Loading...
HomeMy WebLinkAbout4.i. Approve Change Order #3, Lift Station #5, Contract #1988-8 � �I I�i.� ��+ � �r*�**************�t***************rLEP10********�************************�c***�c�**** DATE; AUGUST 10, 1989 , T0; AIAYOR & CDUNCILAiEpiBERS Cf0 ADMINISTRATOR 3ILK FI20r1: CITY LNGINEER/I'UI�LIC WORKS llI12�CTOR IILFT R�c ' ITEAiS FOR AUGUST 15, i989 COUNGIL AtEETING ' CONSEI�T AGENDA Approve Ghange Order 1�3a Lif[ Station #5, CiCy Contraet T9$8-8 C1►an�e Order �3 �onsist of payurenC for non-concract related work during the construction of Lift Station �5. The work this change order covers consist of pumping water from the T,ift Station wet-well to complete the interior canstruction of the wet-well. Water infiltrated the wet-well through upstream manholes after the gravity line was connected to the sewer line coming froix� the Country Hilis 3rd Additidn. Because both projects Were being constructed at the same time water infiltrated the manholes because the castings were not ye� inplate. I would agre� with our Con�ulting 8ngineers who are xecommending approval of this change order regarding payment for additional non-contract work. Re�ommended action for Council to consider is to approve Char�ge Order �3 €or Lift Station #5, City Contract 1988-8 and authorize the riayor and City Glerk to sign the documents. l� A, 8y ►'itli . Y7Ri ND� ,:_. __ ___ _-_ _ _ __ _ __ crnPP�WAFACCS WlSCONSlN ' � y . ..�. � � . . : � . � - � . . � •. � � � � . . � . DAILY RECORD OF NON-CONTttACT WORK Owner Citv of R�semount Pro�ect No. 192 Pro�ect �ft S �tian # 5 SEH Fi1e 89010 Contrac�or Orr ConGt-,,�r+-;�, Date 4/24189 Description of Wark p�,�„�,;,� .���. �� �i�t S��ion wet we11 to camplete interior oonstructi,�n of w�et w�ell. LABOR Direet Name Time . Labor .. Classification Start S,to Hour Rate Cost Lalx>r � 200_00� ----�— .-.�� Total direct 1�`aVor MATERIALS Payroll cos�s @ _ _ � Item � Total labor �Fb.�6"—" Quantit Unit Unit cost Cost : E4UIPMENT Subtotal (Include Operator Time Under Labor) Sales tax . Total materials NA Unit Time Start Sto Hours Rate Cost 4000 amp, qenerator (rental) 3u �'-r!'r' (rPnfi-a11 -�= 1? ��1�.08 u �� 24.0 �t.17 1 fl0.Q8 _� h�sP t r ni-a l 1 24.0 1.44 24.96' _�ack #2 � 'm1l�eaae) 120 0.20 � 24,00 ---_______ Total equipment 24g.12 SUMMARY APProved: Total labor 200.00 Total materials Np ..,_ , �_�,��q' Total equipment 249�12 Contrac or Date �[ Overhead & _. Prafit @ � � /?� �y� ,� +�Tiss---`�` /5/�9 R�t .. Pro�eGt Date To�al Cost Representative $449.12 .