HomeMy WebLinkAbout7.d. Approval Final Payment, Connemara Trail, Contract #1987-5•
0 a�.
TO: MAYCR & OGUNCnk
C/o CITY AU43 NISTRATOR JnX
FROM: CITY ENGINEER HEETI
RE: ITEMS Fit THE JANUARY 50, 1988 RFJGU M OM CIL MEETING
OLD BUSINESS
Approve Second and Final Payment, Connemara Trail Street Improvements,
City Contract 1987-5
This is the second and final application for payment for the Connemara Trail
Street Improvement project, City Contract 1987-5. Our Consulting Engineers have
found all work completed under this project to be in compliance with the contract
specifications.
The final oast over ran the contract amount by 9%. The area of cost overrun
occurred in the core excavation and aggregate backfill of the parking lot for the
neighborhood park in Country Hills Addition. The poor subsoil that had to be
removed and replaced under the parking lot was not evident at the time our
Consultants prepared the plans. The surrounding soil conditions appeared
adequate and it was not known until excavating the parking lot for the gravel
base that there would be an isolated pocket of poor subsoil in the area of the
parking lot.
Therefore, I would reaomnerd that Council approve the second and final payment to
McNamara Contracting in the amount of $15,682.52 for Contract 1987-5, Connemara
Trail Street Improvements, and accept the project for perpetual maintenance.
r
CITY OF ROSEMOUNT
APPLICATION FOR PAYMENT
NO.
CITY PROJECT NO: /6,9, SEH FILE NO: V�C�
PROJECT: a h 1-ka.X
CONTRACTOR: CONTRACT DATE:
14-60C JU"!!yCaJ* R� M. APPLICATION DATE:
�jOpla VaA,4e FOR PERIOD ENDING:
Total Contract Amount $ //640/6 8z- Total Amount Earned
Material Suitably Stored on Site,
Not Incorporated into Work
Contract Change Order No. / Percent Complete /Do
Contract Change Order No. Percent Complete
Contract Change Order No. Percent Complete
GROSS AMOUNT DUE ......................
LESS O $ RETAINAGE ...................
AMOUNT DUE TO DATE .. ........ ..
LESS PREVIOUS APPLICATIONS ............
AMOUNT DUE THIS APPLICATION ...........
APPIROVED :
J �
Richard M. H4fti,
City Engineer irector of Public Works
$ / Z`t, .5�Z8 97
$ 1600
$
$-6tSZe 97
17
846 ±r—
s /S, 6 8 Z SL
• •
APPLICATION FOR PAYMENT
-------------------------
(UNIT PRICE CONTRACT)
NO. 2 Final
OWNER ROSEMOUNT, MINNESOTA OWNER'S PROJECT NO. 169
ENGINEER'S PROJECT NO. 87121
----------------
LOCATION: ROSEMOUNT, MINNESOTA
-------------------------------
CONTRACTOR McNAMARA CONTRACTING CO., INC. CONTRACT DATE 8/12/87
14605 JOHNNY CAKE RIDGE RD. CONTRACT AMOUNT $116,016.82
APPLE VALLEY, MN 55124
----- - - -
-------------------- ---
CONTR. FOR CONNEMARA TRAIL STREET CONSTRUCTION.R E C E 117TD
----------------------------------------------SMf3R?FfHff}lrT--iiEf��3f7t('KSCTN iNC---
APPLIC.DATE 11/25/87
------------------------- 140V 30 1987
PERIOD END. 11/25/87
APPLICATION FOR PAYMENT
-----------------------
CONTRACT QUANTITY UNIT
DESCRIPTION UNIT QUANTITY TO DATE PRICE TOTAL
--------------------------------------------------------------------------------
2105.501 COMMON EXCAVATION C.Y. 1500 2,121 1.00 $ 2,121.00
2105.521 GRANULAR BORROW (L.V.) C.Y. 1500 0 3.85 $ -0-
2111.501
TEST ROLLING
RD.STA
21
21
2112.501
SUBGRADE PREPARATION
RD.STA
21
21
2116.501
CORE EXCAVATION
C.Y.
300
2,287
2116.503
AGGREGATE BACKFILL
C.Y.
300
2,673
2211.503 AGGREGATE BASE PLACED, C.Y. 2473 2,677
CL. 5 (P)
0211.504 4" AGG. BASE FOR S.F. 16506 16,506
SIDEWALK, CL. 5 (P)
PAGE 1 OF 3 SHORT-ELLIOTT-HENDRICKSON, INC.
