HomeMy WebLinkAbout4.d. Application for Payment #1, Acron Construction, City Projects #168 & #1710
APPLICATION FOR PAYMENT
5 v'�
No. 1
Project: Rosemount, Minnesota- --- Shannon Parkway
Owner: City of Rosemount
Project No.: 168 & 171
Contractor: Arcon Construction Co. Inc.`���-
Application Date: 10-19-87 For Period Ending: 10-16-87
STATEMENT OF WORK
Original Contract Amount 1,073.560.12
Net Change by Change Order
..
• i+J� Ora ;fl� - � x+ 'Y 1 "�. 4 x _ I xa w5 � .t � t � s ter ij :k' fSdp ° � •, Y i'y%` � a y�� � { .
A t a'7tie r� 5,
#j 13 p .z
Kit r� �r t: .. n„!j � .i _./"fes ,f� i }i tt'.�� f � f.�t•;r}� .T�e:!
s
Gros� un_r� ego
Less 5% ; Retainage
. Amount Due to Date
3l 3 8'J -Z. i'� -• 1 2 t 7 i'8 73o, 3/
Less Previous Payments _p... _
Payment Due This Application � .�-r 14,522.59 3o. -3/
�
59387 - '
DuE =&le
= r
Y •
APPLICATION FOR PAYMENT
No. l
Project: Rosemount, Minnesota - Shannon Parkway
Owner: City of Rosemount
Project No.: 168 & 171
Contractor: Arcon Construction Co. Inc.
Application Date: 10-19-87 For Period Ending: 10-16-87
STATEMENT OF WORK
Original Contract Amount 1,073.560.12
Net Change 'b
y Change Order -
ExraWor
.. t .XPi,.•
�y'� .y K... e'•.Z t = .. � •' L '� '�i'}`YY + �ti,,e.h �y ; d y
sr sZ•:il+��'
p-yv �,„, ;✓y t' z �.v;"i<:?A-R'YT{, n%7?'.2��. �'Ai ortr w< �.
i :{5"�!i.ss'$.•..�:i.'xit . �. •4i{CT��dt°iF'•3'.f+��l�'�i �.91� r��.::N3'�
- .•y. Lii...'7FFiC } 2�e
�
Gro Amoun �;,s a moo,
Less5 -Retainage
�J�l ..3,5
/p/3S8 `�•.�-$ �,f ,- _. ].: 22.50 VW.S2
Less Previous Payments
Payment Due This Application
NOTE:
��l
APPLICATION FOR PAYMENT
= ECEIV D
SNORT ELLIOTT HENDRICKSON, INC.
( UNIT PRICE CONTRACT) OCT 27 1987
NO.
---I--- S1. PAUL
QUANTITIES AND UNIT PRICES HAVE BEEN REVISED IN ACCORDANCE WITH
CHANGE ORDER NO. 1
OWNER: ROSEMOUNT, MINNESOTA OWNER'S PROJECT NO. 168 & 171
ENGINEER'S PROJECT NO. 87122
----------------
LOCATION: ROSEMOUNT, MINNESOTA
------------------------------
CONTRACTOR
ARCON CONSTRUCTION CO.,
INC.
CONTRACT
DATE
903 E. FOREST AVE., BOX
57
CONTRACT
-------------------------
AMOUNT
$1,073,560.12
MORA, MINNESOTA 55051
-------------------------------
------------------
CONTR. FOR
SHANNON PARKWAY STREET AND UTILITY CONSTRUCTION
- S.A.P.
208-106-02
APPLIC.DATE
-------------------------------------------
-------------------------
PERIOD END.
-------------------------
APPLICATION FOR PAYMENT
-----------------------
CONTRACT
QUANTITY
UNIT
DESCRIPTION
UNIT
QUANTITY
TO DATE
PRICE
TOTAL
2021.501
MOBILIZATION
L.S.
--------------------------------------
•50
1
14322.00
$
7,161.00
2101.501 ,
CLEARING
TREE
21
20
61.38
$
1,288.98
2101.506
GRUBBING
TREE
21
20
61.38
$
1,288.98
2104.501
REMOVE CONCRETE CURB
AND GUTTER
L.F.
1050
2.04
$
2104.521
SALVAGE CM PIPE CULVERT
L.F.
20
5.11
$
2104.501
REMOVE PIPE CULVERTS
L.F.
