Loading...
HomeMy WebLinkAbout7.b. Recommend Selection of Engineering Firm for Storm Water Master PlanDATE: JUNE 1, 1988 TO: MAYOR & CITY COUNCIL C/O ADMINISTRATOR JILK FROM: CITY ENGINEER/PUBLIC WORKS DIRECTOR HEFTI 4 RE: ITEMS FOR THE JUNE 7, 1988 COUNCIL MEETING OLD BUSINESS Recommendation for Engineering Firm for Storm Water Master Plan The Utilities Commission, based upon past recommendation, is recommending the selection of Barr Engineering of Bloomington to perform the Master Storm Sewer Plan that Council authorized earlier this year. The cost for this Master Plan is estimated at $15,700. Barr Engineering is one of five consulting engineering firms the Utility Commission and Staff reviewed for providing services for the Master Storm Sewer Plan. Attached is a summary of Staff evaluation of the five engineering firms. Also enclosed with your packets are proposals from each of the firms, which Staff and the Utility Commission reviewed. In short, Barr Engineering specializes in water resources as they relate to storm water management and flood control. Their background as a firm, their general expertise of their people and their reasonable price are the basic factors resulting in their selection by Staff and the Utility Commission. The Utility Commission has no way to fund the Master Storm Sewer Plan at this time because the only revenue that we generate is from water and sewer billing. The newly adopted Storm Sewer Connection Charge is for the development of new storm sewer ponds and oversizing of storm sewer lines. Therefore the Utility Commission is requesting the Council designate the necessary funding to proceed with this much needed plan. One area of available funding is from the surplus remaining from the tractor -loader -backhoe purchase. There is somewhat in excess of $15,000 from what we budgeted and the purchase price for the tractor -loader - backhoe unit. Recommended action for Council to take would be to accept Barr Engineering proposal for the preparation of a Master Storm Sewer Plan and to allocate the necessary funding. Master Drainage Plan RFP Evaluation FIRM #1 #2 #3 ------------------------------------------------------------------- #4 #5 #6 #7 #8 TOTAL (Cost) BARR 4.5 4 3.5 4 4 4 3 3 3.80 $15,720 MSA 3.5 4 3.5 4 4 3 3 3 3.65 $16,300 OSM 4 4 3 4.5 3 4 3 3 3.65 $27,500 TKDA 3.5 3.5 3 3.5 3.5 4 3.5 3 3.38 $20,000 SEH 4 3.5 3.5 ------------------------------------------------------------------- 3.5 2 4 3 3 3.35 $50,000 1-poor 2 -below avg 3-avg 4 -above avg 5-excellant EVALUATION WEIGHTS 1. Firms Experience 0.10 2. Proj Mgr Exper 0.20 3. Support Staff Exper - 0.20 4. Work Scope Understanding 0.20 5. Cost of Services" 0.10 6. Technical Support(Computer) 0.05 7. Schedule 0.05 8. References 0.10