HomeMy WebLinkAbout9.a. Approval of Connemara Park Projects �
ITEM #. 9 p i
, ! • �:
. �:
� � ��
�
T0: Steve Jilk - City Administrator
FROM: David J. Bechtold - Director of Parks & Recreation
DA�: May 24, 1989 = ' �
RE: Connemara Park Projects
The Council authorized the writing of specs and the advertising for bids on ;
the Connemara Park construction pro3ect. Following the bid opening the �
conclusion drawn by the engineering consultants and our city staff was that ' �
we could not �ustify continuing with contracted services of the pro3ect. �
_ i
Boyd Bailey worked with the maintenance staff to comp].ete segments of the ��
pro�ect. You have had some general input as to this being done, however, I
would like to give you more detailed information about the pra�3ects at tRis ; �
time,
j1
" i
ITEMSs QDANTITY AMOIINT
1/ � SAND FOR FILL 1252 TONS $ 3,220,21 �
2/ * BACK HOE RENTAL 750.00 PER. DAY 750.00
3/ * WATER MAIN 2,152.46 :�
4/ * SHELTER 40 OCTAGON 13,000.00 �
5/ IRRIGATION ALL OF' BAI�L FIELD AREA 14,000.00 '
6/ * PLAYGROUND EQUIPMENT � 10,000.00 �
7/ SEEDING & FINISH GRADE 3,000.00
8j CONTROL / STORAGE SHED FOR IRRIGATION CONTROLS 3,000.00 '_
9/ ADDITIONAL SAND & GRAVEL 500.00 : �
10/ ADDITIONAL COSTS FOR FOOTINGS OF SHELTER 1,600.00
* INDZCATES ITEMS COMPLETED ' `�
` �
4
� � � � s`.:;.��
Labor costs and complete itemized summary of pro�ect will be submitted to '
you on a monthly basis. This will include a cost breakdown of the labor
completed by the city staff as we11 as the city equipment used.
ri
The completion summary will then be compared to the bids received when
pro�ect is completed. .
� � � � � �a
Council authorization is requested to proceed with this pro3ect. The motion ;
would be "to authorize staff to write specs and advertise for bids for
Connemara Park pro�ects as listed in memo o€ May 24, 1989".