HomeMy WebLinkAbout4.f. Approve Change Order #2, Hawkins Pond, Contract #1988-2 .
� ���� �
� � ....�r.,i�.��, � i • �
�
*********�r******�*********�r**�*�*�*PtEMO�t***��r***x***�r*��r�r��,r�*�****�t****,r***�***
AATE: JULY 2b, i989
TO c rtAYOR & COUNCILMEPiBERS
C/0 ADMINISTRATOR .IILK
FRObt; CITY ENGINEERjPUBLIC WORKS DIRECTOR HE3�TIr "
REr ITEAt FQR THE AUGUST 1, 19$9 GOUNCIL r1EETING
CONSENT AGENDA
Approve Change Order ��2, City Contract: I988-2� Hawlcins Pand/Section 3t3
Sanztary Sewer
'['his a.tem consist �C 11>}?r�v:�2 <�f C►ia��Fe �rcler �f2 fc>r Ccintrr�cl ]9£ifi-2, llnwkii�s
Pand/Section 3� Sanitary Sewer Impravements, This memo proui,deg a brief
description of the Change Qrder and reco�nended action for Couneil to take.
The first of the three items Change 0rder �2 covers was for the extension of both
culuerts under John Hawkzns driveway, In order to prouide a safe recovery area
from the west edge of l�tr. Hawkins $riveway the culverts were extended about $'
westerly.
The seeond item completed topsoiling and sodding i�ir. Goodrichs' abandoned
easterly driveway. This item was accidently left off the completian of the
Shannon Parkway Project ��171. Mr. Goodrichs' easterly drive�say was abandoned
because it confl'zcted with the southwest radius of the Dodd Boulevard and Shannon
Parkway intersection. i�tr. Goodrich has another driveway on the westerly partion
of his Iat. We also provided access off Shannon Parkway for him. The cost £or
this was included in the City share caiculation of the cost ta be assessed.
The last item was necessary to control erosion along the erosion prone areas of
the pond slope.
The total cost of this change order was already included with the previous
resolution Council past adopting the cost to be assessed resolution. Processing
the paperwork to obtain the neceasary signatures was the reason the change order
did not precede the cost to be assessed resalution.
Recommended action for Council to take is to approve Ghange Order �2 to Contract
1988-2, Hawkins Pond/Section 30 Sanitary Sewer Improvements and authorize the
Alayor and Gity C1erk to sign the document.
u .,i_k. ... . '
�I
� ` • ���nrc� v�n��
...
....r
�
ENCINE@RS�ARtHITECT81 PLAJ�/NERS
222 EASlLfTTLECANADA ROAD,ST PAUL,MINNESOTA SSti7 6t2 484-0772
Cit of Rosemount DATE �u1� �n tqA9
OWNER �
OWNEf�S Pt�OJECT NO. I76
CHANGE OI?DER N0._.—.�.-
P�OJECT DESCRiPT10N Hawki ns Pond SEN F►LE ND.��42�-----
The foNow�ng changes'shall be macie tv ti�e contract docum�nCs
Descr�ption:
Add the following work items �to the Cantract.
(See attached surmiary)
Purpose of Change Order.
Payment for additional non-contract work items associated
with the project.
Basis of Gosr: u �A�ccua! o Esrimared
Ar[achmen�s(�rst support�ng documents)
1 - Sur�nary of�non-contract work i tems.
3 - Daily records of non-contract work.
Tirne CosC
Contract 5tatus � ��—_, 7p g52,pp
Origina►Conrract 0/15 � 24,93$.98
Net Change Prior C.O.'s 1 to _- 6,994,58
Change rhis C.O. .J $202.785.56
�ni��
I�evised Contracr
Recommended for Approval: Short-Eitlott-Hendrickson, Inc. By
Agreed ro by ConCractor: Approved fior Owner:
ay
_ By
i'iCte 8y
DistributJon Conrracror 2 Owner T Projecr Represencanve t SEH Office r
cNr���wa��e�5,
SNOR�'ELLfO� St PAUI. WlSCONSiN
, HENDRIEKSON INC. MtNNE50TA
� ! �
SLJNIlKARY OF NON-CONTRACT WORi{ ITEMS
CHANGE ORDER NO,, 2 :
HAWICINS POND
CITY PROJECT NO. 1?6
ROSEMOUNT, MINNESOTA
ITEM DESCRIPTION COST
1: "'`�''� Extend Cancrete Culvert Under Hawkins
Driveway $4, 969.66
2. ., ,Transport and P1ace Topsoil on Goodrich ; ,
� . property at Dodd Blvd. and Shannon
Parkway $ 379.QQ
3. Furr�ish and Install Wood Fiber Hlanket •
for Erosion Control S1, 645.92
TOTAL $6,994.5$
� � .,_w�.,��,�,, � �
� �
DAILY RECORD C1F NON-CONTRACT WORK
4wner City of Rosemount Pr4�ect No. 176
Pra�ect I3awktns Rond SEH File $$U�`6—
Con�ractor Enebak Cbnstxuetion (l�bdland) Da�e 6/2,�89
Description of Work Extenc�i�cr Concrete i on John Hawkins driveway as
ordered bv citv.
