Loading...
HomeMy WebLinkAbout4.l. Receive Costs / Order Preparation of Assessment Roll, West Ridge 3rd Addition, City Project #195 . � ITEM # �+ L *****�x*********************�*******MEMO**************************�r*******�* DATE: AUGUST 16, 1990 � TO: MAYOR NAPPER COUNCILMEMBERS: KLASSEN OXBOROUGH WILLCOX WIPPERMANN CITY ADMINISTRATOR JILK FROM: CITY ENGINEER/PUBLIC WORKS DIRECTOR HEFTI � RE: ITEM FOR AUGUST 21, 1990 COUNCIL MEETING CONSENT AGENDA Receive Costs/Order Preparation of Assessment Roll West Ridae 3rd Addition, City Pro�ect 195 This item consist of receiving the total project cost for public improvements within the West Ridge 3rd Addition, City Project 195 and ordering Staff to prepare the assessment roll far this project. Attached is a copy of the cost breakdown including construction and all associated overhead cost. Dividing this by the 41 platted lots results in an assessment per lot of $10,451.03 . The feasibility report estimate per lot was $11, 073 . Upon Staffs completion of the assessment roll we will bring it back to Council for setting an assessment hearing date. Recommended action for Council to consider is to adopt the attached resolution receiving cost and ordering preparation of assessment rolls for West Ridge 3rd Addition Improvements, City Project 195. � Pr-o j ect t�lame: 4JE5TR I DGE 9rd NCJC�D I T I Dt•� Project #: 195 Cantra�t #: 89-2 COST PROJECT CQh1PGt^IEt�IT DESCRIPTIGM GOST FROFE�SIONNL LE�RL D.Si 2.0 "/. FRCTDR C�N5TRUCT I OM Et�IG I NEER I t�IG SERV I CE5 t_EGflL t�IQT I CES BOr�ll] FlDPi I N. SAhaI TFIRY rORE 0.�59 �19,�88.00 �4,�41.55 �;83.53 �d0.69 �22.33 �96.�4 �38?.76 LFiTERRL G, 168 �55,032.90 �1�, 1?5.r�4 �1,656.36 �1�@.21 �63.38 �2'�5. 16 �1, 100.66 tJFiTERhiFiIM CURE 0.U00 �0.00 �0.Ot7 �0.CIO �C1.Gt7 �0.00 �0.0� LRTERRL �. 162 �52,934.20 �12,672.61 �1,59�. 19 �1��.9� $60.�7 �264.67 �1,058.68 STORt1 C�RE p.031 �10,08S.Ob �2,414.38 . �303.53 �25.3� �11.62 �50.-0�3 �201.70 LHTERRL 0.Z88 �94,41'�.90 �22,6i74.�1 ��,B41.fi1 �237. 19 �108.�'5 ���2.1� �1,1�88.�0 STREET . h15A O.00a �p.0�] �0.00 ' ��.OU �Q.00 �0.00 �O.oa ��.UO LRTERflL 0.2'92 �95,535.08 �c2,k371.39 �2,875.97 �2.�9.94 �110.03 ��7r�.6$ �1,910.70 STkE�T L I GHTS O.OdO �O.�l7 �Cl.0� �0.00 �0.00 �O,Ol7 �0.00 �O.00t 70TAL 1.000 �327,395.08 �78,379.�9 �9,853.E�D �822.25 �3??.�� �1,6�6.98 �6,5�#7.90 TOTaL OVERHERD �1�3,48?.28 % OF OVERHEfiO 43.89% :! OF Et�6I MEER I MG 23.94:; Pt�ELIMIMR�Y C05T �49�,OfjU.O►� r y Pro j ect IVame: tJESTR I D�E 3rd f�Q00I T I Ot�l Praj�ct #: 1y5 Contract #: 8�3-� PROJECT TEt•1Pt]RR�!1' DESCRIP7IGhJ CO�T CRPI7. FUhiDIMG RIGHT- FRCTOR Ir�TEREST COST GF-WFiY CONTIr�GEh�CIES TOTAL SRNITRRY CaRE 0.059 �2,581.95 �15.9� �0.00 �118.4�4 ��7,Ei�5. 17 LFITERRL 0. 168 �7,328.B7 ��4�5.�r �0.Oq �336. 1'� �79, 152. 1d GJRTERPiR I f�l CORE 0.OOCI �1�.00 �C�,Gt� �Q.00 �a.CtIJ �q.OQ LRTE�RL 0. 162 �7,049.38 �4�,E4 �C�.OC1 �3�3.37 �?t�, 133.�5 STORM roRE 0.031 �1,3�3.D4 �8.31 �0.00 �61.61 �i�i,v0�4.95 LRTERRL 0.288 �12,57�4. 13 �7?.84� �O.OG �57'6.79 �13�,El(J1.26 STREET hiSR U.O�G �D.0� �CJ.GCl �0.00 �0.OC� �U.00 LRTEF�RL fJ.29Z �12,�22.64 �?F.7E� �O.CJO ��89.61 �13?,405. 19 STF.EET LIGHTS 0.aoo �o.Q0 �O.C�C� �0.DO �Ci,00 �0.DO TOTRL 1.C1flQ �43,600.C10 �269.qG �C1.GO ��,DOG.I��1 �47q,882.36 Less 5anitary Core �2?,E185. 17 Less 4Jatermain Care �0.0� Less 5t.orm Sewer Core �1�#,504.9S Le�s t•15A Fund �0.00 Tatal Ass�ssm�nt. Rmount �428,492.24 Units to be Fi�sess�d 41 , Assessment p�r unit �10,451.03 R . CITY OF ROSEMOIINT � DAROTA COIINTY, MINNESOTA � , � RESOLIITION 1990 - A RESOLUTION DECLARING COST TO BE ASSESSED AND ORDERING PREPARATION OF PROPOSED ASSESSMENT WEST RIDGE 3RD ADDITION STREBT & UTILITY IMPROPEMENTS CITY PROJECT #195 WHEREAS, a contract has been let for West Ridge 3rd Addition Street & Utility Improvements and the contract price for such improvement is $327, 395. 08 and the expenses incurred or to be incurred in the making of such improvement amount to $143,487.28 so that the total cost of the improvement will be $470,882 .36. NOW, THEREFORE, BE IT RESOLVED by the City Council of Rosemount Minnesota: 1. The portion of the cost of such improvement to be paid by the City is hereby declared to be $42, 390.12, and the portion of the cost to be assessed against benefited property owners is declared to be $428,492.24. � 2. The City Clerk, with the assistance of the City Engineer shall � forthwith calculate the proper amount to be specially assessed � for such improvement against every assessable lot, piece or parcel of land within the district affected, without regard to cash valuation, as provided by law, and she shall file a copy of such proposed assessment in her office for public inspection; and 3 . The City Clerk shall, upon the completion of such proposed assessment, notify the Council thereof. ADOPTED this 21st day of August, 1990. Vernon J. Napper, Mayor ATTEST: Susan M. Johnson, City Clerk Motion by: Seconded by: � Voted in favor• � ' Voted against•