20
58
5.11
$
102.20
2104.509
REMOVE MANHOLES OR
CATCH BASINS
EACH
2
_3
204.60
$
409.20
PAGE 1 OF 7 SHORT-ELLIOTT-HENDRICKSON, INC.
PAGE 2 OF 7 SHORT-ELLIOTT-HENDRICKSON, INC.
2105. 501
COMMON EXCAVATION (P)
C.Y. 36706
42833
1.30
$
47, 717.80
2105.511
COMMON CHANNEL
EXCAVATION
C.Y.
438
1.38
$
2105.535
SALVAGED TOPSOIL (L.V.)
C.Y.
5825
1.22
$
2111.501
TEST ROLLING
RD.STA
96
102.30
$
2112.501
SUBGRADE PREPARATION
R.S.
96
153.45
$
2116.501
CORE EXCAVATION
C.Y.
1200
1.22
$
2211.503
AGG BASE PLACED CL 5 (P)
C.Y.
8495
8.18
$
2211.504
AGG. BASE PLACED FOR
WALK, CLASS 5 (P)
C.Y.
996
10.23
$
2221.503'
AGGREGATE SHOULDERING
PLACED, CL. 2
C.Y.
30
33.75
$
2331.504
BITUMINOUS MATERIAL FOR
MIXTURE
TON
229
163.68
$
2331.514
BASE COURSE MIXTURE
TON
5077
6.64
$
2341.504
BITUMINOUS MATERIAL FOR
MIXTURE
TON
330
184.14
$
2341.508
WEARING COURSE MIXTURE
TON
5077
7.67
$
2357.502
BITUMINOUS MATERIAL FOR
TACK COAT
GAL.
2635
1.02
$
2501.515
15" RC PIPE APRON_
W/TRASH GUARD
EACH 3
9
423.52
$
1,270.56
-2501.515
18" RC PIPE APRON
W/TRASH GUARD
EACH 1
1
478.76
$
478.76
2501.515
21" RC PIPE APRON
W/TRASH GUARD
EACH
1
556.51
$
2501.515
24" RC PIPE APRON
W/TRASH GUARD
EACH
1
630.16
$
2501.515
27" RC PIPE APRON
W/TRASH GUARD
EACH 1
1
760.08
$
760.08
2501.515
42" RC PIPE APRON
W/TRASH GUARD ..
EACH
2
1265.45
$
2503.511
12" RCP STORM SEWER,
DES. 3006, CL. V
L.F. 495
1298
19.14
$
9.474.30
PAGE 2 OF 7 SHORT-ELLIOTT-HENDRICKSON, INC.
2503.511 15" RCP STORM SEWER,
DES. 3006, CL. V L.F. 378 1143
2503.511 18" RCP STORM SEWER,
19.14 $ 7,234.92
PAGE 3 OF 7 SHORT-ELLIOTT-HENDRICKSON, INC.
DES. 3006, CL. V
L.F.
913
850
21.33
$
19,474.29
2503.511
21" RCP STORM SEWER,
DES. 3006, CL. V
L.F.
651
1489
23.14
$
15,064.14
2503.511
24" RCP STORM SEWER,
DES. 3006, CL. IV
L.F.
70
1040
26.30
$
1,841.00
2503.511
27" RC PIPE SEWER,
DES. 3006, CL. IV
L.F.
18
18
47.21
$
849.78
2503.511
30" RC PIPE SEWER,
DES. 3006, CL. IV
L.F.
995
1381
34.31
$
34, 138.45
2503.511
36" RC PIPE SEWER,
DES. 3006, CL. IV
L.F.
1972
69.99
$
2503,511
42" RC PIPE SEWER,
DES. 3006, CL. IV
L.F.
50
467
79.18
$
3,959.00
0503.608
15" RCP STORM SEWER,
JACKED
L.F.
78
113.55'$
0503.608
36" RCP STORM SEWER,
JACKED
L.F.
120
360.02
$
2504.602
ADJUST GATE VALVE BOX
EACH
6
98.20
$
2506.506
CONSTRUCT MANHOLE,
DESIGN B
L.F.
30
141
122.35
$
3,670.50
2506.506
CONSTRUCT MANHOLE,
DESIGN C
L.F.
37.1
73
174.11
$
6,459.48
2506.507
CONSTRUCT CATCH BASIN,
DESIGN Y
L.F.
17.85
50
123.98
$
2,213.04
2506.509
CONSTRUCT CATCH BASIN,
DESIGN X
L.F.
