HomeMy WebLinkAbout4.g. Request for Payment #6, White Lake Acres, City Project #1984-5c • APPN LICATIOFOR PAYMENT � CnUNC�I. C E RKS 7 Q 1 • �; ; t�� Ep .. �C 3 01986 (UNIT PRICE .CONTRACT),�� .a. D V�rii�•'�L��V� �F1^: iii^ �1\/Yi e NO. frr V (Revised) ir Owners CITY OF ROSEMOUNT, MN. Owner's Project No. 1984-5 Engineer's Project No. 85039_ LOCATION _ROSEMOUNT, MINNESOTA Contractor Valley -Paving, Inc. Contract Date _8050-D Highway 101 Contract Amount $171,904.25 Shakopee. MN 55379 + Contract for STREET CONSTRUCTION IN WHITE LAKE ACRES - ROSEMOUNT, MINNESOTA. - Application Date November 121, 1986 For Period Ending Ima In, 'IAAF CONTRACT QUANTITY UNIT DESCRIPTION UNIT QUANTITY TO DATE PRICE TOTAL 1. 2021.501 MOBILIZATION L.S. 1 1 $81000.00 $ 8,000. 2. 2101.501 CLEARING _TREE 300 537 4.00 $ 2.-148. 3. 2101.507 GRUBBING TREE 300 552 21.00 $.11,592. 4. 2103.501 REMOVE BUILDING FOUNDATION EACH l 1 18000.00 $--1,000, 5. 2104.521 SALVAGE C.M. CULVERT PIPE L.F. 76 66 6.00 $ 396. 6. 2105.501 COMMON EXCA- VATION (P) C.Y. 42,200 42,200 1.00 $ 4.200. Page _.1._. of SHORT—ELLIOTT—HENDRICKSON, INC. t . APPLICATION FOR PAYMENT - Continued CUR E� 1987 CONTRACT QUANTITY UNIT - DESCRIPTION UNIT QUANTITY TO DATE PRICE TOTAL 7. 2105.505 MUCK EXCA- VATION (P) C.Y. 1,500 1,500 $ 3.00 $4= 8. 2105.522 SELECT GRANULAR BORROW. (P) C . Y . 3,500 3400 5.00 X17.., 50Q.._ 9. 2105.535 SALVAGED TOPSOIL (LV) C.Y. 3,600 3,600 .90 $ 3,242 10. 2111.501 TEST ROLLING R.S. 54 54 8.00 $ 432. 11. 2112.501 SUBGRADE PREPARATION R.S. 54 54 70.00 $ 3,780. 12. 2116.501 CORE EXCAVATION C.Y. 500 203 .50 $ 101_55 13. 2211.503 AGGREGATE BASE PLACE, CLASS 5, (P) C.Y. 1,650 lt65O 8.00 $ 13,200. 14. 2221.503 AGGREGATE SHOULDERING PLACED CLASS 2 (P) C.Y. 825 825 9.60 $__7,920, 15. 2341.504 BITUMINOUS MATERIAL' FOR MIXTURE TON 105 112.49 202.00 $ 22,722.1 16. 2341.508 WEARING COURSE MIXTURE TON 1,750 1,500 9.45 $ 14,175 17. 2501.511 15" R.C. PIPE CULVERT, CLASS IV _ L.P. : 210 198 23.25 $4,603. 18. 2501.511 24" C.M. PIPE CULVERT L.P. 75 75 18.40 $ 1.380. 19. 2501.515 15" R.C. PIPE APRONS EACH 8 10 386.00 $ 3,860. 20. 2501.515 24" C.M. PIPE APRONS EACH 2 3 124.00 $ 372. 21. 2501.571 INSTALL SALVAGED CM PIPE L.F. 50• 42 6.00 $ 252. Page ---z._. of =_ APPLICATION FOR PAYMENT - Continued CLERK8' 2 CONTRACT QUANTITY UNIT.. DESCRIPTION UNIT QUANTITY TO DATE PRICE TOTAL 22. 2554.501 TRAFFIC BARRIER, DESIGN "A" L.F. 970 975 8.60 $ 8,385. 23. 2554.521 ANCHORAGE ASSEMBLIES EACH 4 4 410.00 $ 1.640. 24. 2575.501 ROADSIDE SEEDING ACRE 7.40 g 100.00 25. 2575.502 SEED, MIXTURES LB. 370 1.60 $ 640. 26. 2575.505 SODDING S.Y. 80 = 2.00 $ 27. 2575.511 MULCH MATERIAL TYPE 1 TON 8.3 13.9 150.00 $ 2.085. 28. 2515.511 MULCH MATERIAL TYPE 5 TON 2.50 500.00 $ 29. 2575.519DISC ANCHORING ACRE 4.15 a 75.00 S 600.' ** TOTAL CMMta= QUANTITIES '$180,496.34 Change Order # 1 Bituminous�r L.F. 350 3.00 11050. Remove House & Frame L.S. 1 1500.00 11500. Camoon Excavation C.Y. (DEDUCT)- (1800) 1.00 (11800.) Aggregate Base C.Y. 21 8.00 168. 