HomeMy WebLinkAbout6.e. Receive Feasibility Report / Set Public Hearing, Valley Oaks Phase III ImprovementsDATE: FEBRUARY 9, 1988
TO: MAYOR & COUNCILMEMBERS
C/O ADMINISTRATOR JILK
FROM: CITY ENGINEER/PUBLIC WORKS DIRECTOR HEFTI
(]�I'
RE: ITEMS FOR THE FEBRUARY 16, 1988 COUNCIL MEETING
NEW BUSINESS
Project 4180, Receive Feasibility Report/Order Public Hearing for
Valley Oak Replat, Phase III Improvements
January 5, 1988 Council received a petition -from the developer of the Valley Oak
Replat Addition to prepare a feasibility report on the installation of public
streets and utilities for Phase III of this development. Our Consulting Engineer
has completed the feasibility report, a copy of which is attached, and found the
project feasible to construct. The next step for Council is to schedule a public
hearing at which Council will listen to concerns and input from the public that
this project affects. Staff would recommend setting this date and time at 8:00
p.m., Tuesday, March 15, 1988. This will allow Staff time to met all legal
deadlines for Published and Mail Notice of this project.
Therefore, Staff would recommend that Council accept the feasibility report for
Project 4180, Valley Oak Replat-Phase III Public Improvements -and order a Public
Hearing to be held on March 15, 1988 at 8:00 p.m.
0 0
CITY OF ROSEMOUNT
RESOLUTION 1988 -
A RESOLUTION CALLING FOR PUBLIC HEARING TO CONSIDER
CITY PROJECT #180, VALLEY OAK ADDITION REPLAT-PHASE III
STREET AND UTILITY IMPROVEMENTS
WHEREAS, the City Council deemed it necessary and expedient that the City of
Rosemount, Minnesota, construct certain improvements, to -wit: City Project #180,
Valley Oak Addition Replat-Phase III Street and Utility Improvements, in the City
as described in and in accordance with the feasibility report prepared by Short -
Elliott -Hendrickson, Inc., Consulting Engineers; and
WHEREAS, the City Council has been advised by the Consulting Engineers that said
installation of street and utilities., City Project #180, is feasible, and should
best be made as proposed, and the Consulting Engineers' report to this effect has
heretofore been received by Council, and filed with the Administrator/Clerk on
February 16, 1988; and
WHEREAS, the statute provided that no such improvements shall be made until the
Council has held a public hearing on such improvements following mailed notice
and two publications thereof in the official newspaper stating time and place of
the hearing, the general nature of the improvement, the estimated costs thereof,
and the area proposed to be assessed, in accordance with the law.
NOW THEREFORE BE IT RESOLVED, by the City Council of the City of Rosemount that a
public hearing be scheduled to consider City Project #180, Valley Oak Addition
Replat-Phase III Street and Utility Improvements to be held on Tuesday, March 15,
1988 at 8:00 o'clock p.m. in the Council Chambers of City Halla
ADOPTED this 16th day of February, 1988.
Rollan Hoke, Mayor
ATTEST:
Stephan Jilk, Administrator/Clerk
FEASIBILITY REPORT
FOR
STREETS AND UTILITIES
IN
PHASE III
VALLEY OAK ADDITION
ROSEMOUNT, MINNESOTA
CITY PROJECT NO. 180
SEH FILE NO: 88131
I hereby certify that this report was prepared
by me or under my direct supervision and that I
am a duly Registered Professional Engineer under
the laws of the State of Minnesota.
DATE: Z� II / P18 REG. NO. 12691
REVIEWED BY:
DATE:
ENGINEERS ■ ARCHITECTS ■PLANNERS
February 9, 1988
222 EAST LITTLE CANADA ROAD, ST PAUL, MINNESOTA SS117 612 484-0272
RE: ROSEMOUNT, MINNESOTA
VALLEY OAK ADDN. - PHASE III
STREETS AND UTILITIES
SEH FILE NO: 88131
City of Rosemount
2875 145th Street West
Rosemount, MN 55068
Attn: Rich Hefti, Director of Public Works
Gentlemen:
In accordance with your authorization we have prepared the
attached feasibility report for utility and street construction
in Phase III of Valley Oak Addition. This report discusses
sanitary sewer, watermain, drainage, streets, and street lighting
improvements, and provides cost estimates for each.
