Loading...
HomeMy WebLinkAbout4.g. Approve Change Order #1, Jaycees Park � � ITEI� #�. G T0: Mayor / City Council � Stephen Jilk - City Administrator FROM: David J. Bechtold -- Director of Parks & Recreation bATE: September 22, 1989 RE: Payment for Gha:nge in Jaycee Pro3ect (198 - $9 - 6) Additional work was required in the Jaycee Park project that was ordered bq the Council through SEH. This project is known as Pro3ect � 148 and is under Contract � 89 - 6. Due to a change in the design on the boarder between the Westridge portion of the park on the south and the Wensmann portion of the park on the north a fiber mat was required to be installed. This helps to prevent erosion on the slope where a $reater degree of grade was required. The cast of this item is $1,124.00. The other addition was a section of four inch (4") water main for a change in location of the control building for the irrigation system. ; The cost of this item is $620.96. Council authorization is requested for approval of necessary sigttatures � on documents` associated with this pro�ect change and to pay Brown & Cris, the contractors involved with the Jaycee Park landscaping project, the amount af $1,740.96 for the additional labor and materials required to complete their contract work.