HomeMy WebLinkAbout4.j. Application for Payment #6, Shannon Parkway, City Project #168 & #171f CITY OF ROSEMOUNT APPLICATION FOR PAYMENT NO. E CITY PROJECT NO: 16rpi. 1-7 SEH PILE NO: 6.71ZZ. PROJECT : Sk7-1......_ ALI La,... CONTRACTOR: 4ctr .- CONTRACT DATE: �O � Z.f $7 - I9Ok' APPLICATION DATE: 6 _1 "OM, MN. SSoSj FOR PERIOD ENDING: 6/1 -7/66 -,--- Total /1-7/66 Total Contract Amount $ 1f a73S O" Total Amount Earned $ Material Suitably Stored on Site, Not Incorporated into Work $ Contract Change Order No. _ Percent Complete Contract Change Order No. Percent Complete S Contract Change Order No. Percent Complete $ GROSS AMOUNT DUE ...................... $---_�,./�8S7S..SS LESS '�—$ RETAINAGE ................... $ S71 7= AMOUNT DUE TO DATE .................... $ '10 9) 146 27 LESS PREVIOUS APPLICATIONS ............ $ 7/6 3ZZ AMOUNT DUE THIS APPLICATION ........... $?4� �/ 4 4T3 A P RR -05 E.n : _ -2 i Richard M. He , City Engineer/D ector of Public Works • APPLICATION FOR PAYMENT -R T, -4, curf,I v i'r.'•T rel;:�T I�_i ., ,%hSORd, Mc. ------------------------- (UNIT PRICE CONTRACT) NO. 6 NOTE: QUANTITIES AND UNIT PRICES HAVE—BEEN REVISED IN ACCORDANCA'll CHANGE ORDER NO. 1 OWNER: ROSEMOUNT, MINNESOTA OWNER'S PROJECT NO. 168 & 171 ENGINEER'S PROJECT NO. 87122 ---------------- LOCATION: ROSEMOUNT, MINNESOTA ------------------------------- CONTRACTOR ARCON CONSTRUCTION CO., INC. CONTRACT DATE 903 E. FOREST AVE., BOX 57 CONTRACT AMOUNT $1,073,560.12 MORA, MINNESOTA 55051 ------------------------------- CONTR. FOR SHANNON PARKWAY STREET AND UTILITY CONSTRUCTION — S.A.P. 208-106-02 -- -- — ----- -------------------- APPLIC. DATE 6-22-88 PERIOD END. 6-17-88 APPLICATION FOR PAYMENT ----------------------- CONTRACT QUANTITY UNIT DESCRIPTION UNIT QUANTITY TO DATE PRICE TOTAL ---------- — — -- --------- 2021.501 MOBILIZATION L.S. •95 1 14322.00 $ 13.605.90 2101.501 CLEARING TREE 21 2101.506 GRUBBING TREE 21 2104.501 REMOVE CONCRETE CURB 1327 1050 AND GUTTER L.F. 2104.521 SALVAGE CM PIPE CULVERT L.F. 44 2104.501 REMOVE PIPE CULVERTS L.F. 55 2104.509 REMOVE MANHOLES OR CATCH BASINS EACH 4 20 61.38 $ 1.288.98 20 61.38 $ 1,288.98 2,707.08 1050 2.04 $ 20 5.11 $ 224.84 58 5.11 $ 281.05 3 204.60 $ 818.40 PAGE 1 OF 7 SHORT—ELLIOTT—HENDRICKSON, INC. • 0 COMMON EXCAVATION (P) C.Y. 56798 42833 COMMON CHANNEL EXCAVATION C.Y. 760 SALVAGED TOPSOIL (L.V.) C.Y. 5825 TEST ROLLING RD.STA 96 SUBGRADE PREPARATION R.S. 96 CORE EXCAVATION C.Y. 1350.6 AGG BASE PLACED CL 5 (P) C.Y. 8858 AGG. BASE PLACED FOR W/TRASH GUARD WALK, CLASS 5 (P) C.Y. 1527 AGGREGATE SHOULDERING L.F. 1161 PLACED, CL. 2 C.Y. BITUMINOUS MATERIAL FOR MIXTURE TON 299.64 BASE COURSE MIXTURE TON 5548.97 BITUMINOUS MATERIAL FOR MIXTURE TON 239.59 WEARING COURSE MIXTURE TON 3942.41 BITUMINOUS MATERIAL FOR 438 5825 96 96 1200 8495 996 30 229 5077 330 5077 TACK COAT GAL. 2030 2635 15" RC PIPE APRON W/TRASH GUARD EACH 8 18" RC PIPE APRON W/TRASH GUARD EACH 1 21" RC PIPE APRON W/TRASH GUARD ?EACH 1 24" RC PIPE APRON W/TRASH GUARD EACH i 27" RC PIPE APRON W/TRASH GUARD EACH 1 42" RC PIPE APRON W/TRASH GUARD EACH 1 12" RCP STORM SEWER, DES. 3006, CL. V L.F. 1161 1.30 $ 73,837.40 1.38 $ 1,048.80 1.22 $ 7,106.50 102.30 $ 9,820.80 153.45 $ 14,731.20 1.22 $ 1,647.73 8.18 $ 72,458.44 10.23 $ 15,621.21 33.75 $ 163.68 $ 49,045.07 6.64 $ 36,845.16 184.14 $ 44, 118.10 7.67 $ 30,238.28 1.02 $ 2.070.60 9 423.52 $ 3.388.16 1 478.76 $ 478.76 1 556.51 $ 556.51 1 630.16 $ 630.16 1 760.08 $ 760.08 2 1298 ?AGE 2 OF 7 SHORT-ELLIOTT-HENDRICKSON, INC. 1265.45 $ 1,265.45 19.14 $ 22,221.54 PAGE 3 OF 7 ul L. F. 1077 1143 19.14 $ 20,613.78 L. F. 1359 2503.511 15" RCP STORM SEWER, $ DES. 3006, CL. V 2503.511 18" RCP STORM SEWER, DES. 3006, CL. V 2503.511 21" RCP STORM SEWER, L. F. DES. 3006, CL. V 2503.511 24" RCP STORM SEWER, $ DES. 3006, CL. IV 2503.511 27" RC PIPE SEWER, 1040 DES. 3006, CL. IV 2503.511 30" RC PIPE SEWER, L. F. DES. 3006, CL. IV 2503.511 36" RC PIPE SEWER, $ DES. 3006, CL. IV 2503.511 42" RC PIPE SEWER, DES. 3006, CL. IV 0503.608 15" RCP STORM SEWER, 368.28 JACKED 0503.608 36" RCP STORM SEWER, JACKED 2504.602 ADJUST GATE VALVE BOX 2506.506 CONSTRUCT MANHOLE, DESIGN B 2506.506 CONSTRUCT MANHOLE, DESIGN C 2506.507 CONSTRUCT CATCH BASIN, DESIGN Y 2506.509 CONSTRUCT CATCH BASIN, DESIGN X 2506.511 RECONSTRUCT MANHOLE 2506.516 CASTING ASSEMBLY, TYPE R-1733 2506.516 CASTING ASSEMBLY, TYPE R-3067 2506.522 ADJUST FRAME AND RING CASTING PAGE 3 OF 7 ul L. F. 1077 1143 19.14 $ 20,613.78 L. F. 1359 850 21.33 $ 28,987.47 f 685 50 123.98 15,850.90 L. F. 128 1489 23.14 $ 46,082.56 L. F. 124 1040 26.30 $ 3.261.20 L. F. 18 18 47.21 $ 849.78 L. F. 995 1381 L. F. 1967 1972 L. F. 509 467 34.31 $ 34,138.45 69.99 $ 137,670.33 79.18 $ 40, 302.62 L. F. 96 78 113.55 $ 10,900.80 f 50 123.98 $ L. F. 128 120 360.02 $ 46,082.56 EACH 6 6 98.20 $ 589.20 L. F. 177.71 141 122.35 $ 21,742.81 78.66 L. F. L. F. 59.90 L. F. 80.36 L. F. 17 EACH 29 EACH 45 EACH 3 SNORT-ELLIOTT-HENDRICKSON, INC. 13,695.49 73 174.11 $ 50 123.98 $ 7,426.40 132 139.53 $ 11, 212.63 20 95.13 $ 1.617.21 28 111.50 $ 3.233.50 45 176.97 $ 7,963.65 3 122.76 S 368.28 SNORT-ELLIOTT-HENDRICKSON, INC. 8" CONCRETE DRIVEWAY PAVEMENT 0 17 LIGHTING UNITS, TYPE B ! 27 3" RIGID STEEL CONDUIT L.F. RANDOM RIPRAP CL II C.Y. 29.90 44 46.03 $ 1.376.29 GEOTEXTILE FILTER _75 57.80 S.F. 1 TURN LANE PAVEMENT 183.22 FABRIC, TYPE IV S.Y. 176 3.17 $ MESSAGE CONCRETE CURB & GUTTER, 4" WIDE SOLID LINE, WHITE L.F. DESIGN D618 L.F. 19747 19550 4.17 $ 82,344.99 2" BITUMINOUS WALK S.F. 73304 73550 0.28 $ 20,525.12 8" CONCRETE DRIVEWAY PAVEMENT S.Y. 17 LIGHTING UNITS, TYPE B EACH 27 3" RIGID STEEL CONDUIT L.F. 557 DIRECT BURIED CABLE L.F. 8000 FEED POINT EACH $ TRAFFIC CONTROL L.S. _75 SIGN PANELS - TYPE C S.F. 1 TURN LANE PAVEMENT $ 1.918.12 280 MESSAGE L.S. CROSS WALK PAVEMENT MESSAGE L.S. 4" WIDE SOLID LINE, WHITE L.F. 4" WIDE SOLID LINE, YELLOW L.F. 4" WIDE BROKEN LINE, WHITE L.F. 4" WIDE BROKEN LINE, YELLOW L.F. 12" WIDE SOLID LINE, WHITE L.F. 24" WIDE SOLID LINE, YELLOW L.F. HANDHOLE - TYPE C EACH 4 ROADSIDE SEEDING ACRE SEED MIXTURE 5 LBS. 76 21.99 $ 373.83 27 1115.07 $ 30,106.89 400 9.20 $ 5.124.40 9000 1.81 $ 14.480.00 3 1457.77 $ 1 2557.50 $ 1.918.12 280 18.82 $ 6 35.80 $ 1 76.72 $ 645 0.20 $ 10800 0.15 $ 670 0.21 $ 1180 0.21 S 26 5.11 420 0.97 $ 4 358.05 $ 1,432.20 10 96.16 $ 500 2.54 $ PAGE 4 OF 7 SHORT-ELLIOTT-HENDRICKSON, INC. 2575.505 2575.511 2575.519 2575.523 0256.408 0256.408 0256.701 0256.702 0256.706 0256.900 0256.910 0257.406 0257.408 0257.412 0257.416 0257.419 0257.421 0257.606 0257.608 0257.613 0257.617 0257.630 0257.631 0257.633 0257.640 SODDING S.Y. 100.25 MULCH MATERIAL, TYPE 1 TON $ DISC ANCHORING ACRE 18.60 WOOD FIBER BLANKETS S.Y. $ 2,554.00 8" PVC, 121-14'DEEP L.F. 50 8" PVC, 22'-24' DEEP L.F. 100 STANDARD MANHOLE, 96 105 8' DEEP EACH 1 EXCESS DEPTH STANDARD 6 10 MANHOLE L.F. 14 MANHOLE DROP SECTION ON $ 2 EXISTING MANHOLE L.F. 8.3 CONNECT TO EXISTING 1000 585 SEWER 10390 1 8" D.I.P. FORCEMAIN 6" DIP WATERMAIN, CL 52 8" DIP WATERMAIN, CL 52 12" DIP WATERMAIN, CL 52 16" DIP WATERMAIN, CL 52 BORE 24" STEEL CASING JACK 16" DIP THRU CASING 6" R.S.GATE VALVE & BOX 8" R.S.GATE VALVE & BOX 12" B.F.VALVE & BOX 16" B.F.VALVE & BOX FITTINGS LESS THAN 12" FITTINGS 12" & LARGER LOWER WATERMAIN FIRE HYDRANT 6200 20 10 1000 50 100 1 15 1.20 $ 100.25 $ 42.96 $ 1.16 $ 18.60 $ 930.00 25.54 $ 2,554.00 961.62 $ 961.62 55.24 $ 773.36 9 115.59 $ 959.39 EACH $ 1 L. F. 1550 1550 L.F. 88 162 L.F. 254 320 L.F. 248 1945 L.F. 3212 3200 L.F. 96 105 L.F. 120 105 EACH 6 10 EACH 3 4 EACH $ 2 EACH 3 2 LB. 1000 585 LB. 10390 10640 EACH 1 2 EACH 6 9 PAGE 5 OF 7 SHORT-ELLIOTT-HENDRICKSON, INC. 358.05 $ 358.05 12.38 $ 19,189.00 14.97 $ 1,317.36 17.17 8 4.361.18 17.75 $ 4.402.00 24.95 $ 80,139.40 96.16 $ 9,231.36 30.26 $ 3.633.60 321.22 $ 1.927.32 460.35 $ 1,381.05 731.44 $ 1366.72 $ 4.100-16 1.52 $ 1.520.00 1.04 $ 10,805.60 552.42 $ 552.42 1117.11 $____6,702.66 0.95 $ 486.40 255.75 $ 1.023.00 +11 A:t 137.08 • INSULATION BD.FT. 512 4 CONNECT TO EXISTING 37z --,'Z- 28.64 $-5i'r.