Loading...
HomeMy WebLinkAbout5.d. City Hall Parking LotP. % r3 b y Of o 2875-145111 ST W ROSEMOUNT, MINNESO1 A 55068 osernan 612 423-4d„ TO: Mayor Knutson Councilmembers Napper Tucker Walsh Willard FROM: Stephan Jilk, Administrator/Clerk DATE: December 11, 1987 RE: City Hall Parking Lot Arbitration Attached is a copy of the ruling from the Arbitrator on the resolution for the completion of the west parking lot. The decision was that the contractor would be liable for the patching of the low spots on the "ponding" areas to obtain proper drainage and then seal coat the entire lot. The dollar value assigned to the work is $3,000. The city's option at this point is to simply reduce our payment by $3,000 to Arkay Construction and have the work completed on our own or have them complete it and pay the entire amount when completed. We will also have to pay interest from July 7, 1987 on the amount we owed for the parking lot, less the $3,000; and of course, now the amount of principal for the lot less the $3,000 is due. Staff recommends that we pay the amount due on the lot, including interest from July 7, 1987, retain the $3,000 for the additionai work and require H.&S. Construction to do the work. We feel we should hold H.&S, responsible and letting them out with a $3,000 loss on the project isn't the way to do it. Also, there are a couple of sections of curbing needed to be raised, by Arkay, as part of this drainage problem. These then could be done by Arkay at the time the lot is repaired and seal coated. Your consideration of this recommendation would include the release of $14,000 and the retainage of $3,000 to insure the lot is repaired. smj LAW OFFICES GRANNIS, GRANNIS, FARRELL & KNUTSON DAVID L. GRANNIS - 1874-1961 PROFESSIONAL. ASSOCIATION TELECOPIER: DAVID L. GRANNIS, JR. - 1910-1980 POST OFFICE Box 57 (612) 455-2359 VANCE B. GRANNIS 403 NORWEST BANK BUILDING DAVID L. HARMEYER M. CECILIA BAY VANCE B. GRANNIS, JR. 161 NORTH CONCORD EXCHANGE ELLIOTT B. KN£TSC,H PATRICK A. FARRELL DAVID L. GRANNIS, III SOUTH ST. PAUL, MINNESOTA 55075 MICHAEL J. MAYER ROGER N. KNUTSON PHRECEIVED TELEPHONE: (612) 455-1661 December 3, 1987 IJ EC 04 197 Mr. Stephan Ji lk CLERK'S OFFICE CITY OF ROSEMOUNT City Administrator City of Rosemount 2875 145th Street West Rosemount, Minnesota 55068 Re H & S Asphalt vs. Arkay Construction and the City of Rosemount Dear Steve: In regard to the above matter, I enclose the following: 1.) Copy of letter dated December 1, 1987, from American Arbitration Association; 2.) Copy of Award of Arbitrators dated December 1, 1987; and 3.) Contract documents for the Project and other documents introduced at the Arbitration. If you have any questions regarding the Award, please call me. Very truly yours, GRANNIS, GRANNIS, FARRELL & KNUTSON By David L. Grannis, III DLGIII/klt Cr7IIED TO: Encs. Philldir- 514 Nicollet Mail Suite 670 AMERICAN ARBITRATION Minneapolis, Minnesota 55402-1092 qA,* ASSOCIATION (612) 332-6545 ARBITRATION # FACT-FINDING * MEDIATION * MINI -TRIALS * ELECTION SERVICES a DISPUTE RESOLUTION TRAINING James R. Deye negionst Vice Presidefif Deepiatier 11 1987 Minnesota North Dakota Richard 7'. K%,Avartey South Dakota St1^iY1IjP1'q f."CAWtVIVY & lichleder Wisconsin 12(m) Normmit Coriter St. P"aL1117 MN 5511:t1 J,. -Ain N. Schmidt REGIONAL OF1ICFF.jt_I(.;.Ay Coror.,tructictri Clomp.