Loading...
HomeMy WebLinkAbout9.f. Authorize Feasibility Report / 1988 Sidewalk Replacement, City Project #186DATE: MARCH 31, 1988 TO: MAYOR & COUNCILMEMBERS C/O ADMINISTRATOR JILK FROM: CITY ENGINEER/PUBLIC WORKS DIRECTOR HEFT(I / RE:_ ITEMS FOR APRIL 5, 1988 COUNCIL MEETING NEW BUSINESS Authorize Feasibility Report/1988 Sidewalk Replacement, Project #186 Last year the Public Works Department surveyed the existing concrete sidewalk situation in the City. The result of this survey is that there is about 9,000 square feet of sidewalk in very poor condition. The recommended corrective measures would be mud jacking and complete replacement. Mud jacking could be used successfully in areas where there is differential settling between sidewalk panels. The lower slab can be raised to meet the grade of the adjacent slab thereby removing a'potential liability of someone catching the edge of the slab and falling. The other problems with the sidewalks are generally located at driveways where the concrete is spalling (peeling and chipping) or severe pitting has occurred. This is generally the result of reaction with the salt, that is dragged off the City streets in the winter time, and the concrete that has occurred over many years. This, as with the areas where this concrete is badly cracked, needs to be removed and replaced. I would like Council to authorize Staff to prepare a feasibility report on the condition of the existing sidewalk, the appropriate correction methods, and estimated cost. We should be able to return the feasibility report for Councils information by May 3, 1988. If Council has any questions or concerns regarding this proposed project, please feel free to contact me at Councils convenience.