Loading...
HomeMy WebLinkAbout4.j. Approve Additional Cost for Electrical Work / Shannon Park Control Building ly ) f'� f;(�� `''(, �I j � 2875 ld>11�1 � T W � �'�� �� � `� /'�a' RO`,�EMOUNT. MiNFJC�p1A ,�;[)E;B ` ` 'VcJ�/0`GIIVL�� 61? �1?3-�#�il \.i T0: Mayor / City Council � X Stephan Jilk — City Adminis�.rator � � FROM: David J. Bechtold - Director of Parks & Recreation � , , • DATE; March 16, 1990 RE: Shannon Park Electrical Installation Cost Increase This memo serves as request to expend funds to cover change items related to the irrigation pro�ect of Shannon Park. The larger transformer instalied to supply power to the park was selected in the park planning to allow for future lighting systems to the ball fields. That over sizing of the transformer was failed to be con�idered when the estimates were requested for the irrigation electrical installation. A transformer will be required to be installed in the control building �o reduce the power supply to the irri�ation control system. Labor and material increases total approximately $ 1,200.00. The original cost estimate for the project was $ 2,161.00. Council approval is requested for funds from account �6 22I — 4800 — 3404 for an amount not to exceed $ 1,200 to cover additional costs for the electrical control system installation for the Shannon Park irrigation pro3ect.