August 3, 1990 �=E� � �
; � �
T0: Mayor Napper
Council Members : Klassen
Oxborough
Willcox
Wippermann
FROM: Stephan Jilk, City Administrator
RE: Parks & Open Space Consulting Servic s
Per your approval and direction city staff advertised for and
received proposals to complete planning and design for a large
area of property including the armory' site, Erickson Park and the
commercial properties between ,these sites and abutting Highway 3 .
A copy of the RFP (Request For Proposal) was approved by council
prior to the advertising of this project.
Six firms submitted proposals for this project. Following
receipt of those proposals a committee made up as follows to
review the proposals, pick firms to interview, and finally to
choose a firm to recommend to the council for hiring to complete
the work:
Steve Jilk - City Administrator
Dave Bechtold - Parks & Recreation Director
Sheila Klassen - City Council Member, Town Green Comm.
Tom Re11or - Parks & Recreation Committee Member
Mike tidozniak - City Planner
The Committee held interview with three firms :
Brauer & Associates
LSA Design
Sanders & Associates
From those three firms the firm of Brauer and Associates was
chosen and references were checked by Mike G7ozniak. A copy of
those references is attached for your consideration.
Parks & Open Space
Page 2
Based upon the consultants proposal, the interview held and the
dollar cost of the proposal the Parks and Open Space interview
committee recommends that the City Council award the contract to
Brauer and Associates of Eden Prairie, Minnesota in the amount
not to exceed $18, 290 for the Parks and Open Space Planning and
Design as referenced by the RFP for that project .
This project was not a budgeted project for 1990. I would
recommend that based upon the significance of need to develop a
master plan for the areas defined in the RFP we should consider
proceeding with this project and fund the project out of General
Fund Reserves.
lj
C�nj P.O. BOX 510
11� 0 2875-145TH ST. W.
O�Q,�n O,u�� ROSEMOUNT. MINNESOTA 55068
G/r�� 612-423-4411
TO: STEPHAN JILR, CITY ADMINISTRATOR & TOWN SQUARE PROJECT
PLANNING REVIEW COMMITTEE
FROM: MICHAEL WOZNIAR, AICP, CITY PLANNER
DATE: JIILY 26, 1990
SUBJ: REFERENCE CHECRS FOR BRAIIER & ASSOCIATES� LTD.
Sandra Welsh, Project Landscape Architect, Minneapolis Park Board
Ms. Welsh informed me that the City has been very satisfied with
the work af Brauer & Associates. She specified that the
Minneapolis Park Board has mainly used Brauer to prepare
construction design details rather than overall park planning
concepts. She noted that the personalities of Jeff Schoenbauer and
George Watson made them very comfortable to work with.
Eric Blank, Director of Parks and Recreation, City of Plymouth
Mr. Blank informed that he has had a twenty year working
relationship with Brauer & Associates and would rank them as one
of the top firms in the region for Park and Open Space Planning
Projects. He noted that Plymouth is currently engaged in 2 .5
million dollars worth of park construction work and that Brauer
will doing much of the City's planning and design work. Mr. Blank
suggested he has worked extensively with George Watson and has been
very pleased with Mr. Watson's responsiveness to his concerns as
Park and Recreation Director.
Merle Gamm, Eden Prairie ISD #272, �
out on Vacation
Rick Jacobson, Director of Parks & Recreation, City of Golden
Valley.
Expressed complete satisfaction with the work of Brauer &
Associates. Brauer has handled both park master planning project
and detailed design work for Golden Valley. Mr. Jacobson mentioned
having worked extensively with Jeff Schoenbauer and to a lesser
extent with George Watson. Specifically mentioned that Brauer does
a good job in working within budget.
Bruce Anderson, Park & Recreation Director, Inver Grove Heights.
Mr. Anderson is extremely satisfied with a recent Parks and Open
Space Master Plan produced by Brauer and Associates for Inver Grove
Heights.
, T
Sy Knapp, Public Works Director, City of Brooklyn Center.
Very satisfied with both Park Master Planning and detailed design
work of Brauer and Associates. Mr. Knapp mentioned in particular
the exceptional creative design ability of Paul Fjare (Senior
Project Advisor) . Mr. Knapp did note that they have had a slight
problem with designs done by Brauer coming �n over budget. However
they were so pleased with the design work that they proceeded with
construction anyway. He noted that George Watson has a good handle
on project costs and his involvement in the project should counter
Paul Fjare' s tendency to get carried away with innovative ideas
that may tax the future construction budget.