�i WATERMAIN EACH 4 3 18.41 JAPANESE TREE LILAC 2" EACH '15/ 3 5 AMUR MAPLE 2" EACH 7 7 CANADA RED CHERRY 2" EACH 3 3 COLUMNAR BUCKTHORN 36" EACH .1813 18 COMMON PURPLE LILAC 36" EACH ZZ- 161 GOLD DROP POTENTILLA 18" EACH ZZ a 76 DWARF AMUR MAPLE 18" EACH 49 33 RUGOSA ROSE #2 POT EACH S 47 BLACK HILLS SPRUCE 6' EACH 15 15 COLORADO BLUE SPRUCE 6' EACH 15 COLORADO GREEN SPRUCE 6' EACH _ 1' 27 AUSTRIAN PINE 6' EACH �, Z 11 PONDEROSA PINE 6' EACH 12 RIVER ROCK, 3/4 - 1-1/2-? C.Y. 30 MULCH MATERIAL, TYPE 6 C.Y. ' ,2tf %J 20 0.95 $ 486.40 255.75 $ 1.023.00 +11 A:t 137.08 $ -649-45 137.08 $ 959.56 132.99 $ 398.97 37z --,'Z- 28.64 $-5i'r.�i 3 49446 28.64 $ 461 18.41 /O'S'. - 21.48 $ 706.04 A 21.48 $ _};gg9• 132.99 $ 1,99 '� � 1"7Z8_- 8 132.99 $"ice 3vS8 3 132.99 $ :4 SiQA VN 76 132.99 $ a -e 132.99 $ 18.41 $ -542.w ?-7,6 L 18.41 $ 46$:z0 r APPLICATION FOR PAYMENT - Continued Total Contract Amount $_1.07560.12 Total Amount Ea*d Material Suitably Stored on Site, Not Incoporated into Work Contract Change Order No. I Contract Change Order No. Contract Change Order No. Percent -Complete !00 Percent Complete Percent Complete GROSS AMOUNT DUE ............... LESS 1,� % RETAINAGE......... AMOUNT DUE TO DATE ..........:.. I � i 4�y� 57S ss $ -47f5+;e99.9&75 - LESS PREVIOUS APPLICATIONS..... $ 716,332.24 37 l4 3'3 AMOUNT DUE THIS APPLICATION.... $ CONTRACTOR'S AFFIDAVIT The un ersigne Contractor hereby swears under penalty of perjury that (1) all previous progress. payments received from the Owner on account of work performed under the contract referred to above have been applied by the undersigned to discharge in full all obligations of the under- signed incurred in connection with work covered by prior Applications for Payment under said contract, and (2) all material and equipment incorporated in said Project or otherwise listed in or covered by this Application for Payment are free and clear of all liens, claims, security interests and encumbrances. Dated June 22 19 gg Arcon Construction Co. , Inc. Contractor By , anaxrtie COUNTY OF- c SS STATE OF Before me on. this day of e, 19 personally appeared known to me, who being TuTy sworn, did depose and say tat he -the of the Contractor above mentioned; ice that he executed the above Applicavion for Pa ent and Affidavit on be of said Contractor; and that al l of the ss�IM.Wt! 1�f1�1" n are tr e, correct a omplete VERA C. 8ES9ER My Commission Exp i res 9 Nou RAMK -UIM wW TA The undersigned has decked the Contractor's Application for Payment shown above. A part of this Application is the Contractor's Affidavit stating that all previous payments to him under this Contract have been applied by him to discharge in full all of his obligations in connection with the work covered by all prior Applications for Payment. In accordance with the Contract, the undersigned approves payment to the Contractor of the Amount Due. Date C� C� /�Z 8 ,5 � ORT E I HE RICKSO I Page 7 of 7