HomeMy WebLinkAbout6.c. Approve Change Order #1, West Ridge 2nd Addition, City Contract #1987-6a DATE: NOVEMBER 13, 1987 TO: MAYOR & CITY COUNCIL C/O ADMINISTRATOR JILK FROM: RICH HEFTI, CITY ENGINEER/PUBLIC WORKS DIRECTOR RE: ITEMS FOR NOVEMBER 17, 1987 COUNCIL MEETING OLD BUSINESS 6c. Approve Change Order #1 for West Ridge Second Addition City Contract 1987-6 Our Consulting Engineer is recommending that Council approve this change order' which provides for relocation of one hydrant and an extension of the completion date of the project. The hydrant that needed to be relocated was at the intersection of Danville Avenue and 160th Street. This hydrant was installed prior to the installation of the six foot concrete sidewalk'in this subdivision. At the time the hydrant was installed the walkway was contemplated to be only a four or five foot walkway. Because the hydrant was installed six feet inside the property line, the conflict with the new sidewalk occurred. Our Consultants are recommending we also extend the substantial completion date to October 23, 1987, which was the scheduled final completion date, because of some additional work that we requested be performed. Specifically, an extension to an existing storm sewer pipe in the First Addition which had badly eroded at the original outlet and some structure adjustments do to grade changes. I find that the Consultants recommendations are legitimate and would recommend that Council approve Change Order #1, a copy of which is attached, to Contract 1987-6, West Ridge Second Addition, to American Contracting and increase the contract amount by $851.00 and authorize the Mayor to execute all related documents. AMW , , AW ANGE ORDER .waw ENGINEERS N ARCHIfEC'►5 •FlANN6Q5 rrtt 222 EA5TLITTLECANADA ROAD, ST. PAUL MINNESOM 55117 612 484.0272 NOV Q RE("iV � OWNER City of Rosemount DATE 10/15/87 OWNERS PROJECT NO. 167 CHANGE ORDER NO. 1 PROJECT DESCRIPTION West Ridge 2nd Addition SEH FILE NO. 87123 The following changes shall be made to the contract documents Description: 1. Relocate hydrant at 160th St. W and Danville Ave. Add $851 2. Revise the substantial completion date to Oct. 23, 1987 No Change Purpose of Change Order: R E „� C E I � V T � D SHORT ELLIOTT HENI)RICK,SON, INC. 140V 0 5 1987 Basis of Cost: 63 Actual o Estimated Add $851.00 _U- PAUL Attachments (list supporting documents) Contractors Invoice #1980 Contract Status Time Cost Original Contract { Net Change Prior CO.'s to Change this C.O. Revised Contract Recommended for Approval: Short-Eiflott-Hendrickson Inc. pp c. By Agreed to by Contractor. Approved for Owner: Bye,By Title �-/A L 4t't By Distribution Contractor 2 Owner I Project Representative i SEH office i 511ORT EI IJOTT ,r rAUL CFIiPrrW.n ruts. 1*,NPRI(k;0N INC MrNNF_SOrA W151CONSrN AP'jkK l UAN uur4 i io\u 1 i Nu uui<r 116Ei Eagle Street N.W. boon Rapids, Minnesota 55433 Sold To ■ City of Rosemount 2875 145th Street W. • Rosemount, Minnesota 55068 Is No. 1480 Date September 22, 1987 Your Order No. Shipped to • West Ridge 2nd Addition Project No. 167 • Rosemount, Minnesota Our Order No. Salesman Terms F.O.B. bate Shipped Shipped VIA Quantity Ordered Quantity Shipped Stock Number/Description Unit Price Unit Amount September 9, 1987 Relocate hydrant at 160th Street W. and Danville r Avenue as directed by Short, Elliott, Hendrick on. Labor 21h Hours - 1 Crew @ $296.00/tir. $740 00 15% Profit and Overhead 111 00 TOTAL INVOICE $851 00 WilsonJones /invoice GRAvUME H)FiM 1A•tn 3-tMRT r, t983 • PRIM t EO 114 U S A 86 i