HomeMy WebLinkAbout4.l. Receive Petition/Order Feasibility Report - Shannon Hills 2nd Addition � _, ITEM # �+ C,
�**�********�x***�r***�***�r�r*********MEMO*******�c******�r*********�r********�t*�r
DATE: JUNE 28, 1990
TO: MAYOR & COUNCILMEMBERS
C/O CITY ADMINISTRATOR JILK
FROM: CITY ENGINEER/PUBLIC WORKS DIRECTOR HEFT
RE: ITEM FOR THE JULY 3, 1990 COUNCIL MEETING
CONSENT AGENDA
Receive PetitionfOrder Feasibility Report-Shannon Hills 2nd Addition
City Project #216
This item consist of Council adopting the attached resolution that receives
the petition for public improvements and orders the preparation of the
feasibility report for those public improvements. This memo will verify the
authenticity of the petition and recommend action for Council to take.
We have reviewed the County tax records to find that Ground Development, Inc.
is the soul owner of the property that will develop as the Shannon Hills 2nd
Addition. Therefore, this petition does represent 1000 of the effected
property owners. Although the 100o petition does not require by law the
conducting of a public hearing, are Bond Council racommends holding such a
hearing to be on the safe side. What this petition does allow the City to
do is to allow our Consultant to prepare plans and specifications at the same
time they are preparing the feasibility report. This allows us to have the
plans and specifications prepared at the time of the public hearing in order
to speed up the public process. Without the 100% petition, we would have to
wait until after the public hearing in order for Council to approve the
preparation of plans and specifications. Once we have received the
feasibility report, we wi11 have the appropriate resolutions for Council to
consider to order the preparations of plans and specifications. Then these
will be done by the time the public hearing is held and Council can authorize
going out for bids after the public hearing.
Recommended action for Council to consider is to adopt the attached
resolution, receiving the petition and ordering the preparation af the
feasibility report for Shannon Hills 2nd Additian Street & Utiiity
Improvements, City Project #216.
CITY OF ROSEMOUNT
DAROTA COIINTY� MINNESOTA
RESOLIITION 1990 -
A RESOLUTION RECEIVING PETITION AND ORDERING
THE FEASIBILITY REPORT FOR
SHANNON HILLS 2ND ADDITION STREET & IITILITY IMPROVEMENTS
CITY PROJECT # 216
AFiEREAS, the City Council of the City of Rosemount has xeceived a
petition from the developer and property owners of the proposed
Shannon Hills 2nd Addition Street & Utility Improvements, City
Project #216.
NOW THEREFORE BE IT RESOLVED, by the City Council of the City of
Rosemount as follows:
(1) the aforesaid petition represents 100% of the owners of
the affected property;
(2) the property owners request in the petition that the
improvements be constructed and that the entire cost for their
share less the City's share of the cost of the improvement be
assessed against the property;
;;
(3) the aforesaid petition is approved and placed on file;
and
(4) the City Engineer is directed to have the necessary
feasibility report prepared for Shannon Hills 2nd Addition
Street & Utility Improvements, City Project #216.
ADOPTED this 3rd day of July, 1990.
Vernon J. Napper, Mayor
ATTEST:
Susan M. Johnson, City Clerk
Motion by: Seconded by:
Voted in favor•
Voted against•
� City of Rosemount , MN TEL No .O Jun .21 ,90 11 =00 P .02
� � Pro� M 2-� �.
CITY OF ROSEMOUNT
� PETITION FOR LOCAL IMPROVEMENTS
(100X Petition)
To the City Council of Rosemount, Minnesota:
4�e, the undersigned, beinq the owners of all the real property
gally described as follows:
���('�✓v���'� ����\S L.J�:.� \�j�� � ��'r ���: >�i��--_ ��'�`'� �t��`
�1
� \o � � � � ��� - � �
hereby petition the city council to undertake Kithout a public
hearing under Minnesota Statutes, Section 429.031 , the foll�wing
improvements to such property and aqree to pay for al.l cost�a for
the preparation of the feasibility repart far these improvements
in the event th� improvementa are not ordered in:
,� Sanitary Sewer T' ilalkNays
l" Watermain � Streets
� Storni SeHer � Curb & Gutter
� Stre�tliqhts � Other
and to pay the entire asseseable costs thereof aqainst our
property encompassing or abutting said improvements based on �
benefits received Without regard to cash valuation .
i nature of Owner(s) � �ddress Date
�,,-�,,._'�. nrs���..�> .`�r��. \'S�O ���e��. �Q-Se�y�� '�7 2�`�IO
� 1 . n,...
