Purpose:
The purpose of this policy is to provide a rational and equitabl,e
method of assessing abutting and benefited property to help finance
the reconstruction and resurfacing of local city streets.
Backqround•
Many of the city streets are approaching the end of their design life.
The Public Works Department has completed a Pavement Management System
for abo�t 30 miles of older streets. This consisted of taking an
inventory of the streets and rating their condition. Streets with a
rating of less than or equal to 8 . 0 (on a scale of 16=excellant and
1=poorj are candidates for complete reconstruction.
Unless a street was a county road that was built entirely with county
funds prior to 1980 and turned back to the city, then property along
a street would have paid for its construction. Payment would have been
made either of two ways. One way would have been through special
assessments, if the city contracted to construct a street. The other
way would have been with the purchase of a lot, if the developer
installed streets under a private contract.
Streets have service Iifes no different than vehicles or appliances,
so they also have to be replaced when they wear out. State 1aw allows
a 20 year life for bituminous surfaced streets. This is consistant
with the actual service life of a bituminous surfaced street, which by
industry standards is between 20 to 25 years. As a result, streets
meeting or exceeding the 20 year life that need to be reconstructed can
be financed using special assessments. In order to borrow money under
the special assessment sectior� of State law - Chapter 429 - the minimum
that must be assessed is 20% of the amount borrowed, Usually 25-30�
of the amount borrowed is assessed to insure meeting the 20� minimum
rule..
If streets need reconstruction prior to reaching their 20 year life
span, then we could prorate the assessable cost.
Rationale:
RECONSTRUCTION �
� ,t
(1) Assessable eosts for reconstruction would include � all
costs of reconstructing the local street to city standards.
c:\word\strasstl .pc�l
Local Street Reconstruction Assessment Policy
Page 2
RESURFACING & MISC. REPAIR
(1) Subgrade correction work shall be assessed because it should
have been done at the time of initial construction.
(2) 50� of the costs of miscellaneous preparatory work for the
overlay and 50% of the overlay cost shall be assessed.
(3) Pavement cut-outs shall be considered as maintenance and not
assessed.
(4) Replacement of sections of concrete curb & gutter shall be
considered as maintenance and not assessed.
summarv:
(1) Assessment Area
(a) The assessment area for local street reconstruction shall
include all property abutting and taking access on the
local street.
{1) Assessment rate determination.
{a) The assessment rate shall be based on a single family
residential equivalent unit as shown in the follawing
table:
- RES
Zonina Unit Units
,
SF detached (R-1,RR,RL) per platted lot 1
SF attached (R-2) per dwelling unit 1
MF residential (R-3 ,R-4) , per dwelling unit �
Commercial (C-1, C-2 , C-3 , C-4) per acre {2 . 5x25) b0
Industrial (I�, IP,w1�) per acre (2 . 5x2 . 5) 6
Institutional (PUB) per acre (2 . 5x3 .0) . g
For example, a development with 24 single family lots would have
24 RES units as would a development with 24 single family attached
units, such as four-plexes. However, a d'evelopment with a 48 unit
apartment building would receive 96 RES units. To determine RES
units for commercial zoned property containing l0 acres one would
multiply the 60 RES units/acre for commercial property by 10,
which would result in 600 RES units.
For agricultural zoned properties we would estimate the number of
c:\word\strasstl .pol
Locai Street Reconstruction Assessment Policy
Page 3
units per acre based on the Comprehensi�e Guide Plan's underlying
use.
Agricultural (R-1) per acre (2 . 5) 2 . 5
Agricultural (RR) per acre (5 ac min. } 0. 2
Agricultural (RR) per acre (10 ac. min. ) 0. 1
Agricultural (R-2) per acre (4 . 0) 4
Agricultural (R-3) per acre (6. 0) 6
Agricultural (R-4) per acre (10. 0) 10
For example, agriculturally zoned property with a Comprehensive
Guide Plan Use designated as Single Family detached will have its
RES units determined based on 2 . 5 units per acre. If the
underlying use is RR, then the RES units would be based on the
minimum lat size, which whauld be either 5 or 10 acres depending
upon the location.
(2) Funding for street reconstruction and resurfacing that cannot
be recovered through special assessments will have t4 come
from general city revenues (ad velorem taxes) . Alternatives
to the ad velorem tax would be an infrastructure tax, impact
fee, or user charge. Currently impact fess or user eharges
are not allowed by State law.
(3) Assessments for homesteaded residential or agricultural
property in amounts over $5, 000 shall be spread over 15
years, otherwise, the assessments shall be spread over 7
years.
,
�
c:\word\strasstl.pol
Local Street Reconstruction Assessm�nt Policy
Page 4
RESIDENTIAL EQUIVALENT TABLE
BASED ON TRIF GENERATION
BY DWELLING TYPE
Dwellincr Type Trips/DU DU Ac Trips,�Ac RES
Single Family 10 2 . 5 25 1. 0
Multi-family (R-2) 6 6 3b 1. 4
Apartments (R-3 ,R-4) 6 10 60 2 . 4
Commerical x x 620 24 .8
Industrial x x 60 2 .4
Institutional x x 74 3 .0
All numbers derived from Transbortation and Traffic Handbook, 2nd
Edition, by the Institute of Transportation Engineers.
According to the table single family dwelling types generate 25 trips
per acre, which for purposes of establishing RES units will equal 1.4.
The remaining RES numbers were obtained by dividing the TripsjA�re
number by 25. For the table in the policy text, these RES numbers were
rounded to the nearest whole number.