5.00 $ 105.00
100.00 $ 2, 100.00
3.00 $ 6,861.00
5.00 $ 13,365.00
8.40 $ 22,486.80
0.17 $ 2,806.02
59 53.81
1300 1, 195.78
97 90.59
1610 1,647.16
540 613
13
13
10
2331.504
BITUMINOUS MATERIAL FOR
TON
27
MIXTURE
$
2331.514
BASE COURSE MIXTURE
TON
2341.504
BITUMINOUS MATERIAL FOR
TON
-0-
MIXTURE
$
2341.508
WEARING COURSE MIXTURE
TON
2357.502
BITUMINOUS MATERIAL FOR
GAL.
TACK COAT
0504.602
ADJUST VALVE BOX
EACH
2506.511
RECONSTRUCT MANHOLES
L.F.
2506.512
RECONSTRUCT CATCH BASINS
L.F.
2506.522
ADJUST FRAME AND RING
EACH
CASTING
2521.511
2" BITUMINOUS WALK (P)
S.F.
2531.501
CONCRETE CURB & GUTTER,
L.F.
DESIGN B618
2531.507
7" CONCRETE DRIVEWAY
S.Y.
PAVEMENT
2554.505
PERMANENT BARRICADES
L.F.
59 53.81
1300 1, 195.78
97 90.59
1610 1,647.16
540 613
13
13
10
0
10
0
27
28
14672 14,672
3850 4,027
25
150.00 $ 8,071.50
8.50 $ 10, 164.13
150.00 $ 13,588.50
9.50
$
15,648.02
1.00
$
613.00
90.00
$
1,170.00
200.00
$
-0-
200.00
$
-0-
125.00
$
3,500.00
0.30 $ 4,401.60
4.20 $ 16,913.40
20.00 $ 358.00
32 32. 20.50 $ 656.00
PAGE 2 OF 3 SHORT-ELLIOTT-HENDRICKSON, INC.
. APPJWTION FOR PAYMENT - Continued e
Total Contract Amount $ 116,016.82 Total Amount Earned
Material Suitably Stored on.Site, Not Incoporated into Work
Contract Change Order No. I
Contract Change Order No,
Contract Change Order No.
Percent -Complete 100%
Percent Complete
$ 124,928.97
$
b
$ 1,,)1.00.00.
Percent Complete $
S
GROSS AMOUNT DUE ............... $ 126,X28.97
LESS 0 % RETAINAGE......... $ -0-
.r
AMOUNT DUE TO DATE ............. $ 126,X.28.97
LESS PREVIOUS APPLICATIONS..... $ 110,846.45
AMOUNT DUE THIS APPLICATION.... $ 15,182.52 -
CONTRACTOR'S AFFIDAVIT
The undersigned Contractor hereby swears under penalty of perjury that (1) all previous progress.
payments received from the Owner on account of work performed under the contract referred to
above have been applied by the undersigned to discharge in full all obligations of the under-
signed incurred in connection with work covered by prior Applications for Payment under said
contract, and (2) all
material and equipment incorporated in said Project or otherwise listed in or covered by this
Application for Payment are free and clear of all liens, claims, security interests and
encumbrances.
Dated November 25 i9 87 McNamara Contracting Co.
Contractor
By
COUNTY OF Goodhue SS
STATE OF innesota
Before me on this 25th day of November 19 87 personally appeared
Michael J. McNamaraknown to me, who beingduTy sworn, did depose
and say that he is the President of the Contractor above mentioned;
Office
that he executed the above Application for Payment and Affidavit on behalf of said Contractor;
and that all of theF qq _lined therein are true, correct an complete. r
t ICIIAIL H. sAND
My Commission Exp- s: �`1' / i PUBLIC MINNESOTA
COODUUE COUNTY Notary Pu is
COMWIIS�ION EXPIRES 111388
The undersigned has checked the Con ractors Application for Payment shown above. A part of
this Application is the Contractor's Affidavit stating that all previous payments to him
under this Contract have been applied by him to discharge in full all of his obligations in
connection with the work covered by all prior Applications for Payment.
In accordance with the Contract, the undersigned approves payment to the Contractor of the
Amount Due.
Date L_ZZ?/S%
Page 3 of 3
SHORT OTT�ENDRICINC.
By