Loading...
HomeMy WebLinkAbout7.f. Resolution Establising Building Permit FeesCITY nF RnRRMnitNT A RESOLUTION ESTABLISHING BUILDING PERMIT FEES IN THE CITY OF ROSEMOUNT BE IT RESOLVED by the City Council of the City of Rosemount as follows: 1. The City of Rosemount hereby adopts Table No. 3- A ... BUILDING PERMIT FEES, of the Uniform Building Code, 1985 Edition, as its schedule of fees for building permits, attached hereto as Exhibit A. 2. The City of Rosemount also establishes a Plan Check Fee, in the amountof fifty percent (5001o) of the building permit fee, in addition to the. building permit fee, for all building permits for which a plan review is performed. 3. The City of Rosemount further establishes a Plumbing, Heating, Ventilation and Refrigeration Permit Fee Schedule, attached hereto as Exhibit B. Adopted this 2nd day of February, 1988. Rollan Hoke, Mayor ATTEST: Stephan Jilk, Administrator/ Clerk . Exhibit A TABLE NO 3•A—BUILDING PERMIT FEES TOTAL VALUATION FEE J$1 .00 to $500.00 $15.00 $501.00 to $2,000.00 $15.00 for the first $5W.00 plus $20) for each additional $100.00 or fraction thereof, to and including $2,000.00 $2,001.00 to $25,000.00 $45.00 for the first $2.000.00 plus $9.00 for cacti addi- tional $1,000.00 or fraction thereof, to and including $25,OOU.00 $25,001.00 to $50,000.00 $252.00 for the first $25,000.00 plus $6.50 for cacti additional $1,000.00 or fraction thereof, to and including $50,00.00 $50,001.00 to $100,000.00 $414.50 for the first $50,000.00 plus $4.50 for cacti additional $1,000.00 or fraction thereof, to and including $1001000.00 $100,001.00 to $500,000.00 $639.50 for the first $100,000.(X) plus $3.50 for each additional $1,000.00 or fraction thereof $500,001.00 to $2039.50 for the first $500,000,00 plus $3.(H) for each $110001000.00 additional $1.UW.Wor fraction thereof, to and including $1,000.000.00. $1,000,001.00 and up $3539.50 for the first $1,00(),000.()0 plus $2.00 for cacti additional $1,000.00 or fraction thereof Other Inspections and Fees: 1. Inspections outside of normal business hours .................. $30.00 per hour* (minimum charge—two hours) 2. Reinspection fees assessed under provisions of Section 305 (g) .... ........... ............. ...... $30.00 per hour* 3. Inspections for which no fee is specifically indicated ............. . ....................... $30.00 per hour* (minimum charge—one-half hour) 4. Additional plan review required by changes, additions or revisions to approved plans .............................. $30.00 per hour* (minimum charge—one-half hour) *Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall include supervision, overhead, equipment, hourly wages and fringe benefits of the employees involved, UNIFORM BUILDING CODE 1982 EDITION TABLE NO.3-A-BUILDING PERMIT FEES TOTAL VALUATION FEE $1.00 to $500.00 $10.00 $501.00 to $2,000.00 $10.00 for the first $500.00 plus $1.50 for each additional $100.00 or fraction thereof, to and including $2,000.00 $2,001.00 to $25,000.00 $32.50 for the first $2,000.00 plus $6.00 for each addi- tional $1,000.00 or fraction thereof, to and including $25,000.00 , $25,001.00 to $50,000.00 $170.50 for the first $25,000.00 plus $4.50 for each additional $1,000.00 or fraction thereof, to and including $50,000.00 $50,001.00 to $100,000.00 $283.00 for the first $50,000.00 plus $3.00 for each additional $1,000.00 or fraction thereof, to and including $100,000.00 $100,001.00 and up $433.00 for the first $100,000.00 plus $2.50 for each additional $1,000.00 or fraction thereof Other Inspections and Fees: 1. Inspections outside of normal business hours ................... $1.5.00 per hour (minimum charge—two hours) 2. Reinspection fee assessed under provisions of Section 305 (8) . ...... ................. .............. . $15.00 each 3. Inspections for which no fee is specifically indicated . ........ ...................... .. $15.00 per hour (minimum charge=one-half hour) 4. Additional plan review required by changes, additions or revisions to approved plans ................................ $15.00 per hour (minimum charge—one-half hour) i Exhibit B i -- Plumbing, Heating, Ventilating & Air Conditioning Fees Single Family Dwelling New Construction $ 40.00 Fee .50 Surcharge $ 40.50 TOTAL Alteration/ Repair $ 20.00 Fee .50 Surcharge $ 20.50 TOTAL Multiple Housing f4 or less units) New Construction $ 40.00 Fee .50 Surcharge $ 40.50 TOTAL PER UNIT Alteration/ Repair $ 20.00 Fee .50 Surcharge $ 20.50 TOTAL PER UNIT Multiple Housing (5 or more units) New Construction $ 20.00 per unit .50 Surcharge $ 20.50 TOTAL PER UNIT Alteration/ Repair $ 20.00 Fee .50 Surcharge $ 20.50 TOTAL PER UNIT Commercial/ Industrial/ Institutional One percent (lib) of Valuation plus $ .0005 Surcharge $ 40.00 Minimum Fee plus $ .0005 Surcharge i i . Exhibit B Sewer & Water installation Permit Fees Municipal Service New Construction $ 30.00 Fee .50 Surcharge $ 30.50 TOTAL Alteration/ Repair $ 15.00 Fee .50 Surcharge $ 15.50 TOTAL Private Sewer New Construction $ 50.00 Fee .50 Surcharge $ 50.50 TOTAL Repair/Replace $ 30.00 Fee (Utilizing Existing Tank) .50 Surcharge $ 30.50 TOTAL Exhibit 6 4— Prefabricated Structures & Manufactured Homes Prefabricated Structures Fees based upon building valuation according to U.B.C. Table 3A. Manufactured Homes * New Home Setup $ 30.00 Fee .50 Surcharge $ 30.50 TOTAL Repair/Replace $ 15.00 Fee (Utilizing Existing Tank) .50 Surcharge $ 15.50 TOTAL *This fee is in addition to sewer hook-up fees. PLUMBINI =W=EATING, VENTILATION & REFRIGE ON PERMIT=FEE=SCHEDULE SingleFamily Dwelling New Construction - $ 30.00 Fee .50 Surcharge $ 30.50 TOTAL Alteration/Repair - $ 15.00 Fee .50 Surcharge $ 15.50 TOTAL Multiple Housing (4 or less units) New Construction - $ 30.00 Fee per unit .50 Surcharge per unit $ 30.50 TOTAL PER UNIT Alteration/Repair - $ 15.00 Fee per unit .50 Surcharge per unit $ 15.50 TOTAL PER UNIT Multiple Housing (5 or more units) New Construction - $ 15.00 Fee per unit .50 Surcharge per unit $ 15.50 TOTAL; PER UNIT Alteration/Repair - $ 15.00 Fee per unit .50 Surcharge per unit $ 15.50 TOTAL PER UNIT Commercial /Industrial 1% of valuation plus $ .50 surcharge SEWER & WATER INSTALLATION PERMIT FEES New Construction - $ 30.00 Fee .50 Surcharge $ 30.50 TOTAL Alteration/Repair - $ 15.00 Fee .50 Surcharge $ 15.50 TOTAL f �tern � CITY OF ROSEMOUNT RESOLUTION 1988- A RESOLUTION ESTABLISHING A FEE SCHEDULE FOR ELECTRICAL PERMITS IN THE CITY OF ROSEMOUNT WHEREAS, the City of Rosemount has adopted the Rosemount City Code, which establishes provisions for Electrical Installation Regulations in Title 9, Chapter 3. NOW THEREFORE BE IT RESOLVED, the City Council of the City of Rosemount hereby adopts the fee schedule for electrical permits as attached hereto as Exhibit A and made part of this Resolution. Adopted this 2nd day of February, 1988. Rollan Hoke, Mayor ATTEST: Stephan Jilk, Administrator/Clerk y Exhibit A February 2, 1988- * Fee Schedule for Electrical Permits City of Rosemount 2875 145th Street West P.O. Box 510 Rosemount, MN 55068 A. Minimum fee for each separate inspection of an installation, $ 15.00 replacement, alteration or repair limited to one inspection only. B. Services, changes of service, temporary services, additions, alterations or repairs on either primary or secondary services shall be computed separately. 0 to 100 Ampere Capacity $ 15.00 101 to and including 200 Ampere Capacity $ 18.00 For each additional 100 Ampere Capacity or fraction thereof $ 8.00 C. Circuit, installation of, additions, alterations or repairs of each circuit or sub -feeder shall be computed separately, including circuits fed from sub -feeders and including the equipment served, except as provided for in Items D through J 0 to and including 30 Ampere Capacity $ 4.00 _ (maximum number of 1-30 ampere circuits to be paid on is 30 to any one cabinet) 31 to and including 100 Ampere Capacity $ 6.00 For each additional 100 ampere capacity or fraction thereof $ 4.00 D. The maximum fee on an apartment building shall not exceed $35.00per dwelling unit for the first twenty (20) units and $30.00 per dwelling unit for the balance of the units. E. The maximum number of 0 to 30 ampere circuits to be paid on any athletic field lighting standard is ten (10). F. In addition to the above fees: 1. A charge of $2.00 will be made for each street` lighting standard. 2. A charge of $3.00 will be made for each traffic signal standard. Circuits originating within the standard will not be used when computing fees. G. In addition to the above fees: 1. All transformers and generators for light, heat and power will be computed separately at $5.00 per unit plus $ .25 per KVA up to and including 100 KVA. 2. 101 KVA and over will be computed at $ .20 per KVA. 1 City of Rosemount Electrical Fee Schedule February 2, 1988 • H. In addition to the above fees: 1. All transformers for signs and outline lighting shall be computed at $4.00 for the first 500VA or fraction thereof per unit, plus $ .40 for each additional 100VA or fraction thereof. I. In addition to the above fees (unless included in the fee filed by the initial installer): 1. Remote control, signal circuits and circuits of less than 50 volts shall be computed at $6.00 per each ten (10) openings or devices of each system plus $ .50 for each additional opening. J. For review of plans and specifications of proposed installations there shall be a minimum fee of $100.00 up to and including $30,000 of electrical estimate, plus 1/10 of one percent (117r,) on any amount in excess of $30,000 to be paid by persons or firms requesting the review. K. When re -inspection is necessary to determine whether unsafe conditions have been corrected and such conditions are not subject of an appeal pending before any court, a re -inspection fee of $15.00 may be assessed in writing by the inspector. L. For inspections not covered herein, or for requested special inspections or services, the fee of $22.00 per man hour, including travel time, plus $ .22 per mile traveled, plus the reasonable cost of equipment or material consumed. This section is also applicable to inspection of empty conduits and such jobs as determined by the City. M. For inspection of transient projects including, but not limited to, carnivals and circuses the inspection fees shall be computed as follows: 1. Power supply units according to Item B. of fee schedule. A like fee will be required on power supply units at each engagement during the season, except that a fee of $22.00 will be charged for additional time spent by the inspector if the power supply is not ready for inspection at the time and date' specified on the Request for Inspection as rcquired by law. 2. Rides, devices or concessions shall be inspected at their first appearance of the season and the inspection fee shall be $15.00 per unit. N. Fees for services, feeders and circuits operating at over 250 volts shall be double those listed in Items B and C above. *Add $ .50 surcharge fee for each permit submitted. Id<)::1 ".I1i11fJl. `.11-.r:Jl t.)t•', `S',iu,N )SC1111 0I i) I FEE SCHEDULE FOR ELECTRICAL PERMITS A. Minimum fee for each separate inspection of an installation, replace- ment, alteration or repair limited to one inspection only . $ 8.00 B. Services, changes of service, temporary services, additions, altera- tions, or repairs on either primary or secondary services shall be computed separately: 1. 0 to 100 ampere capacity . . . . . . . . . . . . $ 13.00 2. 