HomeMy WebLinkAbout6.g. Approval of Final Payment Valley Oak Addition Phase III, Replat - Contract #1988-1 � •
.
�
�***�r�*****,x�**�**,t**�*************a****AtEAtO*************�r******er**********ar***�
DATE: 13ECEAIBEft 27, 1988 �� �q .
_J
TQ: MAYDR & Cf?UNCILPtEAtBERS
G/U CITY ADt�lINISTRATOR 3ILK
FRflM: GITY ENGINEERIPUBLIC WORKS LIIRECTUR HEFT
REt ITEMS �OR THE JAPIUARY 3, I989 COUNCIL ME�TiNG
CONSENT AGENDA
�prove Final Pa�ent-Gontrac� I988-1, Vallsy Oak AddiLian-Phase III
The Cantractor, Moser Construction Company, has completed the work under Contract
198$-1 in cc�nformance tp the cantract specifications and plans. There wiil be a
one year warranty on the work as provided far under the cantract document�.
Reco�aended action for Council ta consider is to approve the 5th and €inal pay I'
estimate to Moser Gonstructian Camp�ny for Cantraet 1988-1.
1
I
1
� •
2357.502 BIT. MAT FOR TAGK COAT GAL.
26� a_ i.00 s �so.aa f
2504.602 ADJUST GATE VAL�TE HQX EACH
1 2 $0.00 $ 16�.00 ,/
2506.522 ADJUST FRAME AND RING EACH
CASTiNG 6 7 100:�p $ 7�O.Q0 ./
2531.501 CQNCRETE CURB & GUTTER, L.F.
DESIGN D418 2750 29�45_ 5.20 $i5314.4Q �
2554.501 PERMANENT BARRZCADES L.F.
3� �4 20.00 $ 1280 00 .�
�1• LIGHTING '�`—'-"
2545.552 --gEED POINT
EACH 2 �_ fi00.OQ S 12Q0.p0 ,f
2545.511 LIGHTING UNIT, TYPE A EACN
1 L . 1450.00 $ 1 d5ti-. {}�--� "/
2545.511 LIGHTING UNIT, TYPE B
, EACH 3 3 1655.33 $
2545.532 UNDERGROUND CpNDUCTOR 4��� �S �`
L.F. 720
� ?19_ 2.2Q $ �5f31 Rfl ✓
P111;}, 3 (}F 4 SIiORT-ELF�IOTT-T�CtVDRICKSON, INC,
.. , �"-
�' ' �'IICATION FOK PAYMENT - Continu�� .
Total Cor�tract Anwunt $ ].pa 140. 49 ���,60a.0� �
, Total {�nount Earned
� tt�s�,�---
Material Suitably Stored on Site, Not Incoporated inta Wark
Contract Change Order No. 1 $
Percent,Comp�ete 100 � 2213,53
Contract Change Order No.
,...______ Percent CompTete
Contract Change Order No. �_ �
Percent Complete �
GROS5 AMOUNT DUE. . .. ... ..... . . . $ '��;���9�-
LESS 1 RETAINAGE... .. .. .. � 0
' AI�UNT DUE TQ DATE.. ... .. .. .. �-��z-8� ►tb ��,S,S�
tESS PREVIUIIS APPLICATIONS.. ... � 113780.t5
. c, k.. .
CONTRACTOR'S RFFIDAVIT ' , A�UNfi DU� THIS APPlICA7I0N. ., , $ 3�5.� �',.
� �
The undersigned Contractor hereby SW�ars under penalty of per�ury that 1 all
payments received from the Owner on account of work performed under the contract�referred to
progress.
abov� have been applied by the undersigned to discharge in full all obtigations of the under-
signed incurred in connection with work covered by prior Applications for Payment under said
contract,
material and equfAment incorporated in said Pro�ect or otherwise listed in or cavered�b�lthi
APPlication for Payment are free and clear of all liens, claims, security tnterests a y S
encumbrances. n�
Dated _�L � "r'
�'� � 19 �� Moser Construction
. . . � . / �� ��. . � .
Contr�actor
By �-,,rC. '!�i�
� Name and Titte
COUNTY OF � SS �
STATE OF �,_ _ �
___._
8efore me on this ,.,� day of
nown to me. w o being u yRsworn,��d�d�de�ared
and say that he is he po��
�`` of the Gontra vr above mentioned;
that he executed the above Appl cation�for Pa ent n
and that atl of tt�, Ym a fi �t half of said Contractor;
��.�?�.���s����!AAa�����d�the�in a�� re a d complete.
My Commission Exp� ` ;;�, R"l�fttEl [i 1't��:;iS � =
���,� ��1�,'�(~�f Hi L���iljit:i:a:��A y
' y���.y� r)il�(�i��p(
� � .�hc�::,� ��c.sr�.xa.�, Notary Pub ic
The undersi ned ��,,r�t�: �� �e ,; .,.. �° .,
g has c�eckec� ��e ��r�t���'t�`� pp�;cation for Payment shown above. A part of
this Application is the Contractor's Affidavit stating that all previous payments to him
under this Contract have been applied by him to discf�arge fn full aii of his obligations in
connection witfi the work covered by ail prior Appiications far Rayment,
In accordance with the Contract, the undersigned approves paytnent tb the £ontractor of the
Amaunt Uue.
t�a�e � ,Z.-� �,pl �j StiORT E TT H RICKS , ,
�y
Page ____--4__ o f 4