'�,e'�5,�Y+�.,._• �`(�t,
2 .
3 .
4 __.._ — .
We also agree to quaranty payment for the preparation of plans
and specificationa for the above petitioned improvements in order
that the plans and specifications may be prepared simultaneously
Kith the feasibility repart.
For City Uae Only
Date Rec'd • � �� By : ` To Councilt � 3
* Property oWned in �oint tenancy shonld be siqned by each owner .
1 Q/B$
_ot Summary
'�"��..nti•r-x. _� - � '_' , 1-. . .... • ' ' 7]9� , ' .. . .I ' "._L '. ' ' _ . .`""' . � 'i .
uJ . .. - . • � .
� - __ "�-_-p�' y'O -. : � �� " � �t , {� -_Di - �
�. It.VT� II.�T] 11.� 11, �I .�7! Il.a 11,� I1,� � Il.al� :.6gr
_ =� "�"'�`_ a �\'� �� s:. . �. - n i
--�_-��- ia '���,eec': .�x.e6: sT za y"� � ` t Z 3 5 6 7 B 9 J �' • ,•
'm�.�c -a�.n \I�`, �r. c
Q�_p � ' ��'_` �'T _ �� �, . � _ rm �:�T V'�.r�R. -}-' 2y lb�
g. '-_a:, `J�'ft-a._or -- -- . . '".__• ` . . • .
_��t��� ---- -- � - '�''� O, 2zb ,. _ . _ " _-�', ' _�-w .
' � �Q �`z3 ___ � �:.,x � � ..� -�' ��:�- � - � �m' ` �r_ �,.�' �y\�
i=- _-- -,' �__ `j�c �� 1 i ~ " : - , - _- ---- _; — icex -�r3"."'� /� V�(� � 'o�S
.2� S� �Rem^ rx.sn •S .�. W ��r���;k ' . _'S•t�
-- - � c v , ' ' '�.�-! ---�,. ' _ __ > 1
v\ 25 wsxo � ;ro.ow iomo �r 2.� �I Q 2g� t �
• • . ��. � a. .�O�SOC 1� ' S � il• IN � i!• ��' w�.� ' .
.� �S Z7' . �pJ1pp S �L'!O ' .o. )� � w' � �
5 p\ 3 iqo�o io.o 41 ' - � 25 _ '
� 28 ��7 a ��� - 21 �: 1 6 M�° ; �
�' � � ' '�� �.»� 2C �� �,. q. v".""" �, .
3[ ,3Q- '- / 5 ` �.
. �,� - _.r it�ro . � n�c, � J9 .i �4'a.oso. � o _ '_ - � w.mo .�o.osc 24 _ C� '
' 12.I10� i� � � � ------�--' . � - _ +Jg n,�sx*'' . �
�ysis WB 1 �' ' -� �.� ' _ , . �,
�N.10] ' � � �q.�" _ ",, e
_� � . .��-, 17 . .�• . - , '. � U • U.OS . _' . . , . _ .
iz.vY,. .S' � ��O 5 wvro�. '-` 2 � � . io.000�..,r `P .
��,iso�. . � 16 .�.�-�``0� 12 o U �e. `� _ �• �, �._,,• '�' _'.0 jf .,17 it000- , i
��' � �. �.._ - �15 n � . . � `C� VI t , ... . ' _o�_ _ ,- . b2)o . / !1' �. ' . r. .
��Zreo ��_ ..�' -,a�a - ��•"*G� � 6 ix.n�- -- _ -� - � / . , , � ;
.qs:�. � 'i �1.3�� � -- '"- _ 18 .
�+ , ' ' Q --- �x.•oo �'�� ��� � i
_�,�. rJ 14� � �++,� 19- �aion. �! � n�o - , _ w, U � ,
� �j � / _o�__ :, . � , a. _ ,�.,,� - _ =s- s - . Rz �i�
� J y+,-oc_� u,T�� �� ( .. . �y��- • iM.Tz_�� . ' 7 - - 3 �-34'� � , t� 18 � ,.,. �
-wa _� `� _ �`- 12.1001 r'71C ���// '' O'�� '.�' ,"' X_ )OaqS � �
I .�7!1��, , c MyS) . \. / ` 't Ktro �
. —- „'�r � J�020�.. � �, ./�7: 1 '�5,950�_ 2�,12C� __ ' `� � `4 .
