Loading...
HomeMy WebLinkAbout8.e. City Facility Study j Ii�M # � February 12, 1990 T0: Mayor Napper Council Members: Rlassen Oxborough Willcox Wippermann FROM: Stephan Jilk, City Administrator RE: City Facilities Study We are proceeding with the spacial needs study for city facilities, The Architectural firm of Boarman and Associates is completing the first phase of their work which is to assess and document all current facility uses and needs for current city staff and operations. Phase II wi11 be to evaluate future needs based upon expected community growth and associated staff and facility needs over the next ten years. Phase III will include the costing out of plans to meet those needs in terms of facilities, not only in amount but also location for now and in the future. Part of this process should include the involvem�nt of the Rosemount community in determining review, commentary and advice to the ci.ty staff and the consultant. A citizens' committee can provide specific input and direction, as well as new insight, for the staff and consultant to investigate as the process goes along. The community, through such a committee, can provide specific consensus and direction to this municipal facilities plan. As it should. This wi11 become the municipal facilities plan through at least the year 2005. Since anq recommendation for major improvement/construction coming from this plan will involve a referendum and an increase in taxes the community' s input is crucial in providing direction for the City of Rosemount. I would recommend the forming of such a committee at this time. This committee would: