Loading...
HomeMy WebLinkAbout6.h. Approve Change Order #1 - 130th Street / Jay Simon's Addition, City Contract #1985-4DATE: MAY 12, 1988 TO: HAYCR & OJUNCIUE24BERS C/O ADMINISTRATOR JILK FMI: CITY E gG]3,MCI:/PUBLIC WORKS DIRBCIM FHEF`I'I ' RE: ITEMS FOR MAY 17, 1988 COUNCIL MEETING Approve Change Order #1 for 130th Street/Jay Simon Addition City Contract 1985-4 This change order is for additional work the contractor performed which was not included in the original scope of the contract. This work resulted from an oversight of our Consulting Engineers in underestimating the mount arra type of restoration that was necessary for this project. When Council directed our Consultants to include this work in the project last suKnner our Consultants agreed to reimburse the City 50% of this cost. The action for Council to consider is to approve Change Order #1 in the amount of $10,481.75 to City Contract 1985-4 and authorize the Mayor and City Clerk to execute all related documents. AW CHANGE ORDER ENGINEERS 1 ARCHITECTS r PLANNERS : Irt'_ "' .'i •.; t , .. t ,.,...a,, Sr PAIL I" JF7.I 122 77 OWNER City of Rosemount DATE May 9,I988_ _ OWNERS PROJECT NO -1-985-4 and 1985-4A Ct tANGE ORDER NO.�_1-__ PROJECT DESCRIPTION130th St. W. & Simons Addn. Area SEH FILE NO -.P5-1 97 The following changes shall be made to the contract documents Description. See attached list. Purpose of Change Order: Add miscellaneous construction items to the Contract. Basis of Cost: §1 Actual o Estimated Attachments Mst supporting documents) List of miscellaneous construction items. Contract Status Original Contract (Final Quantities) Net Change Prior C.O. s __ to Change this C.O. Revised Contract Time Cost 2091.810.69_ + 10,481.75 $220,292.44 Recommended for Approval: Short -Elliott -Hendrickson, Inc. By Steve D. Campbell Agreed to by Contractor., Approved for Owner: By By Title By Distribution Contractor 2 Owner t Project Pepresentative t SEH Office t :IrrvT rt.1fol 7 Sir-AUI rr�rrrf.itt^ -if 15, IIENLIFIOSON INC. MINNESOTA CHANGE ORDER #1 MISCELLANEOUS CONSTRUCTION ITEMS 1. Install 18" culvert at 128th and Bacardi 48 LF - 18" RC pipe culvert @ $ 25.50/LF = $1,224.00 2 EA - 18" RC aprons @ $375.00/EA - 750.00 Add $1,974.00 2. Excavation and removal of materials from dump site on 130th Street @ Sta 35+00 to 37+00 5 HR - Cat 966 loader @ $ 76.00/HR = $ 365.00 12 HR - Tandem truck @ $ 46.00/HR = $ 552.00 1 HR - 1H TD25 dozer @ $ 99.00/HR - $ 99.00 3 HR - Cat 980 loader @ $ 97.00/HR - $ 291.00 Add $1,317.00 3. Remove additional 1' of subgrade material on 130th Way @ Sta 41+00 to 43+00 6 HR - Cat 140 motor grader @ $ 68.00/HR = S 408.00 Add S 408.00 4. Construct bituminous spillways on 120th Street @ Ste 2+00 South, Sta 3+00 North, and Sta 6+00 South 22.17 tons - bituminous mixture @ $ 75.00/Ton= $1,662.75 Add $1,662.75 5. Remove shouldering material from Bengal Avenue, Sta 4+00 to 5+50 1 HR - Bobcat @ $ 38.00/HR - $ 38.00 2 HR - Labor @ $ 12.50/HR - $ 25.00 1 HR - Dump truck @ $ 32.00/HR - $ 32.00 Add $ 95.00 6. Restoration of boulevard areas along Bengal Avenue, Sta 0+00 to 4+00 5 HR - Bobcat @ $ 38.00/HR = $ 190.00 10 HR - Labor @ $ 12.50/HR = $ 125.00 36 CY - Topsoil @ $ 7.00/CY - $ 252.00 Add $ 567.00 0 0 7. Topsoil placement and preparation for sodding on the following areas: Ben -.at Avenue, Sta 4+00 to 5+50 123-h Street, Sta 7+00 to 13+00 130th Way, Driveway Entrances 130th Street, Miscellaneous Locations 11 HR - Bobcat 32 HR - Labor @ S 38.00/HR = $ 418.00 520 Cat - Topsoil @ $ 12.00/HR = $ 400.00 @ S 7.00/Cy = $31640.00 Add $4,458 Total add (Items 1 - 7) = $10,481.75