HomeMy WebLinkAbout6.d. Accept Bids / Award Contract 1988-9, Limerick Way Watermain r.-� � `�,, `"
,�* o**�***����***��*************��**���*
�*�******�*�**�r�r*�r**�*�r�x*�r*********�x** P1EPt
DATE: 3ANUARY 13, 1989
�0: 1�4AYOR & ��Dr INI5TRATOR JILK
C/Q CiTY
FROPt: CITY ENGINEER HEFTI COUNCIL PIEETING
RE:
ITEFtS FOR THE 3AI��ARY 1�, I�B�
I
NEW BUSINESS Limeri.ck Wa Watermain
or I�imerick Way �latermain and
Acce t BidsfAward Contract 198$-9 o ening £ ,
bid P �}�Q contraet
tion fo�c GQuncil to consider for awarding
Thi� item con�ist of the results o a
e n e d o n J anuary 12, 19��. There
a recotmnenda tabulation.
Watermain improvements w�re oP � ,��tached This i$ about
r o e c t a s can be seen Y 2 1�2 6 1.
The I,ime r i c k W a y in ��e $�ount Q� $
bidders for this P � over o u r feasibility report
were f o u r �4) an d S E x c a v atin g
The law bid is from T estimate and abaut 2�
12% over our engineerir�g
Some of
estimate. The
oing Woodbury and Shorewood.
t is g to check some xeferences for this Contrac
Our Consultan as the Contr���or can be bonded, it
' references he i:ndi.cated `�ond,�so r&s 2ong �a� idder.
the bid b onsible b
Contractar did submit a to him that the bid
would app�ar that he wauld be the lowest �esp
Bill 3acobson, and indic��ing
the developer, did
After contacting lic Hearing, he indicated To�ect
abave the estimated constpubtion cost stated in this
; costs were slightly resented at the roceed with t P
re ort that was p anxious to P
€easibility P
nat have a problem witl� this �ancy around�the fir3t of ttay•
because he's looking �o� o��u� ider is ta aecept tl�e bids and award �l�t�
to the lowest resPotisible i�icicler,
Recommended actian f�ri k Way1Watermt�in, - G1erk to sip,n ttie Contract
Contract 198$-9, Llm and City
S Excavating, and authorize the Atayor
Doeuments.