1 1.84
132
139.53
$
1,652.04
2506.511
RECONSTRUCT MANHOLE
L.F.
17
20
95.13
$
1,617.21
2506.516
CASTING ASSEMBLY,
TYPE R-1733
EACH
28
111.50
$
2506.516
CASTING ASSEMBLY,
TYPE R-3067
EACH
45
176.97
$
2506.522
ADJUST FRAME AND RING
CASTING
EACH
1
3
122.76
$
122.76
PAGE 3 OF 7 SHORT-ELLIOTT-HENDRICKSON, INC.
•
2511.501
RANDOM RIPRAP CL II
C.Y.
44
2511.516
GEOTEXTILE FILTER
1.81
1457.77
FABRIC, TYPE IV
S.Y.
176
2531.501
CONCRETE CURB & GUTTER,
35.80
$
76.72
DESIGN D618
L.F.
19550
2521.511
2" BITUMINOUS WALK
S.F.
73550
2531.507
8" CONCRETE DRIVEWAY
5.11
$
0.97
PAVEMENT
S.Y.
76
2545.511
LIGHTING UNITS, TYPE B
EACH
27
2545.521
3" RIGID STEEL CONDUIT
L.F.
400
2545.532
DIRECT BURIED CABLE
L:F.
9000
2545.552
FEED POINT
EACH
3
0563.601
TRAFFIC CONTROL
L.S.
1
2564.531
SIGN PANELS - TYPE C
S.F.
280
0564.602
TURN LANE PAVEMENT
MESSAGE
L.S.
6
0564.602
CROSS WALK PAVEMENT
MESSAGE
L.S.
1
2564.603
.4" WIDE SOLID LINE,
WHITE
L.F.
645
2564.603
4" WIDE SOLID LINE,
YELLOW
L.F.
10800
-2564.603
4" WIDE BROKEN LINE,
WHITE
L.F.
670
0564.603
4" WIDE BROKEN LINE,
YELLOW
L.F.
1180
0564.603
12" WIDE SOLID LINE,
WHITE
L.F.
26
0564.603
24" WIDE SOLID LINE,
YELLOW
L.F.
420
0565.602
HANDHOLE - TYPE C
EACH
4
2575.501
ROADSIDE SEEDING
ACRE
10
2575.502
SEED MIXTURE 5
LBS.
500
PAGE 4 OF 7
SHORT-ELLIOTT-HENDRICKSON, INC.
46.03 $
3.17 $
4.17 $
0.28 $
21.99
$
1115.07
$
9.20
$
1.81
1457.77
$
2557.50
$
18.82
$
35.80
$
76.72
$
0.20
$
0.15
$
0.21
$
0.21
$
5.11
$
0.97
$
358.05
$
96.16
$
2.54
$
2575.505
SODDING
S.Y.
6200
1.20
$
2575.511
MULCH MATERIAL, TYPE 1
TON
20
100.25
$
2575.519
DISC ANCHORING
ACRE
10
42.96
$
2575.523
WOOD FIBER BLANKETS
S.Y.
1000
1.16
$
0256.408
8" PVC, 12'-14'DEEP
L.F.
50
50
18.60
$
930.00
0256.408
8" PVC, 22'-24' DEEP
L.F.
80
100
25.54
$
2,043.20
0256.701
STANDARD MANHOLE,
8' DEEP
EACH
1
961.62
$
0256.702
EXCESS DEPTH STANDARD
MANHOLE
L.F.
15
55.24
$
0256.706
MANHOLE DROP SECTION ON
EXISTING MANHOLE
L.F.
8.3
9
115.59
$
959.40
0256.900
CONNECT TO EXISTING
SEWER
EACH
1
1
358.05
$
358.05
0256.910
8" D.I.P. FORCEMAIN
L.F.
1550
1550
12.38
$
19, 189.00
0257.406
6" DIP WATERMAIN, CL 52
L.F.
162
14.97
$
89.82
0257.408
8" DIP WATERMAIN, CL 52
L.F.
320
17.17
$
0257.412
12" DIP WATERMAIN, CL 52
L.F.
1945
17.75
0257.416
16" DIP WATERMAIN, CL 52
L.F.
426
3200
24.95
$
10,628.70
0257.419
BORE 24" STEEL CASING
L.F.
86
105
96.16
$
8.269.76
0257.421
JACK 16" DIP THRU CASING.L.F.
