HomeMy WebLinkAbout4.l. Set Public Hearing - Pine Bend Trail Improvements � � �
�*�`�`���������
�x*�`�`���������
�c*�`�`������
! ��������ME��
. �*�������,�.��x*
�*
�x
��x*�`�`����� 10 � 199� I�$ERS 3IT'� C� KEF�S
�x �; �Y & co�� ��2��pR RK5 DIR� og ��2Z�G
�P'� Z,�p,Y��CZ2`I ADM g p�BI,ZC W� o Co��CZL M
T�' 2,� .g�1GZ��� / Y 15 � 199
FR�M cS M F�R �x� � I�` ��vemert5 er �he
�: i�� ' Berd Tra11 to �Sol�,ti e fo�
g p lne ,�eaY 1''ate r e�e aat at
' ec� 19 9 p��l l appz o,�ettln� pz°�e�t
GE�DA Pr° e �oz is tne ena o.� 'tbis
CO�SEN2 A ��,ic xeaz 1� ttirq a Atta�W ov�la tne p cs Y�ea�lt��. atta�r e.�e'
5 et pv� lst o,� v ement aate. C rs id t�e p�pl op� tril Zmpr o
coY►5 S.�sc�p� aYiY'� als° e °f to aa d Tra
i� ite d Trall 11c Y'e we �c+a e °'�t°�m iae� 1 Yi,�e $e 4� 'Q.�`�
Pi�'�B g t 99p U5 a r °� tr �yl t° c� fo� �199� a� $•
set e 5 � 1 depe CoUY' heaYi'n��e 5 �
3�,r time� �or lic o�, 3
same ed a°ty nq a p Y�e �ela
Re�om�,tl°t� se#199 � to
zes°1 pro�ect
CitY
� � �
ITEM # �. L
****�**********�r*�r�t****************MEMO*************************�**********
DATE: MAY 10, 1990
T0: MAYOR & COUNCILMEMBERS
C/O CITY ADMINISTRATOR JILK
FROM: CITY ENGINEER/PUBLIC WORKS DIRECTOR HEFT
RE: ITEM FOR THE MAY 15, 1990 COUNCIL MEETING
CONSENT AGENDA
Receive Bids Contract 1990-1, Pine Bend Trail Improvements
Pro�ect #199
This item consist of analyzing the bids received and setting a new course
of action.
On April 27, 1990 we received bids for the Pine Bend Trail Street
Improvements for the existing paved portion of Pine Bend Trail from Highway
55 to C.F. Industries. Although the low bid was slightly higher than the
Engineers estimate, it was almost 49% higher than the feasibility report
estimate presented at the September 19 , 1989 public hearing. At that
hearing we estimated the assessable cost for this project to be $153 , 000
with the non-assessable cost being $32, 000. The non-assessable cost
included crack filling and miscellaneous patching. All other cost
including sub-grade correction, bituminous overlay, bituminous shoulders,
miscellaneous culvert work, etc. were considered as assessable cost.
Breaking that out of the bid reveals that the non-assessable cost would be
$65, 412 whiZe the assessable cost would be $209,929 for an increase of 104%
and 37% respectively. The non-assessable cost would come out of the street
core cost that is made up of excess MSA monies after State Aid projects
have been assessed. However, adding another $57 , 000 to this figure would
certainly adversely impact our funds. Especially since we proposed from
the start to assess all the assessable cost.
Because the feasibility report estimate apparently did not accurately
address the entire scope of the project, I would recommend that Council set
a new public hearing for this project to be held on June 5, 1990 and
continue consideration of this item until June 5. Depending on the outcome
of the public hearing, the Council can either reject or award the contract
because the bids are good until June 11, 1990. As long as we have
previously prepared the mailing list it will not pose any problems for us
from the time standpoint.
Recommended action for Council to consider is to continue receipt of
bids/award contract of Pine Bend Trail Improvements to the June 5, 1990
meeting.
CITY OF ROSEMOUNT
DAROTA COUNTY, MINNESOTA
RESOLUTION 1990 -
A RESOLUTION CALLING FOR A PUBLIC AEARING
PINE BEND TRAIL STREET IMPROVEMENTS
CITY PROJECT #199
WIiEREAS, the City Council received the feasibility report and found the
project feasible for Pine Bend Trail Street Improvements, City Project
#199, on the 19th day of September, 1989 ; and
WHEREAS, the statute provided that no such improvements shall be made
until the Council has held a public hearing on such improvements
following mailed notice and two publications thereof in the official
newspaper stating time and place of the hearing, the general nature of
the improvement, the estimated costs thereof, and the area proposed to
be assessed, in accordance with the law; and
NOW THEREFORE, BE IT RESOLVED by the City Council of the City of
Rosemount, Minnesota, as follows:
l. A public hearing will be held at the time and place set forth
in the Notice of Hearing attached hereto as Exhibit A to consider said
proposed improvements.
2 . The nature of the improvements, the estimated cost of each
major portion thereof, and the areas proposed to be assessed therefor
are described in the form of Notice of Hearing hereto attached.
3 . The notice of said public hearing shall be in substantially the
form contained in the notice hereto attached.
4 . The City Clerk is hereby authorized and directed to cause
notice of said hearing to be given two publications in the official
newspaper. Said publications shall be one week apart, and at least
three days shall elapse between the last publication and the hearing.
Not less than ten days before the hearing the Clerk shall mail notice
of the hearing to the owner of each parcel of land within the area
proposed to be assessed as described in the notice. For the purpose of
giving such mailed notice, owners shall be those shown to be such on the
records of the County Auditor or, if the tax statements in the County
are mailed by the County Treasurer, on the records of the County
Treasurer. As to properties not listed on the records of the County
Auditor or the County Treasurer, the Clerk shall ascertain such
ownership by any practicable means and give mailed notice to such
owners.
. , �
(nV 1 P.O. BOX 510
✓il"�,( � 2875-145TH ST. W.
osernoun� ROSEMOUNT MINNESOTA 55068
612-423-441 1
CITY OF ROSEMOUNT
DAROTA COIINTY, MINNESOTA
PUBLIC NOTICE
NOTICE OF PUBLIC HEARING ON IMPROVEMENTS
PINE BEND TRAIL STREET IMPROVEMENTS
PROJECT NO. 199
TO WHOM IT MAY CONCERN:
NOTICE IS HEREBY GIVEN, that the City Council of the City of
Rosemount, Minnesota, will meet at 8 : 00 o'clock p.m. or as soon
thereafter as possible, Tuesday, June 5, 1990, in the Council
Chambers of the City Hall, 2875 145th Street West, to consider the
following improvements:
Project #199 - Pine Bend Trail Street Improvements
The total estimated cost of said improvements is $330,400.
The amount to be assessed is estimated to not exceed $330, 400.
The area proposed to be assessed for the foregoing improvements
would generally be all that area generally described adjacent to
Pine Bend Trail located in the south half of Section 18 and also
in the north halves of Sections 19 and 20, Township 115, Range 18,
Dakota County, Minnesota. The westerly project terminus is located
at the intersection of Pine Bend Trail and S.T.H. 55 in the
southwest quarter of Section 18. From this point, the project
extends approximately 1. 5 miles easterly and terminates at the
Chicago and North Western Railroad crossing located adjacent to
C.F. Industries in the north half of Section 20.
Such person as desires to be heard with reference to the proposed
improvements will be heard at this meeting. Written or oral
opinions will be considered.
Dated this 15th day of May, 1990.
BY ORDER OF THE CITY COUNCIL.
Susan M. Johnson
City Clerk
City of Rosemount
Dakota County, Minnesota