Loading...
HomeMy WebLinkAbout5.b. Accept Bids / Award Contract. Valley Oak Addition Phase III, Streets & Utilities ImprovementsDATE: JUNE 16, 1988 TO MAYOR & COUNCILMEMBERS C/O ADMINISTRATOR JILK FROM: CITY ENGINEER/PUBLIC WORKS DIRECTOR HEFT RE: ITEMS FOR JUNE 21, 1988 COUNCIL MEETING OLD BUSINESS Accept Bids/Award Contract, Valley Oak Addition, Phase III, Street and Utilities Staff opened bids for City Contract 1988-1, Valley 0ak Addition Street & Utility Improvements, at 10:00 a.m., June 16, 1988. The apparent low bidder is Moser Construction at $108,140.48. There were six bids submitted overall. The low bid is 5% less than the Engineers estimate and over 26% less than the feasibility report estimate as is shown on the bid tabulation sheet that is attached. Recommended action for Council to consider would be to receive the bids and award the contract for the Valley 0ak Replat Addition, Phase III Street & Utility Improvements, City Contract 1988-1, to the lowest responsible bidder, Moser Construction, in the amount of $108,140.48 and to authorize the Mayor and Clerk to sign the contracts. i BID TABULATION - City Contract 1988-01 Valley Oak Replat Addn Util & St Impr.ov'ts BIDDER AMOUNT Moser Construction 9108,140.48 Hydrocon, Inc 8109,631.00 0 & P Contracting $112,563.25 Volk Sewer & Water 9116,925.95 Brown & Chris, Inc $122,385.15 Meyer Contracting 9156,649.99 Engineer Estimate $114,015.50 Feas Rpt Estimate 9147,500.00 % under Eng Est -5.15X % under Feas Rpt Est -26.68% 16 -Jun -88