Loading...
HomeMy WebLinkAbout5.b. Accept Bids for Valley Oak Pond OutletEXECUTIVE SUMMARY FOR ACTION CITY COUNCIL MEETING DATE: January 15, 1991 AGENDA ITEM: Receive Bids, Valley Oak Pond AGENDA SECTION: Outlet, Project #197 Old Business PREPARED BY: Richard M. Hefti AGENDA T °"1 City Engineer/Public Works Director •/ ATTACHMENTS: (1) bid tabulation VED Y: (1) resolution ;AP On January 4, 1991 we opened bids for Contract 1990-6, Vall y Oak Pond Outlet, Project #197. Attached is a bid tabulation of those results. As you can see, the lowest responsible bidder changes depending upon what alternative we choose. The lowest responsible base bid is about 16% under feasibility estimated cost and 25% under the engineers estimate. Applying an overhead factor to this would yield a project cost of $177,434, excluding easement costs. The individual assessment would then be about $445. Estimates for easement costs could add another $300, or more, to the assessment amount bringing the total cost to about $745. If alternate A is awarded with the base bid, then the estimated project costs would be approximately $185,004 for the base bid and $13,033 for the 20 lots around Pond 1, again excluding easement cost. Under this scenario, the individual assessment would be approximately $465 plus another $300 for easement acquisition bringing their estimated assessment to approximately $765. The lots around the pond would be charged an additional $652 bringing their total estimated assessment to approximately $1,417. Council should be aware that although the construction bid is under estimate, the contractor could encounter unforeseen conditions that would increase the cost. The bid is structured so we can wait until March 5, 1991 to find out if there is any outside funding assistance before we decide we want to proceed with Alternate A or if the property owners adjacent the pond bring in a petition, signed by the majority of them supporting construction and payment for the wet pond, by February 19, 1991. Apparently Ducks Unlimited is waiting for the next time their corporate sponsor has a board meeting to pursue possible funding for the wet pond. RECOMMENDED ACTION: Motion to adopt the resolution receiving bids for Valley Oak Pond Outlet, Project #197. COUNCIL ACTION: Adopted resolution. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Valley Oak Pond Outlet Bid Tabulations City Contract ##1990-6; City Project ##197 Bid opening : January 4, 1991 BIDDER Brown & Chris S.M. Hentges & Sons 0 & P Contracting DLR Excavating Danner, Inc Fredrickson Widmer, Inc Holst Excavating G.L. Contracting Stenger Excavating Richard Knutson Const Friedges Landscaping Dave Perkins Contracting Carl Bolander & Sons F.M. Frattalone Excav Engineer Est Feasibility Rpt Est BASE BID W/ ALTERN A BASE BID $129,988.00 $134,514.00 $135,534.90 $142,408.35 $142,626.00 $153,217.00 $160,170.00 $163,921.10 $164,810.80 $171,636.25 $178,444.00 $184,580.00 $185,421.00 $205,706.00 $211,107.50 $172,553.00 $155,000.00 (top 6 bidders) BIDDER BASE BID 1 S.M. Hentges & Sons $134,514.00 2 0 & P Contracting $135,534.00 3 Brown & Chris $129,988.00 4 DLR Excavating $142,408.35 5 Danner, Inc $142,626.00 6 Widmer, Inc $159,990.00 Engineer Est $1951790.50 Feasibility Rpt Est $190,000.00 BASE BID W/ ALTERN A + B (top 6 bidders) BIDDER 1 S.M. Hentges & Sons 2 O & P Contracting 3 DLR Excavating 4 Brown & Chris 5 Danner, Inc 6 Widmer, Inc Engineer Est Feasibility Rpt Est BASE BID $134,514.00 $135,534.90 $142,408.35 $129,988.00 $142,626.00 $160,170.00 $218,717.50 n/ a ALTERN. A $27,890.00 $10,741.90 $12,548.00 $18,604.90 $24,805.00 $23,513.00 $12,315.00 $26,538.90 $28,942.40 $24,640.50 $21,673.00 $23,885.00 $24,779.25 $24,577.00 $27,275.00 under est -24.67% -16.14% BASE BID+ ALTERN. A $145,255.90 $148,082.90 $157,878.00 $161,013.25 $167,431.00 $172,485.00 under est -25.81% -23.55% BASE BID+ ALTERN. A $145,255.90 $148,082.90 $161,013.25 $157,878.00 $167,431.00 $172,485.00 under est -27.43% n/ a ALTERN. B $14,849.00 $13,466.82 $13,979.30 $11,675.82 $16,741.00 $27,261.40 $13,041.50 $31,987.82 $20,455.25 $35,969.00 $28,942.50 $26,712.25 $27,211.00 $32,347.00 $31,521.00 BASE BID+A+ ALTERN. B $158,722.72 $162,062.20 $172,689.07 $172,727.00 $184,172.00 $185,526.50 CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 1991 - A RESOLUTION RECEIVING THE BIDS FOR VALLEY OAK POND OUTLET IMPROVEMENTS CITY PROJECT #197 BE IT RESOLVED, by the City Council of the City of Rosemount, Minnesota, as follows: 1. All bids on construction of Valley Oak Pond Outlet Improvements are hereby received and tabulated. ADOPTED this 15th day of January, 1991. ATTEST: Susan M. Johnson, City Clerk Motion by: Voted in favor: Voted against: Vernon J. Napper, Mayor Seconded by: