A RESOLUTION ESTABLISHING BUILDING
PERMIT FEES IN THE CITY OF ROSEMOUNT
BE IT RESOLVED by the City Council of the City of Rosemount
as follows:
1. The City of Rosemount hereby adopts Table No. 3-
A ... BUILDING PERMIT FEES, of the Uniform Building
Code, 1985 Edition, as its schedule of fees for building
permits, attached hereto as Exhibit A.
2. The City of Rosemount also establishes a Plan Check
Fee, in the amountof fifty percent (5001o) of the building
permit fee, in addition to the. building permit fee, for all
building permits for which a plan review is performed.
3. The City of Rosemount further establishes a Plumbing,
Heating, Ventilation and Refrigeration Permit Fee
Schedule, attached hereto as Exhibit B.
Adopted this 2nd day of February, 1988.
Rollan Hoke, Mayor
ATTEST:
Stephan Jilk, Administrator/ Clerk
. Exhibit A
TABLE NO 3•A—BUILDING PERMIT FEES
TOTAL VALUATION
FEE
J$1 .00 to $500.00
$15.00
$501.00 to $2,000.00
$15.00 for the first $5W.00 plus $20) for each additional
$100.00 or fraction thereof, to and including $2,000.00
$2,001.00 to $25,000.00
$45.00 for the first $2.000.00 plus $9.00 for cacti addi-
tional $1,000.00 or fraction thereof, to and including
$25,OOU.00
$25,001.00 to $50,000.00
$252.00 for the first $25,000.00 plus $6.50 for cacti
additional $1,000.00 or fraction thereof, to and including
$50,00.00
$50,001.00 to $100,000.00
$414.50 for the first $50,000.00 plus $4.50 for cacti
additional $1,000.00 or fraction thereof, to and including
$1001000.00
$100,001.00 to $500,000.00
$639.50 for the first $100,000.(X) plus $3.50 for each
additional $1,000.00 or fraction thereof
$500,001.00 to
$2039.50 for the first $500,000,00 plus $3.(H) for each
$110001000.00
additional $1.UW.Wor fraction thereof, to and including
$1,000.000.00.
$1,000,001.00 and up
$3539.50 for the first $1,00(),000.()0 plus $2.00 for cacti
additional $1,000.00 or fraction thereof
Other Inspections and Fees:
1. Inspections outside of normal business hours .................. $30.00 per hour*
(minimum charge—two hours)
2. Reinspection fees assessed under provisions of
Section 305 (g) .... ........... ............. ...... $30.00 per hour*
3. Inspections for which no fee is specifically
indicated ............. . ....................... $30.00 per hour*
(minimum charge—one-half hour)
4. Additional plan review required by changes, additions
or revisions to approved plans .............................. $30.00 per hour*
(minimum charge—one-half hour)
*Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall include
supervision, overhead, equipment, hourly wages and fringe benefits of the employees
involved,
UNIFORM BUILDING CODE 1982 EDITION
TABLE NO.3-A-BUILDING PERMIT FEES
TOTAL VALUATION
FEE
$1.00 to $500.00
$10.00
$501.00 to $2,000.00
$10.00 for the first $500.00 plus $1.50 for each additional
$100.00 or fraction thereof, to and including $2,000.00
$2,001.00 to $25,000.00
$32.50 for the first $2,000.00 plus $6.00 for each addi-
tional $1,000.00 or fraction thereof, to and including
$25,000.00 ,
$25,001.00 to $50,000.00
$170.50 for the first $25,000.00 plus $4.50 for each
additional $1,000.00 or fraction thereof, to and including
$50,000.00
$50,001.00 to $100,000.00
$283.00 for the first $50,000.00 plus $3.00 for each