-Arly Atlantaf;r'r.=.'l)North C'ol.tril;y Road 18, E.31.tite 18'.3 Boston MN 55 4 2 7 4 3 t.5 8 Charlotte Chicago Cincinnati Di.Avld L. GrAririisq I I I Cleveland G) V' A r I r I i G7 1 G r.R rt r I i f81 FtArre 11 & K 11 Ll t Y I Dallas 403 Norwest P;.Ayik Du i I d i riq Denver South St. PA 1.111 MN 5 ':1 c 17 15 Detroit Garden City F?I':* Cric;e No. 56 1 1 C) 01 ;:.-! 1 1.3.7 Hartford F. f S' 0S1: -+#)LT CA31YIPANY Honolulu Houston And Kansas City ARKAY G0NS,rRLA,'Tl(..*)N G(JMl::'(*)NY arid Los Angeles CITY OF ROSEMOUN*r Miami Minneapolis Nashville By directiorl of the ffi-bitre-.-%tc-lr/ we herewith trarlstilit to New Orleans you the ditty executed Award in the above­cApt ioned matt or. New York Philadelphia ThAritc you fctr usirig the AAA. We hope the experierice hiAv; Phoenix beeri worthwhile rand that you will consider arbitratiori irt Pittsburgh San Diego other uoritext-,, to at -mist in the expeditiouci; mettlerilent of San Francisco ocifilraerclial dir*putc-m. We look formArd to wi.-Irking with you 'we riezAr future. San Jose irt tt San Juan Seattle Somerset. NJ Syracuse / I` i-,-1, Washington. D C. N(IINK."Y GiLiAt While Plains TR I 1-A.)N('.1l_ - ( DM I N I f:31* RATOR cc: Willi -am R. F"arriteter 0 AMERICAN ARBITRATION ASSOCIATION CONSTRUCTION INDUSTRY ARBITRATION TRIBUNAL. w......._..w.._...._.._.. _.... ...... .... ....... ........ ......... ... _....... In the Matter of the Arbitr teat i ol', betweey, H & S ASPHALT COMPANY AND ARKAY CONSTRUCTION COMPANY arid CITY OF ROSEMOUNT Casey No. !;G 110 0121 87 AWARD OF ARBITRATOR I, THE' UNDERSIGNED ARBITRATOR, having beam designated in accordance with the Arbitration Agreement enterrer:t into by the above-named Parties, and c1«atv.d April 2'!.31 1986 and having duly sworn and having &.11.,y heard the proaffts and allegations of the Parties, AWARDS ars follows: 'The due the C'sc:,rrtractor, Orkay Gcororstr►.tt. t iOrl Comp ar-ly, and the artbrontrractcv-, 14 & S (1s;phalt Company, by the Owner, They City of Rcls,emor..tnt, ar•e [')Ayable SUb..)eCt to the i lowing s t�. 11 & 9 Asphalt Shall C•.orrP`C"t tlrV-A r:tr.tb.jec.t West Plarkirry L.o L as follows: 1. N{:gin -drrainin4 arcrara rnferred to As lc -.,w spi;:,ts, bird baths or pockets shall be tacked and patched to the extent required to provide proper drainage. 2. I.I..tf, entire lot shall be qr.. a1.0QAted with J.) V" 130V- bitUfflinOUS material arid arlyregate. The rte: I oar vwlLie 0f this~ 5 suet at $3, 000. 00. 8. As pert airl", to t:lhe mnatter of this, arbitrat icon proceed iny, intrarFasst atthe legal prescribed rate in the areas of the prc;1.ject shall be paid by the c+wner to the rov)trac,tor And thus to the sratlecintractor on all moniet'r dup. rar�ci not paid the c<:,ntrAct,:or Arid thea, ubvontrActor" under a Cert i f i cert e Payrrrant i saSr.tt.*d by the Architect as of the date for nuormal payment under that Certificate. (::. The cost r:,•f the carbi.trratioro Rroc:eed11-19S Shall tie S1)it evenly between the City of Rro scumcor.tnt, Owner, Arkay C;onsatrrtct ion Company, Contractor, arid 1.1 & a Asphalt Company, 9u1,:rcorrtractoar^. This, Awarc:l is in full syett.lel ent; of all clrairtim br•,41It try this arbitral;• ic'n. � WILL Ir�M c�rrr�Ml-:1rMr1, ARBI rr:�ar rt