HomeMy WebLinkAbout4.m. Approve Pay Estimate #1, Pine Bend Trail Reconstruction �- � ��M # �. �
� � � ; � �
' CITY OF ROSEMOUNT
APPLICATION FOR PAYMENT
NO. _�
CITY PROJECT N0: ,�9LI SEH FILE NO: g�oZ`7 3
PROJECT: _ P!lYE F„3�M/) T2A-1t- R�CON ST12vG-T7at�
CONTRACTOR: �C� $L,��KT'pP� ��/G• CONTRACT DATE: "�f f.Z�'�90
7.250 DIGKiNAN TR�-jG APPLZCATION DATE: $/ g /90
SN✓f.�Ga20VE IG/F/�.�,NTS FOR PERIOD ENDING: $l q / 90
/�/�v�YESax'A SSS'o 7�
Total Contract Amount $ 2?S�341. �3 Total Amount Earned $ �4.;�,?3�.¢¢�
,---
Material Suitably Stored on Site,
� Not Incorporated into Work . $ '
Contract Change Order No. � Percent Complete $ �Nc.t.u�fD ABav�.�
Contract Change Order No. Percent Complete $
Contract Change Order No. Percent Complete $
GROSS AM4UNT DUE . . . . . . . . . . . . . . . . . . . . . . $_ I�EaZ,eZ�,�-*�'
LESS S $ RETAINAGE . . . . . . . . . . . . . . . . . . . $ �,/;II • �3
AMOUNT DUE TO DATE . . . . . . . . . . . . . . . . . . . $ I3S I��•SJ
LESS PREVIOUS APPLICATIONS . . . . . . . . . . . . $ �"�
AMOUNT DUE THZS APPLICATION . . . . . . . . . . . $ 13S�I�0.$I
O .
.c � `
` � ����
ichard M. ,
City Enginee ' ector of Public Works
� � � � � � �� � �
APPLICATION FOR PAYMENT
------------------------- SHORT EL!{OTT N3wiy�RiCKSOi�J, INi..
(UNIT PRICE CONTRACT)
A►1� 1� 1990
NO. 1
------- �Ty ����
JER: ROSEMOUNT, MINNESOTA OWNER' S PROJECT N0. 199
ENGINEER' S PROJECT N�. 89273
---------------
�ATION: PINE BEND TRAIL
vTRACTOR ACE BI.�CKTQP INC. CONTRACT DATE '7l�S� q4
------------------------------- - ---------------------
7280 DICKMAN TRAIL CONTRACT AMOUNT $275,341. 63
--- ----------------------
INVER GROVE HEIGHTS,MN 55076
VTR. FOR PINE BEND TRAIL STREET RECONSTRUCTION - ROSEMOUNT, MINNESOTA
----------------------------------------------------
?LIC.DATE �� 9 � 9p
----------
3IOD END.
---$��1-90-----------
APPLICATION FOR PAYMENT
CONTRACT QUANTITY UNIT
DESCRIPTION UNIT QUANTITY TO DATE PRICE TOTAL
---------------L.S. ---------------------------------------
z1. 501 MOBILIZATION 1 0.85 10000.00 8500.00
:.01.501 CLEARING ACRE 0. 25 675.00 $
'01. 506 GRUBBING ACRE 0 675.00 $
�4. 501 REMOVE CULVERTS L.F. 40 6.00 $
�4. 509 REMOVE RAILROAD CROSSING EACH 1 1 200.00 200.00
.05. 501 COMMON EXCAVATION C.Y. 60 52 10.30 535. 60
_05.507 SUBGRADE EXCAVATION C.Y. 1125 15 4.45 66.75
05.521 GRANULAR BORROW (CV) C.Y. 590 4. 95 $
05. 535 SALVAGED TOPSOIL C.Y. 10 3. 50 $
JE l OF 4 SHORT-ELLIOTT-HENDRICKSON, INC.