additional $1,000.00 or fraction thereof, to and including
$100,000.00
$100,001.00 and up
$433.00 for the first $100,000.00 plus $2.50 for each
additional $1,000.00 or fraction thereof
Other Inspections and Fees:
1. Inspections outside of normal business hours ................... $1.5.00 per hour
(minimum charge—two hours)
2. Reinspection fee assessed under provisions of
Section 305 (8) . ...... ................. .............. . $15.00 each
3. Inspections for which no fee is specifically
indicated . ........ ...................... .. $15.00 per hour
(minimum charge=one-half hour)
4. Additional plan review required by changes, additions
or revisions to approved plans ................................ $15.00 per hour
(minimum charge—one-half hour)
i
Exhibit B i
-- Plumbing, Heating, Ventilating
& Air Conditioning Fees
Single Family Dwelling
New Construction
$ 40.00
Fee
.50
Surcharge
$ 40.50
TOTAL
Alteration/ Repair
$ 20.00
Fee
.50
Surcharge
$ 20.50
TOTAL
Multiple Housing f4 or less units)
New Construction
$ 40.00
Fee
.50
Surcharge
$ 40.50
TOTAL PER UNIT
Alteration/ Repair
$ 20.00
Fee
.50
Surcharge
$ 20.50
TOTAL PER UNIT
Multiple Housing (5 or more units)
New Construction
$ 20.00
per unit
.50
Surcharge
$ 20.50
TOTAL PER UNIT
Alteration/ Repair
$ 20.00
Fee
.50
Surcharge
$ 20.50
TOTAL PER UNIT
Commercial/ Industrial/ Institutional
One percent (lib) of Valuation plus $ .0005 Surcharge
$ 40.00 Minimum Fee plus $
.0005 Surcharge
i
i
.
Exhibit B
Sewer & Water installation Permit Fees
Municipal Service
New Construction
$ 30.00
Fee
.50
Surcharge
$ 30.50
TOTAL
Alteration/ Repair
$ 15.00
Fee
.50
Surcharge
$ 15.50
TOTAL
Private Sewer
New Construction
$ 50.00
Fee
.50
Surcharge
$ 50.50
TOTAL
Repair/Replace
$ 30.00
Fee
(Utilizing Existing Tank)
.50
Surcharge
$ 30.50
TOTAL
Exhibit 6
4— Prefabricated Structures & Manufactured Homes
Prefabricated Structures
Fees based upon building valuation according to U.B.C. Table 3A.
Manufactured Homes
* New Home Setup $ 30.00 Fee
.50 Surcharge
$ 30.50 TOTAL
Repair/Replace $ 15.00 Fee
(Utilizing Existing Tank) .50 Surcharge
$ 15.50 TOTAL
*This fee is in addition to sewer hook-up fees.
PLUMBINI
=W=EATING, VENTILATION &
REFRIGE ON
PERMIT=FEE=SCHEDULE
SingleFamily Dwelling
New Construction -
$
30.00
Fee
.50
Surcharge
$
30.50
TOTAL
Alteration/Repair
- $
15.00
Fee
.50
Surcharge
$
15.50
TOTAL
Multiple Housing (4 or less
units)
New Construction -
$
30.00
Fee per unit
.50
Surcharge per unit
$
30.50
TOTAL PER UNIT
Alteration/Repair
- $
15.00
Fee per unit
.50
Surcharge per unit
$
15.50
TOTAL PER UNIT
Multiple Housing (5 or more
units)
New Construction
- $
15.00
Fee per unit
.50
Surcharge per unit
$
15.50
TOTAL; PER UNIT
Alteration/Repair
- $
15.00
Fee per unit
.50
Surcharge per unit
$
15.50
TOTAL PER UNIT
Commercial /Industrial
1% of valuation plus
$ .50 surcharge
SEWER & WATER
INSTALLATION
PERMIT FEES
New Construction -
$
30.00
Fee
.50
Surcharge
$
30.50
TOTAL
Alteration/Repair
- $
15.00
Fee
.50
Surcharge
$
15.50
TOTAL
f
�tern �
CITY OF ROSEMOUNT
RESOLUTION 1988-
A RESOLUTION ESTABLISHING A FEE SCHEDULE
FOR ELECTRICAL PERMITS IN THE CITY OF ROSEMOUNT
WHEREAS, the City of Rosemount has adopted the Rosemount City
Code, which establishes provisions for Electrical Installation
Regulations in Title 9, Chapter 3.
NOW THEREFORE BE IT RESOLVED, the City Council of the City
of Rosemount hereby adopts the fee schedule for electrical permits
as attached hereto as Exhibit A and made part of this Resolution.
Adopted this 2nd day of February, 1988.
Rollan Hoke, Mayor
ATTEST:
Stephan Jilk, Administrator/Clerk
y
Exhibit A
February 2, 1988-
* Fee Schedule for Electrical Permits
City of Rosemount
2875 145th Street West
P.O. Box 510
Rosemount, MN 55068
A.
Minimum fee for each separate inspection of an installation, $ 15.00
replacement, alteration or repair limited to one inspection only.
B.
Services, changes of service, temporary services, additions, alterations
or repairs on either primary or secondary services shall be computed
separately.
0 to 100 Ampere Capacity $ 15.00
101 to and including 200 Ampere Capacity $ 18.00
For each additional 100 Ampere Capacity or fraction thereof $ 8.00
C.
Circuit, installation of, additions, alterations or repairs of each circuit
or sub -feeder shall be computed separately, including circuits fed from
sub -feeders and including the equipment served, except as provided for
in Items D through J
0 to and including 30 Ampere Capacity $ 4.00
_
(maximum number of 1-30 ampere circuits to be paid on is 30 to any
one cabinet)
31 to and including 100 Ampere Capacity $ 6.00
For each additional 100 ampere capacity or fraction thereof $ 4.00
D.
The maximum fee on an apartment building shall not exceed $35.00per dwelling
unit for the first twenty (20) units and $30.00 per dwelling unit for the balance
of the units.
E.
The maximum number of 0 to 30 ampere circuits to be paid on any athletic field
lighting standard is ten (10).
F.
In addition to the above fees:
1. A charge of $2.00 will be made for each street` lighting standard.
2. A charge of $3.00 will be made for each traffic signal standard. Circuits
originating within the standard will not be used when computing fees.
G.
In addition to the above fees:
1. All transformers and generators for light, heat and power will be computed
separately at $5.00 per unit plus $ .25 per KVA up to and including 100 KVA.
2. 101 KVA and over will be computed at $ .20 per KVA.
1
City of Rosemount
Electrical Fee Schedule
February 2, 1988
•
H. In addition to the above fees:
1. All transformers for signs and outline lighting shall be computed at $4.00 for
the first 500VA or fraction thereof per unit, plus $ .40 for each additional
100VA or fraction thereof.
I. In addition to the above fees (unless included in the fee filed by the initial
installer):
1. Remote control, signal circuits and circuits of less than 50 volts shall be
computed at $6.00 per each ten (10) openings or devices of each system plus
$ .50 for each additional opening.
J. For review of plans and specifications of proposed installations there shall be a
minimum fee of $100.00 up to and including $30,000 of electrical estimate, plus
1/10 of one percent (117r,) on any amount in excess of $30,000 to be paid by
persons or firms requesting the review.
K. When re -inspection is necessary to determine whether unsafe conditions have been
corrected and such conditions are not subject of an appeal pending before any
court, a re -inspection fee of $15.00 may be assessed in writing by the inspector.
L. For inspections not covered herein, or for requested special inspections or
services, the fee of $22.00 per man hour, including travel time, plus $ .22 per
mile traveled, plus the reasonable cost of equipment or material consumed. This
section is also applicable to inspection of empty conduits and such jobs as
determined by the City.
M. For inspection of transient projects including, but not limited to, carnivals and
circuses the inspection fees shall be computed as follows:
1. Power supply units according to Item B. of fee schedule. A like fee will be
required on power supply units at each engagement during the season, except
that a fee of $22.00 will be charged for additional time spent by the
inspector if the power supply is not ready for inspection at the time and date'
specified on the Request for Inspection as rcquired by law.
2. Rides, devices or concessions shall be inspected at their first appearance of
the season and the inspection fee shall be $15.00 per unit.
N. Fees for services, feeders and circuits operating at over 250 volts shall be double
those listed in Items B and C above.
*Add $ .50 surcharge fee for each permit submitted.
Id<)::1 ".I1i11fJl. `.11-.r:Jl t.)t•', `S',iu,N
)SC1111 0I i) I
FEE SCHEDULE FOR ELECTRICAL PERMITS
A. Minimum fee for each separate inspection of an installation, replace-
ment, alteration or repair limited to one inspection only . $ 8.00
B. Services, changes of service, temporary services, additions, altera-
tions, or repairs on either primary or secondary services shall be
computed separately:
1. 0 to 100 ampere capacity . . . . . . . . . . . . $ 13.00
2. 141 to and including 200 ampere capacity : . . . . . $ 16
For each additional 100 ampere capacity or fraction
thereof . . . . . . . . . . . . . . . . . . . $ 7.00
C. Circuit, installations of, additions, alterations or repairs of
each circuit or sub -feeder shall be computed separately, including
circuits fed from sub -feeders and including the equipment served,
except as provided for in items D through J
1. 0 to and including 30 ampere capacity . . . . . . . . . $ 3:25
(maximum number of 0 to 30 ampere circuits to be paid on is
30 to any one cabinet)
2. 31 to and including 100 ampere capacity . . . . . $ 5.00
3. For each additional 100 ampere capacity or fraction thereof $
D. Maximum fee on a single family dwelling shall not exceed $50.00 if
not over 200 ampere capacity. This includes service, feeders,
circuits, fixtures and equipment. The maximum fee provides for
not more than two rough -in inspections and the final inspection
per dwelling. Additional inspections at the re -inspection rate.
E. Maximum fee on an apartment building shall not exceed $25.00 per
dwelling unit for the first 20 units and $20.00 per dwel ing unit
for the balance of the units. A two -unit dwelling (duplex), maximum
fee per unit as per single family dwelling.
F. The maximum number of 0 to 30 ampere circuits to be paid on any one
Athletic Field lighting standard is ten.
G. In addition to the above fees:
1. A charge of $1.00 will be made for each street lighting standard.
2. A charge of $2.00 will be made for each traffic signal standard.
Circuits originating within the standard will not be used when
computing fees.
H. In addition to the above fees, all transformers and generators for light,
heat and power shall be computed separately at $4.00 per unit plus 20t
per KVA up to and including 100 KVA. 101 KVA an- over at 15t per KV -A.
The maximum fee for any transformer or generator in this category is $40.00.
Fee Schedule for El Orical Permits
Page Two
i
I. In addition to the above fees, all transformers for signs and outline
lighting shall be computed at $3.00 for the first 500 VA or fraction
thereof per unit, plus 30¢ for eacN additional 100 VA or fraction
thereof.
J. In addition to the above fees (unless included in the maximum fee
filed by the initial installer) remote control, signal circuits and
circuits of less than 50 volts shall be computed at $3.00 per each
ten openings or devices of each system plus $1.00 for each additional
ten or fraction thereof.
K. For the review of plans and specifications of proposed installations,
there shall be a minimum fee of'$100.00 up to and including $30,000
of electrical estimate, plus 1/10 of to on any amount in excess of
$30,000 to be paid by persons or firms requesting the review.
L. When re -inspection is necessary to determine whether unsafe conditions
have been corrected and such conditions are no subject of an appeal
pending before any court, a re -inspection fee of $8.00 may be assessed
in writing by the inspector.
M. For inspections not covered herein, or for requested special inspections
or services, the fee shall be $14.00 per man hour, including travel time,
plus 16t per mile traveled, plus tie reasonable cost of equipment or
mateaconsumed.
This section is also applicable to inspection of empty conduits and such
jobs as determined by the City.
N. For inspection of transientprojectsincluding but not limited to carni-
vals and circuses the inspection fees shall be computed as follows:
1. Power supply units according to item B of the Fee Schedule. A
like fee will be required on power supply units at each engage-
ment during the season, except that a fee of $14.00 per hour
will be charged for additional time spent byte inspector, if
the power supply is not ready for inspection at the time and
date specified on the request for inspection as required by law.
2. Rides, Devices or Concessions: Shall be inspected at their
first appearance of the season and the inspection fee shall
be $8.00 per unit.