Loading...
HomeMy WebLinkAbout6.b. Approve Final Payment / Accept Utilities - West Ridge 1st Addition0 APPLICATION FOR PAYMENT (UNIT PRICE CONTRACT) NO. 2 Final CLOWS FILE 1987 1 3 ,,r,tU 10 (;UU11w, MAY 2 81987 %WM Owner: ROSEMOUNT, MINNESOTA Owner's Project No. 1986-6 Engineer's Project No. 87013 LOCATION ROSEMOUNT, MINNESOTA Contractor McNAMARA CONTRACTING CO. Contract Date 14605 JOHNNY CAKE RIDGE RD _Contract Amount $101,737.50 APPLE VALLEY, MN. 55124 Contract for STREET CONSTRUCTION IN PHASE I WEST RIDGE FIRST ADDITION Application Date March 26, 1987 For Period Ending March 26, 1987 Final APPLICATION FOR PAYMENT CONTRACT QUANTITY UNIT DESCRIPTION UNIT QUANTITY TO DATE PRICE TOTAL 2021.501 MOBILIZATION L.S. 1 100% $1, 500.00 $ 1,500.00 210 5.501 COMMON EXCAV . C.Y. 1, 000 1,104 2.00 $2,208.00 2105.521 GRANULAR BORROW (L.V.) C.Y. 1,000 390 3.50 $ 1,365.00 Page 1 of 3 SHORT-ELLIOTT-HENDRICKSON, INC. APPLICATION FOR PAYMENT Continued COWS 1987 23 CONTRACT QUANTITY UNIT DESCRIPTION UNIT QUANTITY TO DATE PRICE TOTAL 2111.501 TEST ROLLING R.S. 20 29 $ 5.00 $ 145.00 2112.501 SUBGRADE PREP. R.S. 29 29 120.00 $ 3,480.00 2116.501 CORE EXCAVATION C.Y. 250 0 4.00 $ --- 2116.503 AGGREGATE 0 BACKFILL C.Y. 250 4.00 $ --- 2211.503 AGGREGATE BASE PLACED, CL. 5 C.Y. 1,000 1,070 10.75 $11,502.50 0211.503 4" AGGREGATE BASE FOR SIDEWALK, CL. 5 S.F. 5,200 C.O. deleted .30 $deleted 2341.504 BITUMINOUS MATERIAL FOR MIXTURE TON 121 97.83 125.00 $12,228.75 2341.508 WEARING COURSE MIXTURE TON 1,100 1,086.90 10.50 $11,412.45 2341.510 BINDER COURSE MIXTURE TON 1,100 845.62 11.00 $ 9,301.82 2357.502 BITUMINOUS MATERIAL FOR TACK COAT GAL. 450 325 1.35 $ 438.75 0504.602 ADJUST VALVE BOX EACH 4 8 100.00 $ 800.00 2506.522 ADJUST FRAME AND RING CASTING EACH 14 28 150.00 $ 4.200.00 2521.511 2" BITUMINOUS WALK S.F. 5,200 C.O. deleted .75 $ deleted 2531.501 CONCRETE CURB AND GUTTER, DESIGN D418 L.F. 6,000 5,667 5.05 $28,618.35 2554.505 PERMANENT BARRICADES L.F. 48 48 15.00 $ 720.00 Page 2 of 3 APPLICATION FOR PAYMENT - Continued Total Contract Amount $ 101, 737.5 Total Amount Earned* Material Suitably Stored on Site, Not Incoporated into Work Contract Change Order No. Percent -Complete Contract Change Order No. Percent Complete Contract Change Order No. Percent Complete COK`S 1987FILE 3 $ 87,920.62 GROSS AMOUNT DUE ............... $ 87,920.62 LESS 0 % RETAINAGE......... $ 0.00 AMOUNT DUE TO DATE ............. $ 879920.62 LESS PREVIOUS APPLICATIONS..... $ 85,245.91 AMOUNT DUE THIS APPLICATION $ .2,674.71 CONTRACTOR'S AFFIDAVIT The undersigned Contractor hereby swears under penalty of perjury that (1) all previous progress. payments received from the Owner on account of work performed under the contract referred to above have been applied by the undersigned to discharge in full all obligations of the under- signed incurred in connection with work covered by prior Applications for Payment under said contract, and (2) all material and equipment incorporated in said Project or otherwise listed in or covered by this Application for Payment are free and clear of all liens, claims, security interests and encumbrances. Dated March 26, , 19 87 . By COUNTY OF Goodhue ) SS STATE OF Minnesota ) McNamara Contracting Co. Vice President Before me on this 26th day of March , 19 87 personally appeared Kevin McNamara known to me, w o being—cuTy sworn, did depose and say that he is the Vice President of the Contractor above mentioned (Office) that he executed the above Application for Payment and Affidavit on behalf of said Contractor; and that all of the statements contained therein are tr, correct and compJ ete. �l �IAAAsAAA A .. )", /% 4 /J/i J/ My Co E i'T'; .&f A : A,4Ay� 7 hntAn. ,..!�t H. silm '^� Notar Public Alyvn"sSSDHUE C UN YESOTA The un fi btractor's Application for Payment shown above. A part of this Application is""ofllxr�era�#.o's Affidavit stating that all previous payments to him under this Contract have been applied by him to discharge in full all of his obligations in connection with the work covered by all prior Applications for Payment. In accordance with the Contract, the undersigned approves payment to the Contractor of the Amount Due. / SHORT EL T HE RICKSO I Date s! �'�f 8� By Page 3 of 3