Loading...
HomeMy WebLinkAbout4.g. APplication for Payment #5, Shannon Parkway Street & Utility Improvementsi CITY OF ROSEMOUi APPLICATION FOR PAS NO. f -r O 4 iL RECCIVhu MAY 25 1981 r1TV f%C (Zf1CC�+nl�he^ PROJECT: S kaeu,�,,� POW lt, CONTRACTOR: Atrow C�`tytjt ,, CONTRACT DATE: 3 �'• bras' APPLICATION DATE: S S O►, SSrOS� FOR PERIOD ENDING: Total Contract Amount S./ D73,So �Z Total Amount Earned S �3/ 7Z3 g3 Material Suitably Stored on Site, Not Incorporated into Work S�{_3l0 Contract Change Order No. Percent Complete S Contract Change Order No. Percent Complete S Contract Change Order No. Percent Complete S GROSS AMOUNT DUE ...................... s 76-4,433 93 LESS S $'RETAINAGE ................... $ 3-7,70/ 6P AMOUNT DUE TO DATE .. ... , . .... S_%lS, 33ZZ= LESS PREVIOUS APPLICATIONS .......... SjSaj Z74 3S AMOUNT DUE THIS APPLICATION ......... S 66,o&7 e¢ J x J Rchard M. Heft City Engineer/Di a or of Public Works PAGE 1 OF 7 SHORT-ELLIOTT-HENDRICKSON, INC. APPLICATION FOR PAYMENT Y------------------------- ---------------.--------(UNIT (UNIT PRICE CONTRACT) NO. 5 ,,. , i" " -,, . i i . kOTE: QUANTITIES AND UNIT PRICES HAVE BEEN REVISED IN ACCORDANCE WITH CHANGE ORDER NO. 1 OWNER: ROSEMOUNT, MINNESOTA OWNER'S PROJECT NO. 168 & 171 ENGINEER'S PROJECT NO. - - 87122 LOCATION: ROSEMOUNT, MINNESOTA ---- ---------- CONTRACTOR ARCON CONSTRUCTION CO., INC. CONTRACT DATE --------------- 903E. FOREST -AVE., - ------------------------- AMOUNT MORA, MINNESOTA 55051 --$1,073,560.12 ---a ---- CONTR. FOR ----------------------- SHANNON PARKWAY STREET ------------------------------------------------------------------- AND UTILITY CONSTRUCTION - S.A.P. 208-106-02 APPLIC.DATE PERIOD END._ 7/ --------------------- ------------- APPLICATION APPLICATION FOR PAYMENT ----------------------- CONTRACT QUANTITY UNIT DESCRIPTION ----------- UNIT QUANTITY TO DATE PRICE TOTAL 2021.501 MOBILIZATION L.S. - *- - -.85 1 14322.00 $712,173.70- 2101.501 CLEARING TREE 21 20 61.38 $ 1,288.98 2101.506 GRUBBING TREE 21 20 61.38 $ 1,288.98 2104.501 REMOVE CONCRETE CURB AND GUTTER L.F. 871 1050 2.04 $ 1, 776.84 2104.521 SALVAGE CM PIPE CULVERT L.F. 44 20 5.11 $ 224.84 2104.501 REMOVE PIPE CULVERTS L.F. 20 58 5.11 $ 102.20 2104.509 REMOVE MANHOLES OR CATCH BASINS EACH 4 3 204.60 $ 818.40 PAGE 1 OF 7 SHORT-ELLIOTT-HENDRICKSON, INC. 2105. 501 COMMON EXCAVATION (P) C.Y. 50,000 42833 1.30 $ 65,000.00 2105.511 COMMON CHANNEL EXCAVATION C.Y. 760 438 1.38 $ 1,048.80 2105.535 SALVAGED TOPSOIL (L.V.) C.Y. 1000 5825 1.22 $ 1,220.00 2111.501 TEST ROLLING RD, STA 77 96 102.30 $ 7,877.10 2112. 