141 to and including 200 ampere capacity : . . . . . $ 16 For each additional 100 ampere capacity or fraction thereof . . . . . . . . . . . . . . . . . . . $ 7.00 C. Circuit, installations of, additions, alterations or repairs of each circuit or sub -feeder shall be computed separately, including circuits fed from sub -feeders and including the equipment served, except as provided for in items D through J 1. 0 to and including 30 ampere capacity . . . . . . . . . $ 3:25 (maximum number of 0 to 30 ampere circuits to be paid on is 30 to any one cabinet) 2. 31 to and including 100 ampere capacity . . . . . $ 5.00 3. For each additional 100 ampere capacity or fraction thereof $ D. Maximum fee on a single family dwelling shall not exceed $50.00 if not over 200 ampere capacity. This includes service, feeders, circuits, fixtures and equipment. The maximum fee provides for not more than two rough -in inspections and the final inspection per dwelling. Additional inspections at the re -inspection rate. E. Maximum fee on an apartment building shall not exceed $25.00 per dwelling unit for the first 20 units and $20.00 per dwel ing unit for the balance of the units. A two -unit dwelling (duplex), maximum fee per unit as per single family dwelling. F. The maximum number of 0 to 30 ampere circuits to be paid on any one Athletic Field lighting standard is ten. G. In addition to the above fees: 1. A charge of $1.00 will be made for each street lighting standard. 2. A charge of $2.00 will be made for each traffic signal standard. Circuits originating within the standard will not be used when computing fees. H. In addition to the above fees, all transformers and generators for light, heat and power shall be computed separately at $4.00 per unit plus 20t per KVA up to and including 100 KVA. 101 KVA an- over at 15t per KV -A. The maximum fee for any transformer or generator in this category is $40.00. Fee Schedule for El Orical Permits Page Two i I. In addition to the above fees, all transformers for signs and outline lighting shall be computed at $3.00 for the first 500 VA or fraction thereof per unit, plus 30¢ for eacN additional 100 VA or fraction thereof. J. In addition to the above fees (unless included in the maximum fee filed by the initial installer) remote control, signal circuits and circuits of less than 50 volts shall be computed at $3.00 per each ten openings or devices of each system plus $1.00 for each additional ten or fraction thereof. K. For the review of plans and specifications of proposed installations, there shall be a minimum fee of'$100.00 up to and including $30,000 of electrical estimate, plus 1/10 of to on any amount in excess of $30,000 to be paid by persons or firms requesting the review. L. When re -inspection is necessary to determine whether unsafe conditions have been corrected and such conditions are no subject of an appeal pending before any court, a re -inspection fee of $8.00 may be assessed in writing by the inspector. M. For inspections not covered herein, or for requested special inspections or services, the fee shall be $14.00 per man hour, including travel time, plus 16t per mile traveled, plus tie reasonable cost of equipment or mateaconsumed. This section is also applicable to inspection of empty conduits and such jobs as determined by the City. N. For inspection of transientprojectsincluding but not limited to carni- vals and circuses the inspection fees shall be computed as follows: 1. Power supply units according to item B of the Fee Schedule. A like fee will be required on power supply units at each engage- ment during the season, except that a fee of $14.00 per hour will be charged for additional time spent byte inspector, if the power supply is not ready for inspection at the time and date specified on the request for inspection as required by law. 2. Rides, Devices or Concessions: Shall be inspected at their first appearance of the season and the inspection fee shall be $8.00 per unit.