APPLICATION FOR PAYMENT
NO. s
CITY PROJECT NO: 4-f4 SEH FILE NO: 6,T) 97
PROJECT: /3044- St # S/• oKs c(w
CONTRACTOR: 1l t 1%;"U1 Aac(k*Zj CONTRACT DATE
ZE5LC" Ckdow S APPLICATION DATE:
/
111413. MAI Z SS_107 FOR PERIOD ENDING:
Total Contract Amount $ &$ &96 Total Amount Earned
$
Material Suitably Stored on Site,
Not Incorporated into Work
Contract Change Order No. Percent Complete
$
Contract Change Order No. Percent Complete
$
Contract Change Order No. Percent Complete
$
GROSS AMOUNT DUE ... .......0... .....
$
LESS $ RETAINAGE ...................
$ 66 �
AMOUNT DUE TO DATE ....................
$ /67,46C " �-
LESS PREVIOUS APPLICATIONS ............
S
$ %f�3�,71?-+
AMOUNT DUE THIS APPLICATION ...........
$ My
APPROVED:'
Richard M. Hefti,
City Engineer/Director ofPublicWorks
ucrn�
APPLICATION FOR PAYMENT
(UNIT PRICE CONTRACT)
S�PAUV
NO. 3
Owner: ROSEMOUNT, MINNESOTA
Owner's Project No. 1985-4 & 1985-4A
Engineer's Project No. 85197
LOCATION JAY
SIMON'S ADDITION AREA
Contractor Bituminous Roadways,
Inc. Contract Date
2825 Cedar Avenue
South Contract Amount $182,696.40
e
Minneapolis, MN 55407
Contract for STREET CONSTRUCTION ON 130TH ST. & THE JAY SIMON'S
Pa
Application Date 12/14/86
ucrn�
APPLICATION FOR PAYMENT
(UNIT PRICE CONTRACT)
S�PAUV
NO. 3
Owner: ROSEMOUNT, MINNESOTA
Owner's Project No. 1985-4 & 1985-4A
Engineer's Project No. 85197
LOCATION JAY
SIMON'S ADDITION AREA
Contractor Bituminous Roadways,
Inc. Contract Date
2825 Cedar Avenue
South Contract Amount $182,696.40
e
Minneapolis, MN 55407
Contract for STREET CONSTRUCTION ON 130TH ST. & THE JAY SIMON'S
ADDN.
Application Date 12/14/86
For Period Ending 12/01/86
APPLICATION FOR PAYMENT
CONTRACT QUANTITY UNIT
DESCRIPTION UNIT
QUANTITY TO DATE PRICE
TOTAL
0563.601 TRAFFIC CONTROL
DEVICES L.S.
1 1 $1,200.00
$ 1,200.00
2021.501 MOBILIZATION L.S.
1 1 1,018.00
$ 1,018.00
2101.501 CLEARING ACRE
4 4 880.00
$ 3,520.00
GRUBBING ACRE
4 4 880.00
3,520.00
Page -1 of 5
SHORT-ELLIOTT-HENDRICKSON, INC.
Ncumm
198?.
� 2_
APPLICATION FOR PAYMENT
- Continued
CONTRACT
QUANTITY
UNIT
DESCRIPTION
UNIT
QUANTITY
TO DATE
PRICE
TOTAL
2104.521
SALVAGE CM PIPE
CULVERT
L.F.
705
224
$4.00
$ 896.00
2105.501
COMMON EXCAVATION
7542
(p)
C.Y.
7,542
1.70
$ 12.821.40
2105.521
GRANULAR BORROW
yyao ,►uTl
ZZ, loo
(C. V.)
C.Y.
800
5748
5.00
$
2105.535
SALVAGED TOPSOIL
(L. V.)
C.Y.
1,434
1434.
3.25:
$ 4,660.50
2111.501
TEST ROLLING
RD. STA. 70
70
5.00
$__0.00
2112.501
SUBGRADE PREP.
R.S.
70
70
68.00
$ 4.760.00
2116.501
CORE EXCAVATION
C.Y.
500
740
3.00
$-_2-.220.00
2116.503
AGGREGATE
BACKFILL
C.Y.
500
740
5.65
$ 4,181.40
2211.503
AGGREGATE BASE
PLACED, CLASS 5
C.Y.
2,150
2150
9.45
$ 20,317.50
2221.503
AGGREGATE SHOULDERING
~"
PLACED, CLASS 2
C.Y.
1,150
1150
14.85
$ 1747.50
2341.504
BITUMINOUSMATERIAL
�yq
L
FOR MIXTURE
TON
140
152.7
148.00
$
2341.508
WEARING COURSE
MIXTURE
TON*
2,300
2776.14
10.30
$ . 25
2501.511
12" CM PIPE
CULVERT
L.F.