501 SUBGRADE PREPARATION R.S. 77 96 153.45 $ 11, 815.65 2116.501 CORE EXCAVATION C.Y. 1200 1.22 $ 2211-503 r, AGG BASE PLACED CL 5 (P) C.Y. 5500 8495 8.18 $ 44,990.00 2211,504 AGG. BASE PLACED FOR WALK, CLASS 5 (P) C.Y. 996 10.23 $ 2221.503 AGGREGATE SHOULDERING PLACED, CL. 2 C.Y. 30 33.75 $ 2331.504 BITUMINOUS MATERIAL FOR MIXTURE TON 229 163.68 2331.514 BASE COURSE MIXTURE TON 5077 6.64 $ 2341.504 BITUMINOUS MATERIAL FOR MIXTURE TON 3.46 330 184.14 $ 637.12 2341.508 WEARING COURSE MIXTURE TON 57.74 5077 7.67 $ 442.86 2357.502 BITUMINOUS MATERIAL FOR TACK COAT GAL. 2635 1.02 $ 2501.515 15" RC PIPE APRON W/TRASH GUARD EACH 8 9 423.52 $ 3,388.16 2501.515 18" RC PIPE APRON 1 478.76 W/TRASH GUARD EACH 1 478.76 $ 2501.515 21" RC PIPE APRON 1 W/TRASH GUARD EACH 1 556.51 $ 556.51 2501.515 24" RC PIPE APRON W/TRASH GUARD EACH 1 1 630.16 $ 630.16 2501.515 27" RC PIPE APRON W/TRASH GUARD EACH 1 1 760.08 $ 760.08 2501.515 42" RC PIPE APRON W/TRASH GUARD EACH 1 2 1265.45 $ 1, 265.45 2503.511 12" RCP STORM SEWER, DES. 3006, CL. V L.F. 1161 1298 19.14 $ 22,221.54 PAGE 2 OF 7 SHORT-ELLIOTT-HENDRICKSON, INC. 2503.511 15" RCF STORM SEWER, DES, 3006, CL. V L.F. 1077 1143 19.14 $ 20,613.78 2603.511 18" RCP STORM SEWER, DES. 3006, CL. V L.F. 1359 850 21.33 $ 28,987.47 2503.511 21" RCP STORM SEWER, DES. 3006, CL. V L.F. 685 1489 23.14 $ 15,850.90 2503.511 24" RCP STORM SEWER, DES. 3006, CL. IVL.F. 124 1040 26.30 $ 3,261.20 1803.511 27" RC PIPE SEWER, DES. 3006, CL. IV L.F. 18 18 47.21 $ 849.78 2503.511 30" RC PIPE SEWER, DES. 3006, CL. IV L.F. 995 1381 34.31 $ 34,138.45 203.511 36" RC PIPE SEWER, DES. 3006, CL. IV L.F. 1967 1972 69.99 $ 137,670.33 2503.511 42" RC PIPE SEWER, DES. 3006, CL. IV L.F. 509 467 79.18 $ 40,302.62 0503.608 15" RCP STORM SEWER, JACKED L.F. 96 78 113.55 $ 10,900.80 0503.608 36" RCF STORM SEWER, JACKED L.F. 128 120 360.02 $ 46,082.56 2504.602 ADJUST GATE VALVE BOX EACH 6 98.20 $ 2506.506 CONSTRUCT MANHOLE, DESIGN H L.F. 177.71 141 122.35 $ 21,742.81 2506.506 CONSTRUCT MANHOLE, DESIGN C L.F. 78.66 73 174.11 $ 13,695.49 2506.507 CONSTRUCT CATCH BASIN, DESIGN Y L.F. 57.90 50 123.98 $ 7,178.44 2506.509 CONSTRUCT CATCH BASIN, DESIGN X L.F. 80.36 132 139.53 $ 11,212.63 2506.511 RECONSTRUCT MANHOLE L.F. 17 20 95.13 $ 1,617.21 2506.516 CASTING ASSEMBLY, TYPE R-1733 EACH 28 111.50 2506.516 CASTING ASSEMBLY, TYPE R-3067 EACH 2 45 176.97 $ 353.94 2506.522 ADJUST FRAME AND RING CASTING EACH 3 122.76 $ PAGE 3 OF 7 SHORT-ELLIOTT-HENDRICKSON, INC. 2511.501 RANDOM RIPRAP CL II C.Y. 29.90 44 46.03 $ 1,376.29 2,511.516 GEOTEXTILE FILTER FABRIC, TYPE IV S.Y. 57.80 176 3.17 $ 183.22 2531.501 CONCRETE CURB & GUTTER, DESIGN D618 L.F. 19550 4.17 $ 2521.511 2" BITUMINOUS WALK S.F. 73550 0.28 $ 2531.507 8" CONCRETE DRIVEWAY PAVEMENT S.Y. 76 21.99 $ 2545.511 LIGHTING UNITS, TYPE B EACH 27 1115.07 $ 2545.521 3" RIGID STEEL CONDUIT L.F. 400 400 9.20 $ 3,680.00 2545.532 DIRECT BURIED CABLE L.F. 9000 1.81 $ 2545.552 FEED POINT EACH 3 1457.77 $ 0563.601 TRAFFIC CONTROL L.S. . 