HomeMy WebLinkAbout10.a. RTB Meeting Report and RecommendationM E M O R A N D U M
TO: Steve Jilk
FROM: Lee Knutson
DATE: September 23, 1987
RE: RT8 Meeting
Attached is the public officials' briefing handout which is a brief
outline of a lengthy presentation by Elliott Perovich at this meeting.
As I listened to the discussion and comments from staff and those in
attendance, I would like to recommend to you and the Council that some
time be spent by you and staff on the following:
(1) Put together some of the background and facts as they relate to our
"opt out" proposal.
(2) Contact our RTB representative Ed Kranz for a meeting to be
scheduled with the S.W. Mobility group for information on how they
established their plan.
(3) Set up another, or a series of meetings on discussion with
transportation providers for their input on the "opt out proposal.
(4) Check to see how active our Dakota County Light Rail Transit
Commission may be.
(5) Prepare a report for Council to consider in late October.
After the meeting, I had an opportunity to visit with Glen Olson, the
MTC chairman, about the route #46 termination. They will be discussing
the results at the hearing and the staff recommendations on
September 23, 1987. I asked that he strongly consider continuation of
the service in light of the growth and the potential for our area.
smj
cc Councilmembers Napper, Tucker, Walsh, Willard
REGMALYMNSti BOARD
270 Metro Square Building
St. Pout, Minnesota 55101
612/292-6789
A} BACKGROUND Public Officials' Briefing Sheet
Metropolitan Transit System - The Regional Transit Board is responsible
for transit planning, policy making and.administration in the Twin Cities
Metropolitan Area. There are 43 contracts for various publicly subsidized
transit services in the seven-county area. They range from the largest
system, which is the Metropolitan Transit Commission (MTC), to several
small rural systems serving the special transit needs of the elderly. The
MTC has an annual ridership of approximately 72 million per year and an
annual operating budget of about $100 million. The RTB's responsibilities
include the policy direction and contract administration of Metro Mobility,
the area's largest public paratransit system for disabled citizens in the
metropolitan area. Funds to operate metropolitan transit come from fares
(about 35 percent), state grants (10 percent), federal grants (8 percent)
and property taxes (47 percent) The total 1987 transit budget for the
metropolitan area is $112 million.
P_
``
The STB is composed of eight board members and a chair. The board members
represent eight metropolitan districts and are appointed to four year terms
by the Metropolitan Council. The RTB chair is appointed by and serves at
the pleasure of the Governor. The 28-member staff includes planners,
program administrators, fiscal personnel, public information and support
staff.
Greater Minnesota Transit There are 44 Greater Minnesota transit
systems administered by the Minnesota Department of Transportation
(Mn/DOT). The systems range from regular route systems, such as those that
operate in Duluth and Rochester, to very small special service systems,
such as Upsala and Cottonwood County. The total operating costs of these
contracts totalled about $14.4 million in 1985. State grants contributed
approximately $5 million of this figure.
B) 1988-89 STATE FUNDING
The percentage of funding from different sources has changed over the past
decade. Current concerns relate to the decline in federal support for
transit operations and the subsequent increase in reliance on state funding
and local property taxes in many communities. In keeping with the
legislative recommendation in 1984, the RTB is working toward establishing
a funding base composed of 35 percent fare revenues, 35 percent property
taxes, 20 percent state aid and 10 percent federal support. The RTB also
envisions the State Motor Vehicle Excise Tax as providing long-term, stable
financing structure for transit.
OVER
An Equal Opportunity Ernpfoyer
0
METRO TRANSIT ASSISTANCE
(000's)
Metro Ivio iity - There has been a significant increase in the number of
rides provided by Metro Mobility. This service is a special door -through -
door transportation system for certified disabled people. In October 1986,
he program was restructured to make the system more cost-effective. The
egislature appropriated an additional $1.5 million in this biennium,
ncreasing the amount to $12.5 million. The combination of the
structuring and the additional appropriation increased the number of
raiiable rides by 45 percent over the number of rides available under the
)rmer program. The system can now accommodate 65,000 trips per month at a
onthly cost of $520,000.
Higher than projected ridership first occured in March 1987 and the program
used previously unspent, allocated funds to provide all rides requested.
At that time, it was anticipated that the seasonal pattern of declining
summer ridership would bring the subsidy in alignment with the amount
allocated. After reaching a record high of 69,700 rides in April,
ridership continued to climb. In June, more than 73,500 elderly and
disabled passengers rode Metro Mobility, a 75 percent increase from last
year.
The RTB is currently examining options on how the serivice can meet the
demand for rides to minimize the adverse impact on is riders when rides are
restricted by a daily allocation limit.
Light Rail - The RTB is proceeding with the preliminary engineering
process in the Region's identified first priority corridor - University
Avenue between the two downtowns. The RTB requested $3,5 million this
biennium to proceed with this project, but was appropriated only $400,000.
Attempting to obtain the necessary dollars and determining the best process
to lead to the construction on LRT on University Avenue, are high
priorities for the RTB. The RTB also supports the need for regional
coordination of any other LRT efforts being proposed by other governmental
agencies.
Agency
Legislative
1986/87
Request
%
Appropriation
%
Biennium
1988/89
Change
1988/89
Change
Metro Mobility
$11,000
$12,500
13.6
$12,500
0.6
Transit Service Contracts
26,020.8
27,403
5.3
25,800
(.8)
Light Rail Transit
3,500
----
400
----
Planning & Programs (RTB)
1,750
2,324
13.3
1,500
(14.3)
Administration (RTB)
2,165
764
(64.8)
700
(67.7)
$40,935.8
$46,491
13.6
$40,900
GREATER MINNESOTA
TRANSIT
ASSISTANCE`
Agency
Legislative
1986/87
Request
%
Appropriation
%
Biennium
1988/89
Change
1988/89
Change
Greater Minnesota
$11,600
$12,500
7.2
$11,600*
0
* $80,000 will be used for
two staff positions
in the Office of Transit
C) TRANSIT ISSUES
Metro Ivio iity - There has been a significant increase in the number of
rides provided by Metro Mobility. This service is a special door -through -
door transportation system for certified disabled people. In October 1986,
he program was restructured to make the system more cost-effective. The
egislature appropriated an additional $1.5 million in this biennium,
ncreasing the amount to $12.5 million. The combination of the
structuring and the additional appropriation increased the number of
raiiable rides by 45 percent over the number of rides available under the
)rmer program. The system can now accommodate 65,000 trips per month at a
onthly cost of $520,000.
Higher than projected ridership first occured in March 1987 and the program
used previously unspent, allocated funds to provide all rides requested.
At that time, it was anticipated that the seasonal pattern of declining
summer ridership would bring the subsidy in alignment with the amount
allocated. After reaching a record high of 69,700 rides in April,
ridership continued to climb. In June, more than 73,500 elderly and
disabled passengers rode Metro Mobility, a 75 percent increase from last
year.
The RTB is currently examining options on how the serivice can meet the
demand for rides to minimize the adverse impact on is riders when rides are
restricted by a daily allocation limit.
Light Rail - The RTB is proceeding with the preliminary engineering
process in the Region's identified first priority corridor - University
Avenue between the two downtowns. The RTB requested $3,5 million this
biennium to proceed with this project, but was appropriated only $400,000.
Attempting to obtain the necessary dollars and determining the best process
to lead to the construction on LRT on University Avenue, are high
priorities for the RTB. The RTB also supports the need for regional
coordination of any other LRT efforts being proposed by other governmental
agencies.