Loading...
HomeMy WebLinkAbout5.e. Postpone Bid Opening for O'Leary's Hills 4th Addition Improvements � . Z`�F�►••-1 �� ********�*****�**�*********�t�***��r****A1Eri0***�**********�t�******�***�***�******** DATE: SEPTEMBER 14, 1988 T0: MAYOR & COUNCILttEPtBERS C/0 ADMINISTRATOR 3ILK �, FROri: CITY ENGINEER/PUBLIC WORKS DIRECTOR HEFTI RE: ITEMS FOR SEPTEMBER 20, 1988 COUNGIL PtEETING OLD BUSINESS Post one Bid Opening-0'Leary's Hills 4th Additian, City Project 184 The developer, Steve Broback, was not able to either secure an adequate bond to perform the necessary grading operations or have these operations performed by the time we would open bids for this graject, which was set at Friday, Segtember 16, 1988. Therefore, rather than accepting bids and delaying contract award until grading was complete, I recommend that we postpone the bid opening and wait until we either receive a bond guaranteeing the grading or the grading actually begins befare we go out an advertise for bids again. ��