21. H�4�0 F� `�
` ,�_ _=`` � ' . . . � . ` �B _ — ' p2Y��' � � 7 .
\��m' `"� � \v.p:p' i� �.�T'�r� w ` Q':� ii.�ro '
� :� 19
. ..5rp� __�12 ' - �,� i � �� , � � . t •. U,sr • i'� Lh. �� +r. � Ib�.� � m .
_ u.u.� �J .6 �.,• ��a�rc � .;'S` O -'_- _ \ in.sae �.J 21 S' ��f' ' � m
� � ----• �
� �`S �� � � ���. .9 . l..18' . ��w�a°c / �a.�w . y
�(a�r i r •'s � ` xano i I'n.x,� �r'! p .� - ' �
;�
6� lli�r� � y�`� ., _� `���y�,'.�C: IS __ �� ' 17 � , .22� �` 235.�+ � � (A
�' �' t6 .� `S •.�•' u �s.sx �v y
—uk- _ _" i.il' �s ,••- '\ -_ 'a4ew _ tn " ro,pss
u ,r IO . �'�'• �� .is.'»s i - . � r....i1.�ao � : 24 �U � � �
_�� �7 `�-q., �2.iu � .`� ��'�7 - .�`�\11 - 16�� --- - �`I �'
' �T '.8 -:� 9 :� ���r� . � ' � � y5 i-� . ., •� ,� � .•�� . ..
�z.esa n,�+o, u.om � ��t3 S ` � �y �., ? �' ,' �y _
t �J� :r � � •25 1 U,
-� ' n. �� ',..t+� �.- ,� '� i 'Lp_ _ ��" ,�� •:a�ie �ri.�oo . �e�na�o - 1 '
�./� �B'. .c '��t.rx ' � NS U. �� _''t-� ' �a,�so
�°_ -•��o „�'�� . .�`'27 3' i 2 q,�e , iro[.�+ 19 ,. 1 \ .g ` �.t'v = 26 .` � .
� _ -£6� �^ It�t(o ;�\7 r�' - tz.r�' �'' .' ' �. (��.-�' w.N�.,,
��� 'i; C�`�� -" � �' . � C° • �,zl . !� 13 u.wo s2J+o 14�C�,` 28u.fo�o"C'+e7sr �
` -(1�7C ` �( .., .
j: �:S .� �� +6.7Tl� i \7 , . . . . '
����� II.F% +.\t1.�M S S ��1 �� 1.. ��A � '�" ' " _ ' ' ' " " ' ' s . � .
'�. \ ITlOfiCtf 11aJ ,�, .ri' -=___'_�_ __�,.- ..�. . _-, J�_p�y-- ,_ .,._ ' _ . . .
. � � � � . :1=��"' � -- ----Shannon-Par4�wey—�-- -�---- � -
—- ) _ _ r- _ ,J������'-�`�,!�,- � =� �-. -`:---ti �-'----' - -- _ -- - t'-'_ -.ts -- ,
. . . �' �' :� , ' ���---:_..�'-_�..--.�,..i_.�-�,__.,--..����.._._ _.�-"�--^-�-':._c3'r'_rr -___=r�''_ .� -. . . .
� . � --- -=_=- ` ' • ��`�•� ..._ .�-�.— •--'-. -``�... -.:�^w-=-. __� � _ � . . - . I
. -`_ � , . . •• t`.� . . . . . � '--- . L � t � . .
. _ _ j i
:i = LOT WIDTN AT STANDARD` U=LOT WIDTH UNDER STANDARD� �
� ,
0
�
,..
�
City of Rosemount
M E M O
T0: Mayor & Councilmembers, c/o Administrator Jil
FROM: Public Works Director/City Engineer Hefti
DATE: July 3, 1990
SUBJ: Item 4.1. Receive PetitionjOrder Feasibility Report for
Shannon Hills 2nd Addition
The petition the developer submitted included 40 lots as per the
sketch he attached. This memo is basically to inform Council that
the developer, through the PUD Agreement, is to include the outlot
for park dedictation with his second phase. Therefore, I will
instruct our consultants to include extending utilities and streets
up to that outlot. This would add 2 lots to the total the
developer requested in the petition.
If in the course of the public improvement hearing it appears to
be not appropriate to extend utilities and streets up to the park
outlot at this time, then we can cut back to the original 40 lots
then.