HomeMy WebLinkAbout5.h. Approve Change Order #1, Shannon Park 1st Addition Utilities.... a he DATE: AUGUST 13, 1987 TO: MAYOR & CITY COUNCIL c/o CITY ADMINISTRATOR JILK FROM: CITY ENGINEER HEFTI W— RE: ITEMS FOR THE AUGUST 18, 1987 COUNCIL MEETING OLD BUSINESS 5h. Approve Change Order #1 to Contract 1987-2, Shannon Park 1st Addition Attached is Change Order #1 to the Shannon Park lst Addition project consisting of an addition of $9,381.60. The extra work consisted of adding some valves which were necessary to insure that we can isolate the system. In addition, the Developer requested to include the water service connections which were not originally included and were the - Developers responsibility. Also, because of some minor grade changes we had to reconstruct some manholes. Finally, we had to restore the bike trail because the contract anticipated the Developer had to use a temporary access onto 145th Street until Shannon Parkway was constructed. Now that Shannon Parkway will be under construction this fall, the Developer will not have to construct a paved entrance and therefore the reason for the bike trail repair. With the exception of the oversizing cost of the additional valves, the remaining cost are the responsibility of the Developer and we will propose to assess them accordingly. Distribution Contractor 2 Owner 1 Resident Engineer 1 St. Paul Office 1 Short -Elliott -Hendrickson, Inc. 222 East Little Canada Road Saint Paul, Minnesota 55117 w0w R-C USHORT-ELLIOTT-HENDRICKSON INC. CHANGE ORDER DATE: AUGUST 5, 1987 LOCATION: SHANNON TOWNHOUSES PARK 1 CITY OF CHANGE ORDER NO.OWNER.: . ROSEMOUNT PROJECT NO. 174 FILE NO.: 87088 Nature of Change Description and Cost: Revise the contract work items and cost as follows: 1. Add 1-12" butterfly valve & box w/cut-in connection Lump Sum $+1,900.00 2. Delete item 0257.805 (12"x12" pressure tap w/12" gate valve and box Lump Sum -2,185.00 3. Add 2-12" butterfly valve & box w/cut-in connection Lump Sum +3,100.00 4. Add 8 1-1/2" water service connections (includes tapping saddle, corporation stop, curb stop & box & fence post) @ $300/serv. +2,400.00 5. Add 160 LF of 1-1/2" copper water service @ $18.51/LF +2,961.60 6. Reconstruct MH 1 - 1 LF @ $175/LF +175.00 Con' t . . . . , Is Cost Actual or Estimated? Actual This authorizes Contractor to perform this work as part of Base Contract when signed by all parties. Recommended for Approval: Short-Elliott-Hendrickson, Inc. By Approved for Owner: Agreed t y ontr tor: By Title B Distribution Contractor 2 Owner 1 Resident Engineer 1 St. Paul Office 1 Short -Elliott -Hendrickson, Inc. 222 East Little Canada Road Saint Paul, Minnesota 55117 ty Change Order No. 1 City of Rosemount SEH File: 8708$ Page 2 7. Reconstruct MH 3 - 1 LF @ $175/LF +175.00 8. Add 1' MH Section (material cost) 3 each @ $30/EA +90.00 9. Restore Bituminous Bike Trail 9 tons bituminous mixture @ $85/TON +765.00 TOTAL CHANGE ORDER $ +9,381.60