Dlrect
LAHOR Time Labor
Name Classification Start S,to Hour Rate Cost
�:oreinan w/�w�?- � _�.�_ 40Qa�9
�_
.Iat�r 8.0 33.00 ...���:..,..�
_T.atinr �—
- g_(� 3;� �0 _264_QU
.-,-..�.w
Total direct labor
MATERIALS Payro�,i casts @ $
Item , . Tot+�l b r 928,00,.,.�
, ���'`."`•. , ' uan�it Unit Unit cost Cost
4d" rnnrrat'a an-.n �j,� 16 .j,-f- 462.6Ei 100�*�.�
f'r�nrrAt�A rmr#�nr m�x —'�-'
_-�`�-,rrx'.Ta-t'�+ R=-ct� (r7����l�� -�'�''-- -�- - �62.2�_ 311.�.�
.?�-_2� .� $4.3537 6�j�35
EQUIPMENT Subtotal $13$0.40
(Include Operator Time Under Labor) 10� �a1�.�4�j,�.s�.�t,aac„ 138.a4
Totai mat�rials �1518�44
Unit Time
Start Sto Hours Rate Cost
Backhoe w/ operator 8.0 100.00 800.0
Compressor w/ iackhamner p -�--�----
Cat 966 loader 1 ,Q �.QS �:b�
.��..
Total equipment $875.00
SUMMARY roved:
Total labor 928.Ofl
Total materials i518.44 - � � �
Total equipment 875.00 Contractor Da�e
Overhead &
PTOf3t @ 15 $ 648.22 .V r�„/..'-� ..-�r.�_-� 6/2?/$9
Mobilization 1000.40 R sident Pro,ject Date
Represen�ative
Total Cost $4969.66
_r
. • �
DAILY RECORD OF NON-CONTRACT WORK
Owner Citv of Rosemount Pra,ject No. 176
Pro,ject Hawkins Pond SEH File 886�- `—
Contractor E�ebak Construction �Muiligan) Date 5/
Description of Work �„1in� ��PlaGi.ng topsoii cm �c,iodxich Arc�perty @
Direot
LASOR Time Labor
Nam� Ciassification Start Sta Hour Rate Cost
,Totai direct la�r
� MATERIALS Payro3l coete @ $
Totel Iabor �
Item Quantit Unit . .Unit cost Cost
_Tot�soil''frc�4t`Hawkins Ponc� NC
E4UIPMENT Subtot8l
( Include Operator Time Under Gabor) Sa2es tax
Total materiale �
• Time
Unit Start Sto Hours Rate Cost
Case skid loader • 330.00
Ta.� C�t,mn t-r��r
� +
Totai equipment �330.00
SU[�(ARY . roved:
Total labor NA '
Total materials N(i � ��
Total equipment $330,00 Contractar Oa�e
Overhead & .
Profit @ 15 � �49.50 ��t�T✓ �y.�-,,� ,_..- 5/25189
Reeident Pro�ect Date
Rgpreeentetive
Total Coet �379.00
, � .._��,.�,:�•. � , ' .
� y � �. . . • . � . . :
.. . . . � � �� . . . . � � . . -� . . . . .
. . �. . .. . . � . . . . . . .. . .. . . . . ��,Nr� . � � � � �.
. . . . . . � � �. . . . . . � . . . . ' .
. . . . .. . � . . . � � . �.� �1t .. , .. .. .. .. . .
r
.;.-...•�.i....
«u
Mulliq�n tr��Mprin4 6 tindsapinq Co. t
, � � .._��. ��� ,
� ' •e.,�o'• MaMh�.MN i60R7 • �ra o�e� Etat�kin Pond
/ ��,�.,..E...�...�.,...�...x. Shannon and Dodd
F.nP �}�L.,�;t2n.4]'r�l t i��, �
P. 0. Box 45$ l�"�
�t �,,,
aa ,.
N�r.tt�£.iQld-, MAL 55A�7
" ` �� �'V �` � �� �-` � TERMS: '
J � —� -� PLEASE DETACN AND RE7fIRN WfTH YCVtt RE:1d1TTANCE $
s�;�R� F«f��rr itc�+uRiCiiSQN, trac.
„ OATE CH�aRGES ANO ^REQITS B�►t,.J►NCE
N1 r�Y :��� f_''���� �
BAt,ANGE FQRWARp ,
'1
��• PAUL: � Skidsteex and Dump @ 6 hours
55 per nour 33� 0�)
�
•5 C)
I I
� � i
,
� �
.
�1����'aw+'^� 7A Y LRST,�:.4fC:
��Q�,l/ ;N TNIS CJL'� •
MULLl�AN TREE h10Y1N8 AMD i.ANDSCA�iMti �.
, � � . �
DAILY RECORD OF NQN-CONTRACT WORK
�wner Citv of Rosemount Pro�ect No. 176
Pro�ect Hawklns p�l SCN File 88026
Contractor �ebak Canstruetion fE1-Mac� Date 6/23 89
Description of Work � 'T
Placinc# wood fiber blanket a�k locaticros on Hawkins Pond
as dirp r.�3 �y nai nrar ,
LABOR Direet
Time Labor
Hame Classification Start Sto Hour Rate Cast
-�
--.-�
Total direct Zabor
MATERiAL5 Payroli costs @ $
Item Total labor NA
Quan�it Unit Unit cost Cast
Wc� Fi 1'�,�r, Bl ankPf-
6 23 $�T 404 .�'.1�'`- �44 1 Q69.92 '
s. . $1.4�— '�6.T$�-
E4UIPMENT Subtot8l
{Include Operator Time U�der Labor) Salea tax
Tatal materials $1645.92
Unit Time
Start Sto Hours Rate Cost
�, .,�_d... ... .
________ �
_-____--�- �
-,-�
., .
Total�equfpment NA
StJNIlyARY ' u ' ti �Oved:
Total labor Np
Tatal materials �'f�.�'� �
Total equipment ��-- Contractor � �"
Clverhead & Aate
Profit @ $ (1) �
�_�_._'��� l 6127/89
_ eident Pro,�ect Date
Representative
Total Cost $1645.92 �
(1 ) Prices as quoted by general cc>ntractor.