osmundson, P.E. Project Manager/Associate /cmw 0822cor.db Enclosure FOu.0 On�k-n!un�!v C-,nh:Cr BID TABULATION JAYCEE PARK PHASE II GRADING CITY PROJECT NO. 223 PARK PROJECT NO. 91-9 CITY OF ROSEMOUNT, MINNESOTA BIDS OPENED: August 19, 1991 ORR-SCHELEN-MA.YERON 11:30 a.m. & ASSOCIATES, INC. CONTRACTOR BID SECURITY TOTAL BID Ryan Contracting, Inc. 5% $37,500.00 E & H Earth Movers, Inc. 5% $38,040.00 Central Landscaping, Inc. 5% $39,390.00 Brown & Cris, Inc. 5% $47,375.00 F.M. Frattalone 5% $51,130.00 Engineer's Estimate $30,000 1 HEREBY CERTIFY THAI' THIS IS A TRUE AND CORRECT TABULATION OF THE BIDS AS RECEIVED ON: DATE: August 19. 1991 n ofii�tG�- BY• ��►�C Bud Osmundson, P.E. [=Denotes Corrected Figure OSM Comm. No. 4804.00 Jaycee Park Phage It Grading City Project No. 223 Park Project No. 91-9 Rosemount, Minnesota EXTENSION OF PRICES F.M. Frattelone E & H Earth Movers, Mo Ryan Contreictinp, Inc. Item No. Spec. No. Item Unit Quantity Unit Price Total Price Unit Price Total Price Unit Price Toted Price 1 2101.502 Clearing Tree 14 75.00 11050.00 ".50.00 700.00 25.00 350.00 2 2101.507 Grubbing Tree 14 45.00 630.00 $0.00 700.00 25.00 350.00 3 2t05.501 Oonvnon Excavation (plan quantity) C.Y. 15500 220 34,100.00 1.43 22.165.00 1.80 24,600.00 4 2573.503 Erosion Control - Silt Fence LF. 1500 Z60 3,900.00 1.50 2,250.00 1.00 1,500.00 5 2575.501 Seeding Acre 8 1.300.70 10,400.001 00 11,60000 1,25000 10,00040 6 2575.523 Fiber Blankets. Type Regular S.Y. 500 2.10 1,050.00 1.25 625.00 1.00 500.00 DRANO TOTAL BIO 51,130.00 36,040.00 37,500.00 jayoee Park Phase II Grading City Project No. 223 Park Project No. 91-9 Rosemount Minnesota EXTENSION OF PRICES Centra! Lendsoaping, Inc. Brown & 4019, int. ttern No. Spec. No. hem Unk Ouantity Unit Prioe Tote) Prios Unk Pdos Tote) P►ioe 1 2101.502 Clearing Tree /4 130.!10 1,820.00 100.00 1,400.00 2 2101.507 OnibUng Tree 14 130.00 1,820.00 loom 1,400.00 3 2105.501 Oommon EKoevetion (plan quan*h C.Y. 15500 1.60 24,x0000 1.35 20,925.00 4 2573.503 Erosion Control - SIR Ferwe L.F. 1500 2.00 3,000.00 3.00 4,500.00 5 2575.501 Seedeng Acre 8 900.00 7,20D.00 2,300.00 18,400.01) 6 2575.523 Fiber Bianketa, Type Regular S.Y. 50o 1.50 76000 1.50 750.00 GRAND TOTAL BID 39.390.00 47.375.00