450
128
13.90
$ 1,779.20
2501.511
15" R.C. PIPE
CULVERT
L.F.
625
630
20.85
$13,13 .50
2501.515
12" CM PIPE
APRON
EACH
30
4
65.00
$ 260.00
Page 2
of 5
A
APPLICATION FOR PAYMENT —Continued
F� 1987 0 2
CONTRACT
QUANTITY
UNIT
DESCRIPTION
UNIT
QUANTITY
TO DATE
PRICE
TOTAL
2501.515
15" R.C. PIPE
APRON
EACH
15
-36
$275.00
$
4,400.00
2501.521
28-1/2" SPAN RCP
CLASS III
L.F.
36
36
38.00
$
1,368.00
2501.525
28-1/2" SPAN RCP
CLASS III
APRONS
EACH
2
2
365.00
$
730.00
2501.571
INSTALL SALVAGED
CM PIPE CULVERT
L.F.
352
229
4.60
$--1.053.40
2506.509
CONSTRUCT CATCH
BASIN, TYPE Z
EACH
1
1
850.00
$ 850.00
2511.515
GEOTEXTILE FILTER,
TYPE IV
S.Y.
1,500
1879
1.50
$x,818.50
2511.515
RANDOM RIPRAP,
CLASS II
C.Y.
150
144.1
40.00
$
5,764.00
2535, 501
BITUMINUS CURB
L.F.
1,690
1615''
2.95
$
4,764.25
2554.501
PERMANENT
BARRICADES
L.P.
16
16
22.00
$
352.00
2554.501
TRAFFIC BARRIER,
DESIGN 8330
L.F.
555
600
5.85
$_-3,510
00
2554.501
TRAFFIC BARRIER,>
DESIGN A8307
L.F.
654
638
9.85
$
6.284.30
2554.523
TWISTED END
TREATMENT
EACH
2
2
420.00
$
840.00
-. 2575.501
ROADSIDE
SEEDING
ACRE
4.7
160.00
$
2575.502
SEED MIXTURE
LBS.
355
2.30
$
Page 3
of 5
'
CLERK'S
fltf
1 9 8
2
APPLICATION
FOR PAYMENT -
Continued
DESCRIPTION
CONTRACT
QUANTITY
UNIT
UNIT
QUANTITY
TO DATE
PRICE
TOTAL
2575.505 SODDING
S.Y.
140
3.15
2575.511 MULCH MATERIAL,
TYPE 1
TON
9.4
175.00
$
2575.519 DISC ANCHORING
ACRE
4.7
42.00
$
Page 4 of 5
•APPLICATION FOR PAYMENT - ContinuedCLFRK'S 1987 _
, ` FILE .�1 qCofitract Amount $ 182 696.40 Total Am �8
' Amount Earned $ ,
ate`rial Suitably Stored on Site, Not Incoporated into Work
Contract Change Order No. Percent.Complete
Contract Change Order No _ percent Complete
Contract Change Order No. Percent Complete $
98
GROSS AMOUNT DUE.. . ... $ 97, 331
LESS 5 % RETAINAGE......... $ ,8z
AMOUNT DUE TO DATE.. $?, 465.
LESS PREVIOUS APPLICATIONS..... $ 103,224.38
CONTRACTOR'S AFFIDAVIT
AMOUNT DUE THIS APPLICATION.... $���'
he undersigned Contractor hereby swears under penalty of perjury that (1) all previous
payments received from the Owner o account of work performed under the contract referreo
dtoess.
above have been applied by the undersigned to discharge in full all obligations of the under-
signed incurred in connection with work covered by prior Applications for Payment under said
contract,
material and and (2) all.
equipment incorporated in said Project or otherwiselisted in or covered by this
Application for Payment are free and clear of all liens, claims, security interests and
encumbrances
Dated 19 __. BITUMINOUS ROADWAYS, INC,
r
1tQ_0 n t r for
iAn
Name an Ti e
COUNTY OF ) SS
STATE OF )
Bef me on th' day of , 19 �L Q{
nown to me w personally ap
and say that e, is he o beingul"y sworn, did
of the Contractor above menti
�Office
that he executed the above Application for Payment andAffida,_ t on behalf of said eGr
and that a'1l of the stat aiAk]''.1.
i tru correct a co lets. ? Z
4Y Commission Expires: d FRf otary PubMy C' F.
20. logo
he undersigned has checked the Contractor s pp cation for Payment shown above. A art of
:his Application is the Contractor's Affidavit statin that all p
him
ender this Contract have been applied by him to discharge in full all payments
in
tnnection with the work covered by all prior Applications for Payment: