HomeMy WebLinkAbout5.f. Approve Application for Final Payment, Erickson Park IrrigationDATE: DECEMBER 10, 1987 TO: MAYOR & COUNCILMEMBERS C/O STEVE JILK, CITY ADMINISTRATOR FROM: CITY ENGINEER/PUBLIC WORKS DIRECTOR HEFTI RE: ITEMS FOR THE DECEMBER 15, 1987 COUNCIL MEETING OLD BUSINESS Final Payment/Acceptance Erickson Park Irrigation System City Contract 1987-3 The Contractor has completed the installation of the irrigation system and Staff has verified its successful operation. There appears to be one minor item that is in question as to whether it was constructed to the specifications. That happens to be the use of non -waterproof junction boxes within the hose tower area in the Fire Hall. I have to admit the specifications were not clear as to requiring the installation of waterproof junction boxes within the hose tower area. Still, it would appear to me that the electrical sub -contractor should have caught this and brought it to my attention, or the State Electrical Inspector should have required this. I understand that the State Electrical Inspector has approved the wiring, however I am awaiting some verification of this. Therefore, I would like to propose that Council authorize the final payment of this project to the Contractor, Albrecht Construction, less the amount due his electrical sub -contractor, Corrigan Electric. I propose to hold onto the payment due Corrigan Electric until we can reach a satisfactory solution to this matter. The reason I want to pursue final payment is that this item was budgeted under the 1987 C.I.P., and we would like to be able to close the books for '87 C.I.P. at the end of this year. I will be available to discuss this matter in further detail if the Council so desires. M Recommended for Approval: Accepted by Contractor: -- - Public Works DepDate Albrecht Co. t Date Approved by: ------------------------------ Finance Director Date CITY OF ROSEMOUNT REQUEST FOR PAYMENT NO. 2 & FINAL ERICKSON PARK IRRIGATION SYSTEM PROJECT NO.: 173 DATE: December 2, 1987 CONTRACT NO.: 1987-3 FOR PERIOD: 07/03/87 to CONTRACTOR: Albrecht Co. 12/02/87 ADDRESS: 1408 W Co Rd C Roseville, MN 55113 1 Original Contract Amount $34,808.00 2 Change Orders ------------ Add $1,800.00 ------------ Deduct 3 ------------ Revised Contract Amount $36,608.00 4 Work Completed to Date ------------ $36,017.00 5 Materials Stored Onsite ------------ $0.00 6 Gross Amount Due ------------ $36,017.00 7 Less Retainage ------------ $1,173.51 8 Amount Due to Date ------------ $34,843.49 9 Less Previous Payments ------------ $31,668.25 10 TOTAL AMOUNT DUE THIS APPLICATION $3,175.24 Recommended for Approval: Accepted by Contractor: -- - Public Works DepDate Albrecht Co. t Date Approved by: ------------------------------ Finance Director Date 0 PROJECT: Erickson Park Irrigation System 2nd & FINAL PROJECT NO.: 173 December 2, 1987 CONTRACT NO.: 1987-3 STATEMENT OF WORK COMPLETED Contract Aty to Unit Item Unit Qty Date Price Amount Furnish & Install One (1) - - - Automatically Controlled Irrigation System for Softball fields #4 & #5 & soccer field at Erickson Park Lump Sum 1 1 $30,395.00 $30,395.00 6" Perforated PE Pipe Drain -------------------------------------------------------------------------------- Lin. Ft. 750 650 $5.88 $3,822.00 $34,217.00 Change Order #1 Furnish & Install infield system for fields 4 & 5 Each 2; 2 $900.00 $1,800.00 Total Work to Date $36,017.00