Loading...
HomeMy WebLinkAbout4.d. Application #2 - Lift Station #1APPLICATION AND CERTIFICATE FOR PAYMENT AIA DOCUMENT 0702 ` •PAGE ONE OF ? •PAGES PROJECT: ARCHITECT: CURRENT PAYMENT DUE ......................... (name, address) City of Rosemount City Contract 1987-01 2875 - 145th St. W. ARCHITECT'S PROJECT NO: Lift Station #1 Renovations Rosemount, M 55068 Approved Our Job No. 284 TO (Owner) CONTRACTOR: Attn: Richard Heft CONTRACT FOR: APPLICATION DATE: July 29, 1987 APPLICATION NO: 2 I ATTN: PERIOD FROM: TO CHANGE ORDER SUMMARY Application is made for Payment, as shown below, in connection with the Contract. Continuation Sheet,AIA Document G702A, is attached. Change Orders approved ADDITIONS $ DEDUCTIONS S in prenotts months by The. present status of the account for this Contract is as follows: TOTALS Net change by Change Orders $ State of: County of: The undersigned Contractor certifies that the Work covered by this Appli- cation for Payment has been completed in accordance with the Contract Documents, that all amounts have been paid by him for Work for which previous Certificates for Payment were issued and payments received from the Owner, ^and that the current payment shown herein is now due. Contractor. ; ipeC Co t- act ' g Inc. ORIGINAL CONTRACT SUM ...................... S 44,219 z-00 Net change by Change Orden ...................S 0 CONTRACT SUM TO DATE .................. S_44,219.00 TOTAL COMPLETED & STORED TO DATE ......... (Column G on G702A) RETAINAGE 5 % ................. S or as noted in Column I on G702A TOTAL EARNED LESS RETAINAGE ........ ........S'�`'� 35�75� LESS PREVIOUS CEmncATFS FOR PAYMENT ........ S 7,630-00 CURRENT PAYMENT DUE ......................... Owner— ^''�) TOTAL Subsequent ChangeOrdets Number Approved (date) TOTALS Net change by Change Orders $ State of: County of: The undersigned Contractor certifies that the Work covered by this Appli- cation for Payment has been completed in accordance with the Contract Documents, that all amounts have been paid by him for Work for which previous Certificates for Payment were issued and payments received from the Owner, ^and that the current payment shown herein is now due. Contractor. ; ipeC Co t- act ' g Inc. ORIGINAL CONTRACT SUM ...................... S 44,219 z-00 Net change by Change Orden ...................S 0 CONTRACT SUM TO DATE .................. S_44,219.00 TOTAL COMPLETED & STORED TO DATE ......... (Column G on G702A) RETAINAGE 5 % ................. S or as noted in Column I on G702A TOTAL EARNED LESS RETAINAGE ........ ........S'�`'� 35�75� LESS PREVIOUS CEmncATFS FOR PAYMENT ........ S 7,630-00 CURRENT PAYMENT DUE ......................... $ ^''�) %v^ t -'f�• Subscribed and swam to before me this day of '19 Notary Public: My Commission expires: r h1 accordance tath th ontract i;d this Ap�pli tion for Payment the Cuntractor is entitled to payment in the amount shown above. ❑ OWNER ❑ ARCHITECT Y �' 7 �.- ❑ CONTRACTOR illi. Certatt ate r, not negotral)14% It r, payable only to the payed named heroin and ih i:wancc, paynto.nt and acceptanre are without preµuiice Its any right-, rat the Owner of C•nnlrar for unr).•r th,-:: r nnlrai VA 1)tH.UA11NI (.:U2 if ;.I itlra ,SNI) t IKtlttt;tll I( JR I'M \itNI • MARC1111171 11Itil()N . AIA•■) i CONTINUATION SHEET AIA DOCUMENT 0703 PAGE 2 OF 2 PAGES AIA Document 0702, APPLICATION AND CERTIFICATE FOR PAYMENT, containing APPLICATION NUMBER: 2 Contractor's signed Certification is attached. APPLICATION DATE: In tabulations below, amounts are stated to the nearest dollar. PERIOD FROM: Use Column I on Contracts where variable retainage for line items may apply. TO: ARCHITECT'S PROJECT NO: A B C D E F G H ITEM DESCRIPTION OF WORK SCHEDULED WORK COMPLETED TOTAL COMPLETED AND STORED % BALANCE RETAINAGE This Application No. VALUE Previous TO DATE {G -i -Cl TO FINISH IC—Gi Stored Materials Applications Work in Place (not in D or E) (D+E+F) 1 Bonds &'Insurance 2,390 2,390 2,390 100 2 Electric Work 6,600 1;980 6,270 95 3 Saw Cutting 1,000 900 1,000 100 4 Demolition & Removal 8,000 1,600 8,000 100 5 Temporary Pumping 4,200 0 4,200 100 6 Ptanp Installation 21,029 1,161 4- 93' 7 Clean & Paint 1,000 0 0 0 341=8$ Totals to Date 44,219 8,031 AIA DOCUMENT 6793 • CONTINUATION SHEET • APRIL 1978 EDITION • AIAO • m 1978 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W., WASHINGTON, D.C. 20006 6703-1978 �. 1