Loading...
HomeMy WebLinkAbout4.h. Approve Change Order #1 to Contract 1988-7 � • � �� � � �� *******�r*******************�r*******,t*****PiEptQ*******�r***�r***��*�****�*********** DATE: APRZL 24, 1989 TQ: MAYOR & GOUNGILMEPtBERS Cf0 ADMTNISTRATOR JILK FROM: CITY ENGINEERfPUBLiC WORKS DIRECTQR HEFT R�: ITEPt FOR THE PtAY 2, 1989 COUNCIL r1EETING CONSENT AGENDA A rove Chan e prder �1 to Contraet 1988-7 Shannon Parkwa /Gonnemara Trail This item consist of approving the attached Change order ��`l. The revision that necessitated this change order resulted from reducing the aggregate base quantities. The reduction in quantities is because the subgrade strength was underestimated at the time of plan approval. The reason for the underestimation was because the soils test indicating the subgrade strength was not availahle to us when we had to submit these plans to State Aid Office for their approval. Therefore, to keep on time we were conservative in estimating the subgrade strengfih in order to get State Aid approvaT and proceed in a timely fashion with the praject. Reco�nended action for Council to consider is to approve Ghange Order 4�`I and suthorize the Aiayor and City Clerk to sign the appropriate documents. � � ,,,,iv � � CHANGE OR�ER .�r �a�acrr+racss w�uarNsas 22?EASTLfTTZE CANADA I�AD,ST.PAUt,MINNESOTA SS t 17 617 48d-p272 owNE� City af Rosemaunt oATE Aarii 5. 19$� QWNERS PRQIECT N0.- 18g ES�P 20$-106-04 & 208-iO4-Q2) i ' CHANGE ORDER NO. PROJECT pESCRIPTtON Shannon Parkwa,�lG�nnpm�r,�T.�ai.1�. SEH FtLE NC?. 88254 The failowing changes shal►be made ro rhe conrracc documents Descripcion: Revise the plan quantity of Item 2211.503 - Aggregate Base Placed, Cl ass 5 fran 6050•CY to 5100 CY Pur�seofChangeOrder. Reduce tfie base quantity in accordance witfi revisions to the propased typtcal sec�ion. � BasisofCvsr: �t Acrual o Estimated (6050-5100) x $7.50/CY = $7,125.00 Atrachmenrs flist supporting docurnentsl (Working Days) Contract Status Time Casc �r�ginat Conrract 45/65�75 $484.7 00 Net Change Prior C O.s fo __ __ : Change this C.Q. -- (7�125.00) Revised Conrracc 45/65/75 $477,594.0� Recommended for Approval: Short-EIIIvtt-Hendrickson, ►nc. 8y Agreed to by Contracror.• APproved for Owner: .• ey By Ti[te By Dtstrtbuflon ConCrdCfor 2 Owner t Project Representafive 1 SEN OffiCe 1 SHORT ELCIOTT ST.PAUL, CHtPPEWAFAttS, H�NDRKK50N iNC. MtNNE50TA WISCOMSIN