Loading...
HomeMy WebLinkAbout8.a. Approve Change Order #1, Shannon Parkway, Contract #1987-4• • —Z�efn R a.. DATE: DECEMBER 30, 1987 • r• •s r I 6 1• �• iD, 4 1 I�tti Approve Chancre Order #1, Shannon Parkway, City Contract 1987-4 Change Order #1 provides for a revision of Contract Quantities and unit prices for the installation of the storm sewer within a portion of Shannon Parkway. The reason for these changes resulted from the development of the Carrollton 2nd Addition and its need to transport its storm water run-off. the most direct route for this was to follow the storm sewer that we planned for Shannon Parkway. However, the Shannon Parkway storm sewer had to be increased in size and depth to accam►odate the run-off from the Carrollton 2nd Addition. The increase in size and depth was not included in the original contract because the Carrollton 2nd Addition was only in the preliminary stages and there were a couple of other options at that time. However, once the Carrollton 2nd Addition plans were more finalized it appeared that the most logical route for the storm water to follow was along Shannon Parkway. The increase casts of aversizing and extra depth will be partially the responsibility of the Carrollton 2nd Addition and they have indicated their responsibility in writing. The other aspect of this change order is to extend the substantial completion date from November 14, 1987 to June 11, 1988. The final oompletion date of June 18, 1988 will remain as per original contract. The reason for this extension is due to some difficulties we had in obtaining easements and rights of entries thereby not allowing the contractor to proceed with his work as quickly and in the manner he would have liked to. I am reeamiending to Council to approve Change Order #1 to Contract 1987-4, Shannon Parkway Street Improvements, and authorize the Mayor and City Clerk to execute all related documents. A' CHANCE ORDER ENGINEERS • ARCHITECTS 8 PLANNERS 222 EAST LITTL ECANADA ROAD, ST. PAUL, MINNESOTA 55117 612 484-0272 OWNER City of Rosemount DATE 10-19-87 OWNERS PROJECT NO. 168 & 171 CHANGE ORDER NO. 1 PROJECT DESCRIPTION Shannon Parkway SEH FILE NO. 87122 The following changes shall be made to the contract documents Description: Revise the contract unit price schedule as follows: (See attached sheet) Revise the substantial completion date for all contract work to June 11, 1988 Purpose of Change Order: Basis of Cost: ❑ Actual ❑ Estimated Attachments (list supporting documents) Contract Status Original Contract Net Change Prior C.O.'s to Change this C. 0. Revised Contract Time Cost 11 /141$7—& 6119188 h11-IR8-&-6 8 Recommended for Approval: Short -Elliott -Hendrickson, Inc. By - 21" Agreed to by Contractor: Y Title Approved for Owner. By X\ By k Distribution Contractor 2 Owner 1 Project Representative 1 SEH Office 1 SHORT ELLIOTT ST PAUL, CHIPPEWA FALLS, HENDRICKSON INC. MINNESOTA WISCONSIN City of Rosemount October 16, 1987 Change Order No. 1 SEH File: 87122 EST. UNIT # ITEM UNIT QTY. PRICE 2211.503 Agg. Base Placed, CL 5 (P) CY 8786* 8.18 2211.504 Agg. Base Placed for Wall CL 5 (P) CY 996* 10.23 2503.511 36" RC Pipe Sewer, DES 3006 CL IV LF 1972* 69.99* 2503.511 42" RC Pipe Sewer, Des 3006 CL IV LF 467* 79.18* 2503.608 36" RCP Storm Sewer, Jacked* LF 120 360.02 2506.509 Construct Catch Basin, Design X LF* 132 139.53 * Denotes Revision