5 1 2557.50 $ 1,278.75 2564.531 SIGN PANELS - TYPE C S.F. 280 18.82 $ 0564.602 TURN LANE PAVEMENT MESSAGE L.S. 6 35.80 $ 0564.602 CROSS WALK PAVEMENT MESSAGE L.S. 1 76.72 $ 2564.603 4" WIDE SOLID LINE, WHITE L.F. 645 0.20 $ 2564.603 4" WIDE SOLID LINE, YELLOW L.F. 10800 0.15 $ 2564.603 4" WIDE BROKEN LINE, WHITE L.F. 670 0.21 $ 0564.603 4" WIDE BROKEN LINE, YELLOW L.F. 1180 0.21 $ 0564.603 12" WIDE SOLID LINE, WHITE L.F. 26 5.11 $ 0564.603 24" WIDE SOLID LINE, 3 YELLOW L.F. 420 0.97 $ 05:65.602 HANDHOLE - TYPE C EACH 4 4 358.05 $ 1,432.20 2575.501 ROADSIDE SEEDING ACRE 10 96.16 2575.502 SEED MIXTURE 5 LBS. 500 2.54 $ PAGE 4 OF 7 SHORT-ELLIOTT-HENDRICKSON, INC. 2575.505 I'I SODDING S.Y. 6200 1.20 '1575.511 MULCH MATERIAL, TYPE 1 TON 20 100.25 $ 2575.519 DISC ANCHORING ACRE 10 42.96 $ 2575.523 WOOD FIBER BLANKETS S.Y. 1000 1.16 0256.408 8" PVC, 12'-14'DEEP L.F. 50 50 18.60 $ 930.00 0256.408 8" PVC, 22'-24' DEEP L.F. IOU 100 25.54 $ 2,554.00 p,256.701 STANDARD MANHOLE, 8' DEEP EACH 1 1 961.62 $ 961.62 0256.702 EXCESS DEPTH STANDARD MANHOLE L.F. 14 15 55.24 $ 773.36 0256.706 MANHOLE DROP SECTION ON EXISTING MANHOLE L.F. 8.3 9 115.59 $ 959.39 0256.900 CONNECT TO EXISTING SEWER EACH 1 1 358.05 $ 358.05 0256.910 8" D.I.P. FORCEMAIN L.F. 1550 1550 12.38 $ 19,189.00 0257.406 6" DIP WATERMAIN, CL 52 L.F. 88 162 14.97 $ 1,317.36 0257.408 8" DIP WATERMAIN, CL 52 L.F. - 254 320 17.17 $ 4,361.18 0257.412 12" DIP WATERMAIN, CL 52 L.F. 248 1945 17.75 $ 4,402.00 0257.416 16" DIP WATERMAIN, CL 52 L.F. 3212 3200 24.95 $ 80,139.40 057.419 BORE 24" STEEL CASING L.F. 96 105 96.16 $ 9,231.36 0257.421 JACK 16" DIP THRU CASING L.F. 120 105 30.28 $ 3,633.60 0257. 606 6" R . S .GATE VALVE & BOX EACH6 10 321.22 $ 1,927-32 0257.608 8" R.S.GATE VALVE & BOX EACH 3 4 460.35 $ 1,381.05 0257.613 12" B.F.VALVE & BOX EACH 2 731.44 $ 0257. 617 16" B.F. VALVE & BOX EACH 3 2 1366.72 $ 4,100.16 0257.630 FITTINGS LESS THAN 12" LH. 1000 585 1.52 $ 1,520.00 0257.631 FITTINGS 12" & LARGER LB. 10390 10640 1.04 $ 10,805.60 0257.633 LOWER WATERMAIN EACH 1 2 552.42 $ 552.42 0257.640 FIRE HYDRANT EACH 6 9 1117.11 $----6,702.66 PAGE 5 OF 7 SHORT-ELLIOTT-HENDRICKSON, INC. f• 0 0257.806 INSULATION BD.FT. 512 0257.903 CONNECT TO EXISTING '$ 1,023.00 5 WATERMAIN EACH 4 0290.01 JAPANESE TREE LILAC 2" EACH 0290.02 AMUR MAPLE 2" EACH 0290.03 CANADA RED CHERRY 2" EACH 0290.04 COLUMNAR BUCKTHORN 36" EACH 0290.05 COMMON PURPLE LILAC 36" EACH 0290.06 GOLD DROP POTENTILLA 18" EACH 0290.07 DWARF AMUR MAPLE 18" EACH 0290.08 RUGOSA ROSE #2 POT EACH 0290.09 BLACK HILLS SPRUCE 6' EACH 0290.10 COLORADO BLUE SPRUCE 6' EACH 0290.11 COLORADO GREEN SPRUCE 6' EACH 0290.12 AUSTRIAN PINE 6' EACH 0290.13 PONDEROSA PINE 6' EACH 0290.14 RIVER ROCK, 3/4 - 1-1/2" C.Y. 0290.15 MULCH MATERIAL, TYPE 6 C.Y. 0 64 0.45 486.40 $ 3 255.75 '$ 1,023.00 5 137.08 7 137.08 $ 3 132.99 $ 18 28.64 $ 161 28.64 $ 76 18.41 $ 33 21.48 47 21.48 15 132.99 $ 15 132.99 $ 27 132.99 $ 11 132.99 $ 12 132.99 $ 30 18.41 $ 20 18.41 $ Tot&l . Cortract Amount $ 1 , 07 JM60. 12 Total Amount Ear $ 739,723.93 Material Suitably Stored on Site, Not Incoporated into Work $ 14,310.00 Contract Change Order No. Percent -Complete Contract Change Order No. Percent Complete $ ,I Contract Change Order No. Percent Complete $ GROSS AMOUNT DUE .............. $ 754,033.93 LESS 5 i; RETAINAGE......... $ 37,701.69 AMOUNT DUE TO DATE....., .. . $ 716,332.24 LESS PREVIOUS APPLICATIONS..,.. $ 650,274.35 CONTRACTOR'S AFFIDAVIT AMOUNT OUE THIS APPLICATION.... $ 66,057.89 ; he undersigned Contractor hereby swears under penalty of perjury that (1) all previous progress. payments received from the Owner on account of work performed under the contract referred to Above have been applied by the undersigned to discharge in full all obligations of the under- signed incurred in connection with work covered by prior Applications for Payment under said contract, and (2) all material and equipment incorporated in said Project or otherwise listed in or covered by this Application for Payment are free and clear of all liens, claims, security interests and encumbrances. Dated May 5 19 88 Arcon Construction Co. , Inca Contractor By el,4 Lev,f/ i(game an Title COUNTY OF ) SS STATE OF Before me o thi day of —19 personally appeared known to me, who' being'NTy sworn, did depose and say t e rhe of the Contractor above mentioned; (0 ffi that he executed the above Application for Payment and Affidavit on beha said Contractor; And that all of ,therein are tru ,correct and ete. VERA C. ' My Commission Ex NOTARY PUBLIC—MINNWA c KANABEC COUNTY (Notary Public) Mr Cammiss�on Expires 1sn.It. 1993 The undersigned tf is LApplication for Payment shown above. Apart of this Application is the Contractor's Affidavit stating that all previous payments to him under this Contract have been applied by him to discharge in full all of his obligations in connection with the work covered by a,ll prior Applications for Payment. In accordance with the Contract, the undersigned approves payment to the Contractor of the Amount Due. Date / SHORT E H RLCKSO . By Page 7 of 7