105
30.28
$
0257.606
6" R.S.GATE VALVE & BOX
EACH
10
321.22
$
0257.608
8" R.S.GATE VALVE & BOX
EACH
4
460.35
$
0257.613
12" B.F.VALVE & BOX
EACH
2
731.44
$
0257.617
16" H.F.VALVE & BOX
EACH
2
1366.72
$
0257.630
FITTINGS LESS THAN 12"
LB.
585
1.52
$
0257.631
FITTINGS 12" & LARGER
LB.
10640
1.04
$
0257.633
LOWER WATERMAIN
EACH
2
552.42
$
0257.640
FIRE HYDRANT
EACH
9
1117.11
$
PAGE 5 OF
7 SHORT-ELLIOTT-HENDRICKSON,
INC.
0. 0
0257.806
INSULATION
BD.FT.
64
0.95
$
0257.903
CONNECT TO EXISTING
WATERMAIN
EACH
3
255.75
$ 255.75
0290.01
JAPANESE TREE LILAC 2"
EACH
5
137.08
$
0290.02
AMUR MAPLE 2"
EACH
7
137.08
$
0290.03
CANADA RED CHERRY 2"
EACH
3
132.99
$
0290.04
COLUMNAR BUCKTHORN 36"
EACH
18
28.64
$
0290.05
COMMON PURPLE LILAC 36"
EACH
161
28.64
$
0290.06
GOLD DROP POTENTILLA 18"
EACH
76
18.41
$
0290.07
DWARF AMUR MAPLE 18"
EACH
33
21.48
$
0290.08
RUGOSA ROSE #2 POT
EACH
47
21.48
$
0290.09
BLACK HILLS SPRUCE 6"
EACH
15
132.99
$
0290.10
COLORADO BLUE SPRUCE 6'
EACH
15
132.99
$
0290.11
COLORADO GREEN SPRUCE 6'
EACH
27
.132.99
0290.12
AUSTRIAN PINE 6'
EACH
11
132.99
$
0290.13
PONDEROSA PINE 6'
EACH
12
132.99
$
0290.14
RIVER ROCK, 3/4 - 1-1/2"
G.Y.
30
18.41
$
0290.15
MULCH MATERIAL, TYPE 6
C.Y.
20
18.41
$
\.(11!vl\ 1 V\ 'I''"'II - tluf 11, tIiucu
.Total Contract Amount $ 1,073, 6 0.1 2 Total Amount Earned 210,972.15
Material Suitably Stored on Site, Not Incoporated into Work $
Contract Change Order No. Percent -Complete $
Contract Change Order No. Percent Complete $
Contract Change Order No. Percent Complete $ ,
GROSS AMOUNT DUE.......... .. $ 210,972.15
LESS 5 % RETAINAGE......... $ 10,548.61
AMOUNT DUE TO DATE.......... $ 200,423.54
LESS PREVIOUS APPLICATIONS..... $
AMOUNT DUE THIS APPLICATION.... $ 200,423.54
CONTRACTOR'S AFFIDAVIT
The undersigned Contractor hereby swears under penalty of perjury that (1) all previous progress.
payments received from the Owner on account of work performed under the contract referred to
above have been applied by the undersigned to discharge in full all obligations of the under-
signed incurred in connection with work covered by prior Applications for Payment under said
contract, and (2) all
material and equipment incorporated in said Project or otherwise listed in or covered by -this
Application for Payment are free and clear of all liens, claims, security interests and
encumbrances.
Dated October 26, , 19 87
By
COUNTY OF SS
STATE OF
- Before njq onAh Js TV— day of (f�
Arcon Construction Co., Inc.
Contractor
19-J' personally appeared
me, Wobean u y sworn, did depose
and say tone isgtne c fiof the Contractor above mentioned;
fl c
that he executed the above Application for Payment and Affidavit on behalf of said Contractor;
and that all of the statements contained therein are tr, coect an u lete.
My Commission Expires:
(Notary Pub c
The undersigned has checked the Contractor's Application for Payment shown above. A part of
this Application is the Contractor's Affidavit stating that all previous payments to him
under this Contract have been applied by him to discharge in full all of his obligations in
connection with the work covered by all prior Applications for Payment.
In accordance with the Contract, the undersigned approves payment to the Contractor of the
Amount Due. ,
Date
Page 7 of 7
SHORT ELLIOTT HENDRICKSON, INC.
By