TO: Mayor, Gty Council, City Administrator
FROM: Dean Johnson, ntrector of Gommunity I�evelopment
DATE: June 2, 1989
SU$d: tSD 196 Contract Alternatives - Park Improvements
Attached is a copy of my bid tab for the Eagan Elementary Sch.00l,
Rosemount Elementary School and combined bids, which were opened
June i, 1989. The low bidder, regardless of any combination of alteTnate
bids, is Loeffel-Engstrand Co. from Hopkins. The corresponding
alternate bids for the additianal parking lot for the city park and the
completion of the park improvements on city property are shown as
Alternate #1 and Alternate #2. The engineer's estimate on Alternate #1
was $25-30,OA0. The engineer's estimate on Alternate #2 was $30-35,OQ0.
The first alternate bid is within the estimate and very close to other
bids. The second alternate bid was affected by an addendum to the
original plans, which added grading to the park for better drainage
around the facility. The estimate for this was estimated by Gammon
Bros. Excavating (contractor doing the rough grading) af $7-10,000. The
actual bids are still in excess of the estimate by the engineer. The only
expianation we've discussed with the architects is that the estimate on
trail construction was low.
In reviewing the final bids and evaluating the overall savings anticipated
by "riding" on the school contract, i would recommend the Council
request that the school district accept both Alternate #1 a�nd Alternate
#2. Both bids are within the range of bids submitted by the five
general contractors. They are neither the low nor the high bids in
either alternative.
� � � � ,..� �� �� � � .
r � ��� �=�-�. � � �� 7 , �a �-,-
Project: Two Elementary Schoals- Pinewood and Shannon Park � �,., r r. Indepedent School District#196
Comm. No.: 8826 �-���'�'` -�f`- �' Rosemount, Minnessota
Da#e : June 1, 't989 �
Time : 3:OOpm --��''-r✓ti-�-�� `�:./�...-��.�, THE WOBD A SOC ATION
`
Bid Add. Ait. #1 Att. #2 Alt. #3 Ait.#4 Alt.#5 Ait.#6 Alt. #7
Contractor Praject Bond 1,2,3 Base Bid Park. Lat Park Surcharge Metal Windows DDC Temp OiI Tank
im rove. Co in Alt. Mf . Controi Monitor.
. .. . . . . .. . .,-- .+ . .. � . . y . ..
Pinewood ,/ � � ,(',��v, r� N/A N�A ,- �� �--� ���j�� i�.f� � � -�
�-�-o� -����
Adoifsan and Peterson � _ � �
6701 West 23rd Street Shannon Park / � ,� r ^ N/A �
Mpis., MN 55440 '/ � �� �� ?..�-?,�� � ;,�� ;�2, �� �� � ' ' G,L�J
612/544-1561
� � ./ / ! j �- -
. Pinewood and � � � �= ��� �� ,�,�J� �, ^ � �� � ��� d
Shannan Park , � � .� , , - _ : '�-� � � �3 �}� ��j �, � ` Q:�
Pinewood / f .. N/A N/A _ _ �
� J ,�� �' �-- --
Knutson Construction
53Q1 E. River Rd. #i01 Shannon Park � , r �i N/A ._- ._._= f
Mpis., MN 55421 ,_,; ' � ^ ���c� ..— ..-- �--
�,
612/572-5757
Pinewood and � '� -�- - �` � y -�
Shannon Park ��-- ,��� � � ��� �`,.;.�.c_� 2,1�Z� l���� i'`..�;� � �`�D "f��
+ .. i t,
_ Pinewood ,� ,f 5, � !� � D�� N�A N�'�' �,?,o� �s,oe� Nb �; 100 � t �a
Laeffei Engstrand Ca
1040 South Sixth Street ,r -� - -�- �
Hopkins, MN 55343 Shannon Park �� fG� (� �� ,--, N A � �.
612/935-0141 'J � t V l �,��?� �'�r�'J � to�i �a ,f D ,�(-l �C� .�-I�Z�
� Pinewood and y � � - � y
Shannon Park � ;� � � � l� � �� �� �D .=;�.�✓J �''�\ �`� �.} �r-�
r � +' � fv'I�(/ � ��D�01�t/ � � �!��� ���r}�
f/
� . �4 . - � � . � i
Project: Two Etementary Schoois - Pinewood and Shannon Park Indepedent School District#196
Comm. No.: 8826 Rosemount, Minnessota
Date : June 1, 1988 BtD TABULATI4N
Time : 3:Oapm THE WOLD ASSOGIATI�N
B'td Add. Alt.#1 Alt.#2 Alt. #3 Alt. #4 Alt. #5 Att.#6 Alt. #7
COntraCtor ProjeCt Bond y,2,3 Base Bid Park. Lot Park Surcharge Metai Windows DDCTemp. Oil Tank
Im rove. Co in Alt. Mf . Controt Monitor.
lV 'V � �
� � Pinewood N/A N/A
� � �
Madsen-Johnson Corp.
901 Industriai Street Shannon Park N/A
Hudson, WI 54416
612/436-5281 0� .
715/386-$201 Pinewaod and
Shannon Park
,
Pinewood � � � N�A N/A � �
� ,f � _. �-� r �� �� ���r1� l�l(�� ��� `���.D�
�:, � � ;.,; �"��b
Penn-Co Construction
� �
1301 Gorp. Center Dr. Shannon Park / r N/A �, ���
Suite i 50 �f `✓ �r �� '�J�� �,S'I?.� �`�7 �v'-�t'2� /,-�J =.��Q ,�--,
Eagan, MN 55121
�
612/687-0648 Pinewood and �' + �" .�
Shannon Park � `� I � , /�-2.� l c�-`� 2�5i� 5I� ��� �,p� 10� i�3�5a0 l�� �fl� ��
/ fi -� ,:-
Pinewood �/ � � , 72�, �v4f�.� N/A N/A �,I ��� 75��� 4� ��aOfl ���Ba
Sheehy Ccanstruction
360 W. Larpenteur Ave. j � ��� 3�� � -� - -r �--
St. Paul, MN 55164 Shannon Park � ./ �r � ��{� ����� N/A 75�� �n � �,fl0 �Gboo
612/488-6691
Pinewood and t �- �' — + �-
Shannon Park ✓ ✓ I I i �j��O l� �p��p �}Z�� 2,`�Q� /�i��� �� �j �OD ol ZE�C7