2118. 501 AGG. SURFACING, CLASS 2 TON 50 10.50 $
*2211. 502 AGG. HASE, CLASS 5 C.Y. 1600 892 6.30 5619. 60
*2231. 501 BIT. PATCHING MIXTURE TON 0 23.80 $
*0231. 606 BIT SURFACE JOINT &
CRACK REPAIR L.F. 0 1.27 $
2331. 508 TYPE 41 WEARING COURSE
MIXTURE TON 3460 2686.07 17.70 47543.44
*2331. 512 TYPE 31 LEVELING COURSE
MIXTURE TON 0 19. 10 $
2357. 502 BIT. MATERIAL FOR TACK
COAT GAL. 1215 400 1.00 400.00
2501 . 511 35"X24" CS PIPE CULVERT L.F. 38 31.00 $
2501 . 515 35"X24" CS PIPE APRON EACH 2 150.00 $
2506. 517 CAST. , TYPE R-2560-EB
(GRATE ONLY) EACH 1 150.00 $
0563. 601 TRAFFIC CONTROL L.S. 1 0:7 7950.00 5565.00
2564. 531 F & I SIGN PANEL, TYPE C S.F. 110 16.75 $
0564. 532 F & I SPECIAL SIGN, "K" EACH 11 35.00 $
0564. 532 F & I SPECIAL SIGN, "L" EACH 1 35.00 $
0564. 602 F & I STREET NAME SIGN EACH 1 200.00 $
0580. 503 4" SOLID LINE YELLOW -
PAINT L.F. 8865 0.18 S
0580. 507 4" BROKEN LINE YELLOW -
PAINT L.F. 22fi 0. 18 $
*2573. 501 BALE CHECK EACH 4 6.25 $
2575. 502 SEED, MIXTURE 700 LB. 50 6.00 $
*2575. 523 WOOD FIBER BLANKETS, S.Y. 50 2.75 $
TYPE HV -
*MILL BIT. SURFACE,
FIRST COVERAGE S.Y. 21500 20800 D.74 15392.00
*MILL BIT. SURFACE,
SECOND COVERAGE S.Y. 21500 0.39 $
?AGE 2 OF 4 SHORT-ELLIOTT-HENDRICKSON, INC.
*BASE PREPARATION AND
COMPACTION S.Y. 21500 20$00 0.41 8528.00
*TYPE 31 BINDER COURSE
MIXTURE TON 3100 2518.26 17. 50 44069. 55
*SHOULDER PREPARATION R.S. 80 77.5 75.00 5812:50
ENOTES REVISIONS PER CHANGE ORDER NO. 1
�E 3 OF 4 SHORT-ELLIOTT-HENDRICKSON, INC.
• � : ' . APPLICATION FOR PAYMENT - Continued �
, .
Total Contract A�unt $ *199 ,479 . 88 Tota1 Amount Earned $ 142,232 .44
Material Suitably Stored on Site, Not Incoporated into Work $
Contract Change Order No. l �ercent_Complete � %Included Above
Contract Change Order No. Percent Complete $
Contract Change Order No. Percent Complete �
GROSS AN�UtVT DUE. . .. . . . . . . .. . . . $ 142 ,232 .44
LESS 5 % RETAINAGE. . . . . .. .. $ 7, 111,63
� AMOUNT DUE TO DATE. . . . . .. . . . . . . $ 135 , 120 . 81
LESS PREVIOUS APPLICATIONS. . .. . $ 0 . 0 0
AMOUNT DUE THIS APPLICATION. .. . $ 135 ,120 . 81
CONTRACTOR'S AFFIDAVIT
The undersigned Contractor hereby swears under penalty of perjury that (1) all previous progress.
payments receiv.ed from the Owner on account of work performed under the contract referred to
above have been applied by the undersigned to discharge in full ail obligations of the under-
signed incurred in connection with work covered by prior Applications for Payment under said
contract, and {2) al]
materiai and equipment incorporated in said Praject or otherwise listed in or covered by this
Application for Payment are free and clear of all liens, claims, security interests and
encumbrances.
Dated August 9 , 19 90 , Ace Blacktop , Inc.
Contractor
�
By -
(Name and Tit e
COUNTY OF �a� SS
STATE OF �'I.'.ar,es�_. )
3efore me on his /G � day of • , 19 1�4 personally appeared
$ �e knawn to me, w o bein�g�uTy sworn, did depose
�nd say that he is the e r of the Contractor above mentioned;
Offi
that he executed the above Application for Payment and Affidavit on beh of said Contractor;
and that all of the r�in ar true, corr t and mplete.
�`�'��� �6f�T.•��EEN M. S�1;E�ENEY
My Commission Ex ir ""'"=°
P z• �-��raoraRY Pvsuc—rw;ror��soTa
DkKQTACOU�VTY otary ubl ic
�r commissian.Expi►es 6=1s•sa
The undersigned has chec e e on ra or R piication for Payment shown abo�re. A part of
this Application is the Contractor's Affidavit stating that all previous payments to him
under this Contract have been applied by him to discharge in full all of his obligations in
connection with the work covered by all prior Applications for Payment.
In accordance with the Contract, the undersigned approves payment to the Contractor of the
Amount Due.
Q, /`3 /p�„ SHORT EL I NE CKSO I
Date CJ[ � /��
By
Page 4 of 4