15" RC Pipe Culvert CL IV L.F. 24 123.25 558. 15" RC Pipe Apron Each 2 386.00 772. Aggregate Shouldering CL 11 C.Y. (DEDUCT) (33) 9.60 (316.80'. ** TOTAL CHANGE ORDER # 1 $1,931.20 ShM ee Order .. # 2 Common Excavat on C.Y. 978 1.00 978. Aggregate Base C.Y. 38 8.00 304. ** TOTAL CHANGE ORDER # 2 $1,282.00 Page 3 of 4 i F5 198? p 1 : APPLICATION FOR PAYMENT - Continued Total Contract Amount $ 171,904.25 Total Amount Earned $77,42,4,28 Material Suitably Stored on Site, Not Incorporated into Work $ Contract Change Order No. _ 1 .Percent, Complete 100% $ 1.93 20 Contract Change Order No. _2 Percent Complete 100% -.—_ $ 1,282.00 Contract Change Order No. Percent Complete GROSS AMOUNT DUE .................. $180,738.18 LESS 5a % RETAINAGE.............. $ ..9#036.91 AMOUNT DUE TO DATE ................ $I71,7D1.27 LESS PREVIOUS APPLICATIONS........ $ 161,397.86` AMOUNT DUE THIS APPLICATION. ... $ I6.303=41 CONTRACTOR'S AFFIDAVIT The undersigned Contractor hereby swears under penalty of purjury that (1) all previous progress payments received from the Owner on account of work performed under the contract referred to above have been applied by the undersigned to di: charge in full all obligations of the undersigned incurred in connection with wi covered by prior Applications for Payment under said contract, and (2) all material and equipment incorporated in said Project or otherwise listed in or covered by this Application for Payment are free and clez of all liens, claims, security interests and encumbrances. Dated November 12 , 1986 Val3ev Pav Inc. (, nt e By ./ A. and Title) COUNTY OF Scott ) President STATE OFMinneso to Before me on this nth day of R Noven+?er , 198 personally appeared known to me, who being duly sworn, did depose and say that he is the Pres ent of the Contractor above Office mentioned: Valley Paving, Inc Ri• ! chard A. Carron that he executed the above Application for Payment and Affidavit on behalf of said Contractor; and that all of the statements contained't re true, correct and complete. ter, My Commission Expires CAIVA a A. tl.,�,� : i ,, .. June ldersi8 .\ ^panty (N aR P*tic) J if. The un gned has thetc' C. 's Application for Payment shown above A part of this Atrli t � `"• ors Affidavit stating that all previc payments to him under this Contract have been applied by him to discharge in ful all of his obligations in connection witch the work covered by all prior Applications for Payment. In accordance with the Contract, the undersigned approves payment to the Contractor of the Amount Due. Date -LZ,� �B6 SHORT -EL 0 -HE ICKSO C. Page 4 _ of 4 By: CLERK'S r FELE 198V-01 With prejudice to Valley Paving, Inc.'s right to maintain a cause of action for disputed amount. atu—re