HomeMy WebLinkAbout7.c. Accept Petition / Order Feasibility Report - Broback Industrial Park Street Improvement, City Project #170cc's 19 87 p 5
fill
DATE: FEBRUARY 25, 1987
TO: ADMINISTRATOR JILK
FROM: QTY ENGINEER HEETI
RE: RECEIPT OF PETITION FOR BROBACK INDUSTRIAL PARK
SHEET IMPROVEMENT, PROTECT 170
I have received a petition from the owners of six of the ten
industrial lots located within the Broback Industrial Park
.Addition requesting the installation of a street to serve all
ten lots. This amounts to 55% of the frontage of the affected
property owners.
I would recommend that the Council accept the petition and
order the preparation of a feasibility report. I feel that I
can prepare the feasibility report because the major portion
of the detail design plan was completed by S.E.H., Inc. in
1974.
I will be available at the March 3, 1987 Council meeting to
answer any questions which may arise pertaining to this
matter.
cc: Dean Johnson, Community Development Director
ufRK's 1987 05
FILE
ar
I
�
I
i
I
11
1AR T1
UTIOT 1
011-80
010-7f
C S. A H
010-01
no
r`• Offs 1987 0 5 PETITIOrd E ", e.k�,�,"p I , lam+
To: City Council of City of Rosemount I -E0 171987
('— Ll� RK S OFFICE
Subject: Broback Industrial Park t- Y OF ROSEMOUNT
1. Each petitioner owns one or more parcels of real prop-
erty within the above portion of the City of Rosemount.
2. The properties owned by the respective petitioners are
set forth along with their signatures at the bottom of this peti-
tion.
3.. Petitioners hereby request that the following local
improvements be undertaken: Install curb and gutter, and blacktop
the streets.
Wherefore petitioners request that the City Council declare
its intent to make such local improvements and to take such other
steps to enable these improvements to be completed.