We would be pleased to review this report with you in detail.
Sincerely,
SHORT-ELLIOTT-HENDRICKSON, INC.
Steve Campbell
SDC/cih
Enclosure
SHORT ELLIOTT ST. PAUL, CHIPPEWA FALLS,
HENDRICKSON INC. MINNESOTA WISCONSIN
PART 1
INTRODUCTION
1.1 AUTHORIZATION
On January 5, 1988, the Rosemount City Council upon petition
by the owner, authorized the preparation of an Engineering
Feasibility Report for utility and street construction in
Phase III of Valley Oak Addition. This project has been
designated as City Project No. 180.
1.2 SCOPE
The purpose of this report is to study, make recommendations
and provide cost estimates for the construction of sanitary
sewer, watermain, storm sewer, street and street lighting
facilities in Phase III of Valley Oak Addition.
1.3 DATA AVAILABLE
The information and materials used in the preparation of
this report include:
1. Final plat of Valley Oak Addition.
2. Grading plan of Valley Oak Addition (August 17, 1979).
3. City of Rosemount construction record drawings.
1.4 GENERAL BACKGROUND
The project district is located in the north half of the
southeast quarter of Section 31 in the previously platted
Valley Oak Addition. The project area includes 27 single
family residential lots located along 156th Street and
Columbary Court as shown on Drawing No. 1. Trunk utilities
have been installed in the project district on previous
projects. For the purpose of this report it is assumed that
all street and site grading will be completed by the owner.
1 - 1
PART 2
PROPOSED IMPROVEMENTS
2.1 SANITARY SEWER
Proposed sanitary sewer facilities are shown on Drawing No.
2. These facilities include the westerly extension of an 8"
PVC service main from the existing 12" RCP located in 156th
Street and the construction of 8" PVC stub sewers for future
extension at Columbia Court and Crestone Path. The existing
trunk 12" RCP will provide service to Columbary Court and
the easterly portion of 156th Street.
The proposed facilities also include the extension of 4" PVC
services to each lot from the proposed service and existing
trunk mains. Where frontage is provided by the trunk mains,
the services will be connected to inplace risers.
2.2 WATERMAIN
Proposed watermain facilities are shown on Drawing No. 3.
These facilities include the construction of 6" DIP stubs
for future extension at Columbia Court and Crestone Path.
156th Street and Columbia Court will be served by existing
16" trunk and 6" service mains respectively. The proposed
facilities will also include the extension of 1" copper
services to each lot from the existing mains.
2.3 DRAINPGE
Proposed storm sewer facilities are shown on Drawing No. 4.
These facilities include the westerly extension of 30" RCP
from the existing manhole on 156th Street to Columbia Court,
the westerly extension of a 12" RCP from Columbia Court to
Crestone Path and the northerly extension of a 27" stub from
156th Street. The 27 stub will ultimately be extended
-along Columbia Court and connected to and transmit flows
from the existing 27" discharge from Shannon Parkway.
2 - 1
PART 3
COST ESTIMATES
Detailed cost estimates for all improvements proposed herein are
included in the Appendix of this report. These estimates are
based on projected, 1988 unit costs and include allowances for
contingencies and anticipated overhead costs. These estimates do
not include any costs for street or site grading. A summary of
these costs is as follows:
Sanitary Sewer $ 30,000
Watermain 20,000
Storm Sewer 40,000
Street Construction 75,000
Street Lighting 12,000
Total $177,000
In addition to the above costs, Phase III shall also be
responsible for the cost of lateral benefits from the core
facilities installed under City Project 154, Contract 1985-3 that
were not assessed to the 22 lots included with the Phase II
development. These costs amount to $56,958.
3 - 1
PART 4
PROJECT DISTRICT
The following parcels of
land are included in the project
district:
Valley Oak
Addition Replat
Block
2, Lots 5-14 and
Lots 30-35
Block
3, Lot 1
Block
4, Lots 12-21
4 1
PART 5
FEASIBILITY
We find that the improvements described herein are feasible and
recommend that they be constructed in general compliance with the
provisions of this report.
5 - 1
ESTIMATE OF COST
SANITARY SEWER
CITY PROJECT NO. 180
ROSEMOUNT, MINNESOTA
T
ITEM
UNIT
NO. DESCRIPTION
UNIT
QUANTITY
PRICE
AMOUNT
0256.408 8" PVC, 12'-14' DEEP
L.F.
600
$15.00
$ 9,000
0256.408 8" PVC, 14'-16' DEEP
L.F.
150
17.00
2,550
0256.701 STANDARD MANHOLE,
8' DEEP
EACH
4
1,000.00
4,000
0256.702 EXCESS DEPTH STANDARD
MANHOLE
L.F.
15
75.00
1,125
0256.801 8" BY 4" PVC WYE
40.00
EACH
15
600
0256.803 4" PVC SERVICE
L.F.
1,100
5.00
5,500
0256.900 CONNECT TO EXISTING
SEWER
EACH
1
300.00
300
SUBTOTAL
$23,075
+10$ CONTINGENCIES
1,925
ESTIMATED CONSTRUCTION COST
$25,000
+20$ OVERHEAD & ENGINEERING
5,000
TOTAL ESTIMATED COST
$30,000
i
ESTIMATE OF COST
WATERMAIN
CITY PROJECT NO. 180
ROSEMOUNT, MINNESOTA
ITEM
UNIT
NO. DESCRIPTION
UNIT
QUANTITY
PRICE
AMOUNT
0257.406
6" DIP WATERMAIN,
CL. 52
L.F.
150
$13.00
$ 1,950
0257.606
6" R.S. GATE VALVE
AND BOX
EACH
2
400.00
800
0257.630
FITTINGS LESS THAN 12"
LB.
200
1.25
250
0257.640
FIRE HYDRANT
EACH
1
900.00
900
0257.710
1" COPPER SERVICE
L.F.
1,200
6.00
7,200
0257.730
1" CORPORATION
EACH
27
30.00
810
0257.740
1" CURB STOP
EACH
27
70.00
1,890
0257.806
INSULATION
BD. FT. 150
1.00
150
0257.903
CONNECT TO EXISTING
WATERMAIN
EACH
2
200.00
400
SUBTOTAL
+10$ CONTINGENCIES
ESTIMATED CONSTRUCTION COST
+20$ OVERHEAD & ENGINEERING
TOTAL ESTIMATED COST
$14,350
650
516,000
4,000
$20,000
ESTIMATE OF COST
STORM SEWER
CITY PROJECT NO. 180
ROSEMOUNT, MINNESOTA
ITEM UNIT
NO. DESCRIPTION UNIT QUANTITY PRICE AMOUNT
0258.401 12" RCP CATCH BASIN
LEADS, CL. IV L.F. 200 $23.00 $ 4,600
0258.412 12" RCP STORM SEWER,
SUBTOTAL
+10$ CONTINGENCIES
ESTIMATED CONSTRUCTION COST
+20$ OVERHEAD & ENGINEERING
TOTAL ESTIMATED COST
$29,700
3,300
$33,000
7.000
$40,000
CL. IV
L.F.
400
20.00
8,000
0258.427
27" RCP STORM SEWER,
CL. III
L.F.
50
31..00
1,550
0258.430
30" RCP STORM SEWER,
CL. III
L.F.
200
34.00
6,800
0258.603
MANHOLE, TYPE B
L.F.
6
125.00
750
0258.604
MANHOLE, TYPE C
L.F.
6
200.00
1,200
0258.704
CATCH BASIN, TYPE X
L.F.
20
110.00
2,200
0258.705
CATCH BASIN, TYPE Y
L.F.