F
c: \word\strasstl.pol
Go�1?��Q�C' �tt'E-r� - Msfl :
r'#a `b?k�� c.o,C"C'�G�ion.
, EST'4 urazr Fj�S�55'T .
ITE��t Ut�IIT QI�a.T. F?R:I.GE Ht•1C�,Ut�j ����"�ii� f�S��S� CITY MSA
So�ls:,�Q�'x-ec.�i,c�n CY .' SQ:O: , ��'.�JI�� ��7.17t7 1 ��l,G4 �0.00 �O.OQ
8�.� P���� . SY ��J, �?.�0 .#�Q;�7�] � ��1,..�C►R : �0.00 �0.00
? Figg 8as�, . C,1 5 G`f 8�4 �9.OC� . :#�0:t��J 1 ��?,014. �O.OQ ; �O.OU
; 1-5'4 �.�� A�!�r 1 ay TN 1 S£�. �2Q..00t t�3,7E,i7.I�� �,� �l,��.P,t7Q �0.00 $1 880.OQ
: t�j�st��e�ts Efl 5` �15fJ.QCl �75Q.t]l� (�-a ��!?�,A�i �0.QO �375.01]
t�1i} �}C1�3, ��� SY 33.� :��1.5C► ��#yL�.SQ �1,�i,r ����,�`� $249,75 : �0.00
: P�I�1 �C ��Q�..��� SY E84 .�;#.t7C1 �G,?35,f�0 C( �.Q,Ql� ffi2,736.00 �0.00
; � F?err� � �.,'� � :C�,G LF 1AA �18.,Of] �1',�O.q-t�10 G �Q.CtU �0.00 �1,800.00
` SU� ,Tqj"�� �9 5 �5.5i
.�. .4 :_ � �� aGf�i,7'5 $2 965.75 �4,055.00 ,
: : 1Q: �Q�� �JS�,S� �2'�t7.4$ �298.58 , �405.50
' TATF1�-- �10�59Q:G5 . ��',a�'S�,23 $3,284.33 �4,460.SO
: cosT c���� AAl-�.�iR _ .
:�1�.26 �0.31 �0.�32 `
; � C�1����$t" S.s�t'e�� - NON—t•15fl '
; _ . ._ t•�o sA}�s. G4?!"t'���ion ` .
E5T'0 llt;aIT �jS�E�Sa T
ITEr•i UNIT QUFi�aY ` PRTCE fit10U•T
' . {. , , ,:,I� FFl�T��� ����ss ' clrY ri�H �
= S�ri�s .�P.1"4�e��iqn CY SAQ. �d.;00 .:" � 00 i q-qQ
��� Q����l Q•,.. . �1�.Gl� �0.00 �.
5Y SG.Q �7..50 . �p.�OQ i �A,l�4 �0.00 �.9rOl� ,
- ��9 c ��5�'? F� 5 CY 8r9; ' �9 OQ :. �Q.CIt7 1 �44,t�Q $0.00 ��1t 17.0
; 1,5" q��: 4����ay Tra ��8 ��o.'OCi �3 76Q.Q0 0.5 �X3��A.Qa �1,$80.00
' �A,.�A
A j ust{r�en�s - ER S �•150.,00. } '�,�7�0 d0 �.5 ���'S.�Q $375.00 �1�.�7�7
, tt}�l;tl�.;�3� S`l 3.�� � e;.�,1.�5C1 �4�J.Si] Q.5 �2'�#��?5 �249.75 �Qt.aQ
F'em &.RgQ� ��� SY 6�4 '.�4.,Op �2,736.QO 0, �A,QO �2,736,00 �A.:4.Q
Rem &.(2� � G,&G LF 1a�Q �18 OCt �1',BOO ,OiL] Q �QI..C1C7 �1,800.�0 ��?.q�
�3 .
SU�-7Q��!!- �9�.545.5Q �2�54��1,�� �7,04Q.75 ;��?.-<QQ
; - 10% C�nt `. �95�.55
; T4T�I�. � ��5�1,4a �704.08 �at QQ
; �10;500:,�5 �2.a 75�,�� �7,744.83 $,Q.,D.Q
t- t,. •
. . . : . .� .. . ..
: COST A�� DQL��R �11:2� $0.74 �.Q.l?4
; • �
;_. ; , ,
:
;
� , ' ' ,
,. ; . _
r. :
, � , , ;
COLLECTOR STREET RECONSTRUCTIO� A�SESSMENT COST ON DOL�AR
RECONSTRUCTION * * * ABSESS MSA CITY
CITY' COLLECTORS _
MSA _ $0.40 $0.60 $0. 00
NON-MSA $0.40 $Q. a0 : $0.fS0 _
C�U�TY COLLECTORS/ARTERIAIS
3 p -�v��" :
��zvzDED $o.�+rs Sa.oo �o..�
azvED�� ��.�S �o:..o°o° �o��...�'.'
RESUKE�CING &. NIISC".. *
C:IZ`Y' COI;LECTORS
MSA $0. 56 $0. 25 ; $0. 19 .
NON=MSA $0.56 $0. 00 $0.44
� �::. ; _
,....,. _
: _:
I,OCAL STREET RECONSTRUCTIO� ASST'�S�laI� CEOBT O1�' Da�T�AR
ASSESS MSA CITY
RECONSTRUCTION * * * $1.00 $0: 00
- $0. 00
RESURFACING & MISC. * $Q.56 $0. 00 $Q.44