20
130.00
2,600
0258.801
R 1733 MH CASTING
EACH
2
150.00
300
0258.808
R 3067 CB CASTING
EACH
7
200.00
1,400
0258.930
CONNECT TO EXISTING
STORM SEWER
EACH
1
300.00
300
SUBTOTAL
+10$ CONTINGENCIES
ESTIMATED CONSTRUCTION COST
+20$ OVERHEAD & ENGINEERING
TOTAL ESTIMATED COST
$29,700
3,300
$33,000
7.000
$40,000
ESTIMATE OF COST
STREET CONSTRUCTION
CITY PROJECT NO. 180
ROSEMOUNT, MINNESOTA
ITEM
UNIT .
NO. DESCRIPTION
UNIT
QUANTITY
PRICE
AMOUNT
2105.501
COMMON EXCAVATION
C.Y.
500
$1.00
$ 500
2105.521
GRANULAR BORROW (LV)
C.Y.
500
3.00
1,500
2111.501
TEST ROLLING
RD. STA. 13
40.00
520
2112.501
SUBGRADE PREPARATION
R.S.
13
80.00
1,040
2211.503
AGG. BASE PLACED
CLASS 5
C.Y.
850
10.00
8,500
2341.504
BIT. MAT. FOR MIX.
TON
60
175.00
10,500
2341.508
WEARING COURSE MIX.
TON
530
14.00
7,420
2341.510
BINDER COURSE MIX.
TON
530
13.00
6,890
2357.502
BIT. MATERIAL FOR
TACK COAT
GAL.
250
1.50
375
2504.602
ADJUST GATE VALVE BOX
EACH
4
100.00
400
2506.511
RECONSTRUCT MANHOLE
L.F.
5
200.00
1,000
2506.522
ADJUST FRAME AND RING
CASTING
EACH
12
130.00
1,560
2531.501
CONCRETE CURB & GUTTER,
DESIGN D418
L.F.
2,700
5.00
131500
2554.501
PERMANENT BARRICADES
L.F.
32
40.00
1,280
SUBTOTAL
$54,985
+10% CONTINGENCIES
5,015
ESTIMATED
CONSTRUCTION COST
$60,000
+20$ OVERHEAD & ENGINEERING
15,000
TOTAL ESTIMATED COST
$75,000
ESTIMATE OF COST
STREET LIGHTING
CITY PROJECT NO. 180
ROSEMOUNT, MINNESOTA
ITEM
UNIT
INO.
DESCRIPTION UNIT QUANTITY
PRICE
AMOUNT
2545.511 LIGHTING UNIT, TYPE A EACH 1
$900.00
$ 900
2545.511 LIGHTING UNIT, TYPE B EACH 3
1,200.00
3,600
2545.532 UNDERGROUND CONDUCTOR L.F. 900
2.50
2,250
2545.552 FEED POINT EACH 2
1,000.00
2,000
SUBTOTAL
$ 8,750
+10$ CONTINGENCIES
1,250
ESTIMATED CONSTRUCTION COST
$10,000
+20% OVERHEAD & ENGINEERING
2,000
TOTAL ESTIMATED COST
$12,000
i
1
013-37
^ i b
O O O
0 0,,
145 TH STREET
R
W
J
J
Q �I 011-25
W
CL
II
NORTHERN NATURAL GAS 00 1
w
Z
010-50
s Y Iw
° P °
SIRE
°Q UPPER a 143 RD
z • s - a / -�W
O
� .zo
i 144T ST EE'T — j s
O 4 =
u zo z.
oH
-��__
010- ea 91 PO @°'a 2 a 2 1µLLS.
/ '
s••�s"; �s46 TH
gr
° I
34
6146TH ST Lzi wn- s / zL0 E W7 H (T'
W f LLI
a 147 tH n ST. W'j s 1a47 TH -STREET W.-
aI 1-1 1g z
UPPERS 147TH
GAS CO.
28 159 TH COURT21 W 19 6 u OIO-T3
DAKOTA DRIVE
30 11<1 160 TH STREET W. o
EMPIRE
FILE N0.
88131
PROJECT LOCATION
DRG. N0.
i
ENGINEERS 8 ARCHITECTS 0 PLANNERS